Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II Mission

completedLaunch 2026-069
Launched 4/1/2026HEOService GSat DSO E
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
5 payloads
Artemis II
retired
Human Spaceflight
GEO
ATENEA
retired
Technology Demonstrationsuborbital
K-RadCube
retired
Technology Demonstrationsuborbital
SWC-1
active
Science ExplorationGEO
TACHELES
retired
Technology DemonstrationGEO
Launch Details
Launch Date
4/1/2026
Launch ID
2026-069
Launch Profile
Sat DSO E
Service Type
G
Orbit
HEO
Launch Stack
Operator
NASA Marshall Space Flight Center
Launch Vehicle
SLS Block 1
Launch Site
Launch Complex 39B, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)US
Payload Summary
Payload Count
5
Payload Status
retired 4 / active 1
Payload Mission Types
Technology Demonstration 3 / Human Spaceflight 1 / Science Exploration 1
Track
Mentions
165
All verified mentions of this mission in source documents.

Jenni Gibbons was selected as Canada’s backup to Jeremy Hansen for the Artemis II mission specialist role.

GovernanceValue 4.0Feb 23, 2026Moon Monday #263: Artemis II, a Canadian capcom, Chandrayaan, and Long March 10

NASA will roll the Moon rocket for the Artemis II mission off the launch pad as soon as Feb. 24, weather pending.

PlanGeneralValue 4.0Feb 22, 2026RT by @GewoonLukas_: As soon as Tuesday, Feb. 24, we will roll our Moon rocket for Artemis II mission off the launch pad, weather pending. Engineers are continuing to prepare for the move after encountering an issue with the flow of helium to the rocket’s upper stage. Details: pic.

John Honeycutt, chair of the Artemis II Mission Management Team, has a high level of confidence in the current vehicle configuration at the pad.

GovernanceValue 3.0Feb 20, 2026NASA pushes forward with a possible Artemis 2 March launch with caveats

NASA is targeting no earlier than March 6 for the launch of the Artemis II mission, pending completion of required work at the launch pad and analysis of test data.

PlanValue 4.0Feb 20, 2026RT by @GewoonLukas_: We are targeting no earlier than March 6 for the launch of Artemis II, pending completion of required work at the launch pad and analysis of test data. The Artemis astronauts have entered quarantine to remain in good health before the mission. pic.

NASA is targeting March 6 as the earliest launch opportunity for the Artemis II mission.

PlanValue 4.2Feb 20, 2026NASA successfully completed the 2nd Wet Dress Rehearsal for Artemis II yesterday, with only some minor issues being worked. Launch is officially targeted for NET March 6th! (Mar. 7 at 01:29 UTC) This is pending the Flight Readiness Review next week and remaining work at the pad.

Budget priorities tied to human exploration and NASA's Artemis II mission have caused the Mars Sample Return program to advance at a more moderate pace.

PlanFinancialValue 3.0Feb 19, 2026M. Muñoz (NASA): "Podríamos tener indicios de vida primitiva en las muestras recolectadas en Marte"

NASA cleared the path for a critical pre-launch wet dress rehearsal of the Artemis II mission.

PlanValue 3.6Feb 17, 2026Engineers replace faulty filter as NASA clears path for Artemis 2 wet dress rehearsal

Integrasys is participating in the Artemis II mission by tracking and analyzing the trajectory of the crewed spacecraft that will orbit the Moon.

CapabilityGeneralValue 4.0Feb 17, 2026Á. Sánchez (Integrasys): "La conciencia situacional espacial es clave para la defensa"

Integrasys will measure the Doppler effect to determine the velocity and position of the Artemis II mission in deep space.

CapabilityValue 4.0Feb 17, 2026Á. Sánchez (Integrasys): "La conciencia situacional espacial es clave para la defensa"

Leaks observed during the SLS full-fueling test on February 2 delayed the Artemis II mission.

PlanGeneralValue 4.0Feb 16, 2026China conducts a multi-element test unlike any other nation in firm march to Luna | Moon Monday #262

NASA published a post describing how the agency will track the Artemis II mission using a network of ground stations.

PlanCapabilityValue 3.2Feb 9, 2026Moon Monday #261: A shortfall in Artemis II testing and NASA’s communications

NASA selected 34 global volunteers to track the Orion spacecraft during the crewed Artemis II mission’s journey around the Moon.

CapabilityGeneralValue 3.8Feb 6, 2026NASA Selects Participants to Track Artemis II Mission

NASA completed a wet dress rehearsal for the Artemis II mission in the early morning on February 3, 2026.

PlanValue 3.6Feb 3, 2026Artemis II: NASA rinvia il lancio dopo il wet dress rehearsal

NASA completed a wet dress rehearsal for the Artemis II mission in the early morning hours of Feb. 3, 2026.

PlanGeneralValue 3.5Feb 3, 2026Last night, NASA completed the 1st WDR for Artemis II. Teams ran into several issues such as LH2 leaks and audio dropouts, but were able to count down to T-5:15. To allow time to investigate and complete another WDR, NASA is now targeting March (NET 7th at 01:29 UTC) for launch.

NASA will target March 2026 as the earliest possible launch opportunity for the Artemis II mission to allow teams to review test data and conduct a second wet dress rehearsal.

PlanValue 4.2Feb 3, 2026Artemis II: NASA rinvia il lancio dopo il wet dress rehearsal

The postponement to a March 2026 launch window does not change the objectives of the Artemis II mission.

PlanGeneralValue 3.0Feb 3, 2026Artemis II: NASA rinvia il lancio dopo il wet dress rehearsal

The MER team will analyze Orion technical data during the Artemis II mission to assist flight control with optimizations and anomalies.

PlanCapabilityValue 3.0Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

NASA developed real-time monitoring systems to observe the Artemis II mission and its crew during flight.

CapabilityPlanValue 3.5Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

April 2026 is the formal planning backstop date for the Artemis II mission if weather or technical issues push the launch later.

PlanGrowthValue 4.0Jan 31, 2026The Perception War: How Artemis II Could Win the Race Without Landing

NASA plans to launch the Artemis II mission, which is set to be the first crewed flight around the Moon in more than 50 years.

PlanGeneralValue 3.8Jan 30, 2026Earliest launch window to ISS set for February 11: NASA
Page5of9