Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis I Mission

completedLaunch 2022-156
Launched 11/16/2022HEOService GSat DSO E
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
11 payloads
ArgoMoon
retired
Science Exploration
cislunar
Artemis I
retired
Human Spaceflightcislunar
BioSentinel 1
active
Science Explorationcislunar
CuSP
retired
Science Explorationcislunar
EQUULEUS
retired
Science Explorationcislunar
LunaHMap
retired
Science Explorationcislunar
Lunar IceCube
retired
Science Explorationcislunar
LunIR
retired
Science Explorationcislunar
Miles
retired
Science Explorationcislunar
NEA Scout
retired
Science Explorationcislunar
OMOTENASHI
retired
Science Explorationcislunar
Launch Details
Launch Date
11/16/2022
Launch ID
2022-156
Launch Profile
Sat DSO E
Service Type
G
Orbit
HEO
Launch Stack
Operator
NASA Marshall Space Flight Center
Launch Vehicle
SLS Block 1
Launch Site
Launch Complex 39B, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)US
Payload Summary
Payload Count
11
Payload Status
retired 10 / active 1
Payload Mission Types
Science Exploration 10 / Human Spaceflight 1
Track
Mentions
267
All verified mentions of this mission in source documents.

Frank Rubio will be in Star City when NASA is scheduled to launch the Artemis 1 mission on 2022-08-29.

PlanValue 4.0Aug 25, 2022NASA astronaut ready for Soyuz flight to ISS

Wesley Faler has spent more than a decade developing and refining the plasma thrusters set to fly for the first time on a cubesat launching alongside NASA’s Artemis 1 mission.

CapabilityPlanValue 4.0Aug 24, 2022Team Miles prepares for inflight test of new thruster technology

The 2022-08-22 flight readiness review confirmed plans for a launch of Artemis 1 from Kennedy Space Center’s Launch Complex 39B as soon as 8:33 a.m. Eastern on 2022-08-29 at the beginning of a two-hour window.

PlanGeneralValue 4.0Aug 23, 2022Artemis 1 passes flight readiness review

The Orion spacecraft on Artemis 1 will spend between 26 and 42 days on the mission with at least six days in a distant retrograde orbit around the Moon.

PlanCapabilityValue 4.4Aug 23, 2022Terran Orbital Integrates LunIR Into NASA’s Space Launch System

A flight readiness review for Artemis 1 was completed on 2022-08-22.

PlanValue 2.0Aug 23, 2022Artemis 1 passes flight readiness review

Testing the heat shield at lunar reentry velocities of about 40,0 m per hour is the top objective for Artemis 1.

PlanCapabilityValue 3.6Aug 23, 2022Artemis 1 passes flight readiness review

Artemis 1 will launch from Launch Complex 39B at the Kennedy Space Center.

PlanGeneralValue 3.8Aug 23, 2022Terran Orbital Integrates LunIR Into NASA’s Space Launch System

Artemis 1 will launch from Complex 39B at NASA’s Kennedy Space Center.

PlanValue 4.0Aug 18, 2022Terran Orbital Delivers LunIR To Cape Canaveral For Artemis 1 Launch

If Artemis 1 does not launch by 2022-09-05, the vehicle would have to roll back to the Vehicle Assembly Building to recertify the flight termination system.

PlanCapabilityValue 4.0Aug 13, 2022NASA, Space Force resolve SLS flight termination system issue

The next Artemis 1 launch period after the current window opens 2022-09-20 and runs through 2022-10-04.

PlanGeneralValue 3.0Aug 13, 2022NASA, Space Force resolve SLS flight termination system issue

Artemis 1 will carry three mannequins, including a male mannequin named Commander Moonikin Campos and two female mannequin torsos equipped with sensors to detect space radiation.

CapabilityGeneralValue 4.0Aug 12, 2022Why NASA Wants to Go Back to the Moon

Artemis 1 is an uncrewed mission scheduled to launch in late August with a planned launch date of 2022-08-29 and backup dates on 2022-09-02 and 5.

PlanValue 4.0Aug 12, 2022Why NASA Wants to Go Back to the Moon

Blue Canyon Technologies is supporting several NASA launches, including the uncrewed Artemis 1 moon rocket scheduled for 2022-08-29.

RelationshipsPlanValue 4.0Aug 9, 2022Blue Canyon Technologies Opens New Factory Dedicated to Manufacturing CubeSats

Lunar IceCube is integrated into NASA’s Space Launch System rocket to fly on the uncrewed Artemis I mission launching 2022.

PlanCapabilityGeneralValue 4.2Aug 9, 2022NASA’s Moon-observing smallsat is ready for its Artemis launch

Blue Canyon Technologies expects to support several NASA launches, including the uncrewed Artemis 1 moon rocket scheduled for 2022-08-29 and the Starling mission at the end of 2022.

PlanCapabilityValue 4.2Aug 7, 2022Blue Canyon opens new smallsat manufacturing facility in Colorado

Reid Wiseman briefed at the Johnson Space Center on 2022-08-05 about the upcoming uncrewed Artemis 1 mission.

PlanGeneralValue 2.0Aug 6, 2022Entire NASA astronaut corps eligible for Artemis missions

Crews working since NASA’s 2022-07-20 target announcement completed repairs to the SLS and installed payloads inside the Orion capsule for Artemis 1.

PlanCapabilityValue 4.0Aug 3, 2022First SLS launch remains on schedule for late August

NASA provided performance data from Artemis 1 systems to the Eastern Range for its review.

RelationshipsCapabilityValue 3.6Aug 3, 2022First SLS launch remains on schedule for late August

Technicians powered on the Orion spacecraft for the final time before the Artemis 1 launch during the weekend before 2022-08-03.

PlanValue 2.8Aug 3, 2022First SLS launch remains on schedule for late August

NASA will announce a firmer launch commitment about one week before Artemis 1 when it completes its standard flight readiness review of the Artemis 1 stack.

PlanGeneralValue 3.5Aug 2, 2022NASA’s Artemis 1 moon rocket gets Aug. 29 launch date
Page9of14