Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis I Mission

completedLaunch 2022-156
Launched 11/16/2022HEOService GSat DSO E
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
11 payloads
ArgoMoon
retired
Science Exploration
cislunar
Artemis I
retired
Human Spaceflightcislunar
BioSentinel 1
active
Science Explorationcislunar
CuSP
retired
Science Explorationcislunar
EQUULEUS
retired
Science Explorationcislunar
LunaHMap
retired
Science Explorationcislunar
Lunar IceCube
retired
Science Explorationcislunar
LunIR
retired
Science Explorationcislunar
Miles
retired
Science Explorationcislunar
NEA Scout
retired
Science Explorationcislunar
OMOTENASHI
retired
Science Explorationcislunar
Launch Details
Launch Date
11/16/2022
Launch ID
2022-156
Launch Profile
Sat DSO E
Service Type
G
Orbit
HEO
Launch Stack
Operator
NASA Marshall Space Flight Center
Launch Vehicle
SLS Block 1
Launch Site
Launch Complex 39B, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)US
Payload Summary
Payload Count
11
Payload Status
retired 10 / active 1
Payload Mission Types
Science Exploration 10 / Human Spaceflight 1
Track
Mentions
267
All verified mentions of this mission in source documents.

The 2022-09-27, Artemis 1 launch window opens at 11:37 a.m. Eastern, runs for 70 minutes, and would allow a long‑class mission ending 2022-11-05.

PlanGeneralValue 4.0Sep 8, 2022NASA preparing for late September Artemis 1 launch attempt

A leak in the quick disconnect liquid hydrogen seal caused a large leak during fueling of the SLS core stage and led to the 2022-09-03 Artemis 1 launch scrub.

CapabilityPlanValue 4.0Sep 6, 2022NASA to repair SLS liquid hydrogen leak on the pad

NASA called off the Artemis 1 launch attempt three hours before the two-hour launch window opened on 2022-09-03.

PlanGeneralValue 4.0Sep 6, 2022NASA to repair SLS liquid hydrogen leak on the pad

If the Artemis I mission does not launch by the Tuesday after the scrubbed attempt, the next available launch window would be between 2022-09-19 and 2022-10-04.

PlanValue 3.0Sep 3, 2022UPDATE 4: Another delay for Artemis due to fuel leakage

Bill Nelson is the NASA Administrator and will not attempt to launch Artemis 1 until the agency feels ready.

GovernancePlanValue 3.2Sep 3, 2022Second Artemis 1 launch attempt scrubbed

NASA is preparing to launch Artemis 1 while China is pursuing plans for an International Lunar Research Station.

PlanValue 3.2Aug 31, 2022NASA and China are eyeing the same landing sites near the lunar south pole

The second launch attempt for Artemis 1 will occur during a two-hour window that opens at 2:17 p.m. Eastern on 2022-09-03.

PlanValue 4.0Aug 30, 2022Next Artemis 1 launch attempt set for Sept. 3

NASA rescheduled the next attempt to launch the Artemis 1 mission for 2022-09-03.

PlanValue 4.0Aug 30, 2022Next Artemis 1 launch attempt set for Sept. 3

Space Launch Delta 45 forecast a 40% chance of acceptable weather for a two-hour Artemis 1 launch window opening at 12:48 p.m. Eastern on 2022-09-02 because of potential storms.

PlanGeneralValue 3.0Aug 29, 2022NASA continues to study issues that caused Artemis 1 launch scrub

NASA scheduled a mission management meeting for the afternoon of 2022-08-30 to review data and provide more details on the prospects for an Artemis 1 launch on 2022-09-02 or later.

PlanGeneralValue 3.5Aug 29, 2022NASA continues to study issues that caused Artemis 1 launch scrub

Mike Sarafin is the Artemis 1 mission manager and identified 2022-09-02 as the next possible launch date because of Orion trajectory constraints to avoid extended eclipses that would deprive the spacecraft of power.

PlanGovernanceCapabilityValue 4.2Aug 29, 2022NASA continues to study issues that caused Artemis 1 launch scrub

Melody Lovin is the weather officer at the Space Force’s Space Launch Delta 45 and assessed that it was too early to forecast weather for the 2022-09-02 Artemis 1 backup opportunity.

GovernancePlanValue 2.9Aug 27, 2022Countdown for first Artemis 1 launch attempt begins

NASA reported a 70% chance of acceptable weather for the 2022-08-29 Artemis 1 launch attempt.

PlanGeneralValue 3.0Aug 27, 2022Countdown for first Artemis 1 launch attempt begins

NASA started the countdown on 2022-08-27 for the first attempt to launch its Space Launch System rocket and Orion spacecraft for an uncrewed Artemis 1 flight around the moon.

PlanGeneralValue 4.0Aug 27, 2022Countdown for first Artemis 1 launch attempt begins

NASA originally planned to fly 13 cubesats on Artemis 1, but three—Cislunar Explorers, CU-3E, and Lunar Flashlight—were not ready before the integration deadline last fall.

PlanGeneralValue 4.0Aug 26, 2022Cubesats to hitch rides on Artemis 1

NASA required the Artemis 1 cubesats to be delivered a year before launch so they could be installed on the payload adapter prior to Orion integration.

PlanRelationshipsValue 3.5Aug 26, 2022Cubesats to hitch rides on Artemis 1

Space Launch Delta 45 projected a 70% chance of acceptable weather for the Artemis 1 launch during a two-hour window that opens at 8:33 a.m. Eastern on 2022-08-29.

PlanGeneralValue 3.8Aug 26, 2022Cubesats to hitch rides on Artemis 1

Artemis 1 is scheduled to launch as soon as 2022-08-29.

PlanValue 4.0Aug 25, 2022ESA ready for “historic” Artemis 1 mission

The Orion spacecraft will launch from Launch Complex 39B at the Kennedy Space Center for Artemis 1.

PlanValue 4.0Aug 25, 2022Terran Orbital’s LunIR integrates into NASA’s Space Launch System

The Orion spacecraft will spend between 26 and 42 days on the Artemis 1 mission.

PlanValue 4.0Aug 25, 2022Terran Orbital’s LunIR integrates into NASA’s Space Launch System
Page8of14