Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II Mission

completedLaunch 2026-069
Launched 4/1/2026HEOService GSat DSO E
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
5 payloads
Artemis II
retired
Human Spaceflight
GEO
ATENEA
retired
Technology Demonstrationsuborbital
K-RadCube
retired
Technology Demonstrationsuborbital
SWC-1
active
Science ExplorationGEO
TACHELES
retired
Technology DemonstrationGEO
Launch Details
Launch Date
4/1/2026
Launch ID
2026-069
Launch Profile
Sat DSO E
Service Type
G
Orbit
HEO
Launch Stack
Operator
NASA Marshall Space Flight Center
Launch Vehicle
SLS Block 1
Launch Site
Launch Complex 39B, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)US
Payload Summary
Payload Count
5
Payload Status
retired 4 / active 1
Payload Mission Types
Technology Demonstration 3 / Human Spaceflight 1 / Science Exploration 1
Track
Mentions
165
All verified mentions of this mission in source documents.

Sky Perfect JSAT Corporation (Skaparu JSAT) was selected as a ground station to receive signals from the Orion spacecraft during the Artemis II mission.

RelationshipsGeneralValue 4.0Jan 30, 20261/30宇宙ニュース・国際宇宙ステーション長期滞在「Crew-12」、2/11(水)に打上げへ ほか3件

SKY Perfect JSAT was selected as a ground station to receive one-way Doppler measurement signals from the Orion spacecraft for NASA’s Artemis II mission on January 26.

RelationshipsGeneralValue 4.0Jan 27, 2026スカパーJSAT、月探査計画「アルテミス2」の地上局に選定–アジアの民間企業で唯一

Integrasys and the University of Seville were selected by NASA to voluntarily track the Orion spacecraft during the crewed Artemis II mission around the Moon.

RelationshipsGeneralValue 4.0Jan 26, 2026Integrasys y la Universidad de Sevilla, seleccionadas por la NASA para el seguimiento de la misión Artemis II

The antenna Integrasys will use to track the Artemis II mission has a diameter of 2.4 meters and cannot be installed on the roof of Integrasys’s Seville headquarters.

CapabilityPlanValue 4.0Jan 26, 2026Integrasys y la Universidad de Sevilla, seleccionadas por la NASA para el seguimiento de la misión Artemis II

NASA targets a Q1 launch for the Artemis II mission to fly humans around the Moon and back.

PlanGeneralValue 4.0Jan 26, 2026Moon Monday #259: Lunarbound astronauts enter quarantine as Artemis II launch approaches

Engine number 2063 was originally installed on the SLS core stage for the Artemis II mission but was removed in 2025 due to a hydraulic leak in the main oxidizer valve actuator.

PlanCapabilityValue 4.5Jan 25, 2026La NASA completa il test di accensione del motore RS-25 per Artemis IV

NASA is conducting an integrated assessment of components involved in the Artemis II mission to confirm overall system readiness.

GeneralValue 2.0Jan 22, 2026NASA: decisione sulla data di lancio di Artemis II rinviata

The European Service Module will provide propulsion for the Orion spacecraft during the Artemis II mission.

CapabilityGeneralValue 4.0Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

The Space Launch System (SLS) rocket is positioned on the launch pad at Cape Canaveral for the Artemis II mission.

PlanGeneralValue 4.0Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

Eduardo García Llama, engineer chief of flight controllers for the Artemis II mission, was a NASA member who participated in the 2023 Houston meeting about the project.

GovernanceValue 2.4Jan 19, 2026Creer en la juventud es creer en el futuro

The goal of the Artemis II mission is to prove Orion's ability to carry people and conduct observations on the Moon and the human body.

CapabilityGeneralValue 3.5Jan 16, 2026One step closer to the Moon: Artemis 2 rocket ready for the pad

John Honeycutt is the Artemis II mission management team chair.

GovernanceValue 3.0Jan 16, 2026RT by @Cosmic_Penguin: 13/ John Honeycutt, Artemis II mission management team chair, says part of his job is to watch out for moving too fast. "I'm not going to tell the agency that I'm ready to go fly until I'm ready to go fly."

John Honeycutt is the Artemis II Mission Management Team chair.

GovernanceValue 4.0Jan 16, 2026RT by @Cosmic_Penguin: Artemis II MMT chair John Honeycutt. If you ever wanted to know what crew safety means to these folks... Listen to him here. pic.

The Artemis II mission is scheduled for a flight around the Moon.

PlanValue 3.0Jan 16, 2026Missione Artemis II, aperta la campagna per inviare i nomi a bordo

The Moon rocket and spacecraft for the Artemis II mission are being rolled out to the launch pad.

PlanValue 3.0Jan 16, 2026RT by @Cosmic_Penguin: LIVE NOW: NASA experts give updates on the Artemis II mission before rollout of the Moon rocket and spacecraft to the launch pad.

The deadline for submitting names for the Artemis II mission is January 21, 2026.

PlanValue 3.0Jan 16, 2026Missione Artemis II, aperta la campagna per inviare i nomi a bordo

NASA Artemis announced on January 14, 2026, the opening of a campaign allowing the public to submit their names to be symbolically transported aboard the Artemis II mission.

PlanGeneralValue 2.5Jan 16, 2026Missione Artemis II, aperta la campagna per inviare i nomi a bordo

The only waste jettisoned during the Artemis II mission is urine.

CapabilityGeneralValue 2.8Jan 14, 2026Where does the trash go? And how Artemis 2 astronauts stay organized

The Artemis II mission will fly by the Moon at a higher altitude than previous Apollo orbits.

PlanCapabilityValue 3.5Jan 12, 2026Visualizing the deep space flyby: Why Artemis 2 is NASA’s new “Earthrise” moment

The Artemis II mission will focus on science and learning to sustain a presence on another world.

GeneralValue 2.0Jan 12, 2026Visualizing the deep space flyby: Why Artemis 2 is NASA’s new “Earthrise” moment
Page6of9