Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II Mission

completedLaunch 2026-069
Launched 4/1/2026HEOService GSat DSO E
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
5 payloads
Artemis II
retired
Human Spaceflight
GEO
ATENEA
retired
Technology Demonstrationsuborbital
K-RadCube
retired
Technology Demonstrationsuborbital
SWC-1
active
Science ExplorationGEO
TACHELES
retired
Technology DemonstrationGEO
Launch Details
Launch Date
4/1/2026
Launch ID
2026-069
Launch Profile
Sat DSO E
Service Type
G
Orbit
HEO
Launch Stack
Operator
NASA Marshall Space Flight Center
Launch Vehicle
SLS Block 1
Launch Site
Launch Complex 39B, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)US
Payload Summary
Payload Count
5
Payload Status
retired 4 / active 1
Payload Mission Types
Technology Demonstration 3 / Human Spaceflight 1 / Science Exploration 1
Track
Mentions
165
All verified mentions of this mission in source documents.

NASA’s Artemis II mission is scheduled for Wed Apr 1, 2026 at 18:24 EDT on an SLS Block 1 launch from LC-39B at Kennedy Space Center in Florida, USA.

PlanGeneralValue 4.0Apr 1, 2026Apparently it did NOT happen overnight, so now:

NASA’s Space Launch System rocket launched the Artemis II mission from Launch Complex 39B at 6:35 p.m. EDT on April 1.

PlanGeneralValue 4.0Apr 1, 2026Liftoff: NASA Successfully Launches Artemis II to the Moon

Integrasys is the only Spanish company selected by NASA to track the Orion spacecraft for the Artemis II mission.

RelationshipsPlanValue 4.0Apr 1, 2026La española Integrasys rastreará el vuelo de la nave Orion en la misión Artemis II

NASA launched the Artemis II mission on Wednesday night using the Space Launch System rocket with the Orion crew capsule.

PlanValue 4.0Apr 1, 2026Artemis II Is On The Way To The Moon

NASA’s Artemis II mission will launch from Kennedy Space Center.

PlanValue 3.8Mar 31, 2026Artemis II, Orion integra ESM-2 per missione con equipaggio

Crew Active Dosimeters developed by Mirion will be carried in astronauts’ pockets aboard the Artemis II mission.

PlanCapabilityRelationshipsValue 4.3Mar 30, 2026Crew Active Dosimeters to Be Worn by Artemis II Astronauts

The anomaly on Starlink satellite 34343 posed no new risk to the International Space Station, its crew, or NASA's Artemis II mission.

GeneralValue 2.5Mar 30, 2026Starlink satellite s/n 34343 was launched from Vandenberg on May 27 last year as part of Group 17-1, a few hours before Starship Flight 9 get to its planned path but then spun out of control before things could have been done:

NASA’s Artemis II mission will fly four astronauts around the Moon and back.

PlanCapabilityValue 4.0Mar 30, 2026Ignition, not yet liftoff, of NASA’s ambitious Artemis Moonbase plans | Moon Monday #268

NASA’s Artemis II mission is scheduled to fly four astronauts aboard Orion on 1 April.

PlanValue 4.0Mar 28, 2026Así es el cerebro térmico madrileño que llevará a la Humanidad de regreso a la Luna

NASA's Artemis II mission is scheduled to launch on April 1, 2026 at 22:24 UTC.

PlanValue 4.6Mar 25, 2026Pinned: L-1 week 🌑 1 week from today, NET April 1st at 22:24 UTC, NASA's Artemis II mission is scheduled to launch. Artemis II will be the first time humans will travel to the Moon since Apollo 17 in 1972, and could set a new record for the farthest anyone has ever traveled from Earth.

The Space Launch System rocket and Orion spacecraft for the Artemis II mission arrived at the launch pad at 11:21 a.m. today.

PlanValue 4.0Mar 20, 2026RT @NASAArtemis: The Space Launch System rocket and Orion spacecraft for the Artemis II mission arrived to the launch pad today at 11:21am…

The Artemis II mission still has a possible first launch attempt on Wednesday, April 1 at the opening of the planned launch window.

PlanValue 4.0Mar 18, 2026Artemis II slitta di 24 ore per controlli ai sistemi di volo

The Space Launch System and Orion are being prepared for the Artemis II mission.

PlanValue 3.2Mar 16, 2026Artemis II: SLS e Orion tornano alla rampa 39B il 19 marzo

John Honeycutt is chair of the Artemis II Mission Management Team.

GovernanceValue 2.4Mar 12, 2026NASA Clears Artemis II for Launch, Targeting April 1 Crewed Mission Around the Moon

Canadian Space Agency astronaut Jenni Gibbons is assigned as the Capsule Communicator (Capcom) for the Artemis II mission.

GovernancePlanValue 3.8Mar 4, 2026The voice of mission control: Jenni Gibbons on guiding Artemis 2 to the Moon

The primary next milestone for NASA is the successful launch and completion of the Artemis II mission, with its objectives unchanged.

PlanValue 3.0Mar 3, 2026Probemission vor der Mondlandung an

NASA plans to hold a media event in the coming days to outline the rollback activities and provide an update on preparations for the Artemis II mission.

PlanValue 2.0Mar 1, 2026NASA prepares Artemis II rocket for rollback after upper stage issue

The launch of the Artemis II mission has been recently postponed to this April after multiple delays.

PlanGeneralValue 3.2Feb 27, 2026Trump reivindica la Fuerza Espacial pero omite la misión Artemis II en su discurso sobre el Estado de la Unión

The Artemis II mission is the first crewed flight of NASA’s Artemis program.

GeneralValue 1.8Feb 23, 2026Artemis II, NASA prepara il rollback del razzo SLS

On February 19, NASA fully fueled the Space Launch System rocket and performed a practice countdown test for the Artemis II mission.

PlanValue 4.0Feb 23, 2026Moon Monday #263: Artemis II, a Canadian capcom, Chandrayaan, and Long March 10
Page4of9