Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis I Mission

completedLaunch 2022-156
Launched 11/16/2022HEOService GSat DSO E
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
11 payloads
ArgoMoon
retired
Science Exploration
cislunar
Artemis I
retired
Human Spaceflightcislunar
BioSentinel 1
active
Science Explorationcislunar
CuSP
retired
Science Explorationcislunar
EQUULEUS
retired
Science Explorationcislunar
LunaHMap
retired
Science Explorationcislunar
Lunar IceCube
retired
Science Explorationcislunar
LunIR
retired
Science Explorationcislunar
Miles
retired
Science Explorationcislunar
NEA Scout
retired
Science Explorationcislunar
OMOTENASHI
retired
Science Explorationcislunar
Launch Details
Launch Date
11/16/2022
Launch ID
2022-156
Launch Profile
Sat DSO E
Service Type
G
Orbit
HEO
Launch Stack
Operator
NASA Marshall Space Flight Center
Launch Vehicle
SLS Block 1
Launch Site
Launch Complex 39B, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)US
Payload Summary
Payload Count
11
Payload Status
retired 10 / active 1
Payload Mission Types
Science Exploration 10 / Human Spaceflight 1
Track
Mentions
267
All verified mentions of this mission in source documents.

NASA is working toward three placeholder launch dates for Artemis 1: 2022-08-29, 2022-09-02, and 2022-09-05.

PlanValue 4.0Aug 2, 2022NASA’s Artemis 1 moon rocket gets Aug. 29 launch date

NASA reserved target launch dates of 2022-08-29, 2022-09-02, and 2022-09-05 for the Artemis 1 mission.

PlanValue 4.2Jul 20, 2022NASA sets late August and early September launch dates for Artemis 1

Blue Canyon Technologies is providing additional spacecraft buses and components for missions including TROPICS, Starling, Artemis-1, and CIRCE.

RelationshipsGeneralValue 4.2Jul 18, 2022Blue Canyon’s multiple spacecraft and components on Virgin Orbit launch

The SLS-powered Artemis 1 mission will carry an uncrewed Orion spacecraft that will orbit the moon and deploy 10 CubeSats as secondary missions.

PlanCapabilityValue 4.2Jun 24, 2022The Capstone Launch Will Kick Off NASA’s Artemis Moon Program

NASA has published launch windows for Artemis 1 of 2022-07-26 through 2022-08-10 excluding 2022-08-01, 2, and 6, and 2022-08-23 through 2022-09-06 excluding 2022-08-30, 31, and 2022-09-01.

PlanValue 4.0May 29, 2022Next SLS countdown rehearsal scheduled for June 19

NASA hopes to launch the Artemis 1 mission in August 2025.

PlanValue 4.0May 29, 2022Next SLS countdown rehearsal scheduled for June 19

NASA’s updated schedule sets a following Artemis 1 launch window from 2022-08-23 through 2022-09-06 with no launches possible on 2022-08-30 through 2022-09-01.

PlanValue 4.0May 21, 2022NASA plans early June rollout of SLS for next countdown test

The Artemis 1 launch would need to work around the Falcon Heavy launch of the Psyche asteroid mission, which has a short launch window that opens at the beginning of August 2024.

PlanValue 3.5May 6, 2022NASA planning next SLS countdown rehearsal in June

Artemis 1 has launch windows of 2022-06-06 to 16, 2022-06-29 to 2022-07-17, and 2022-07-26 to 2022-08-09.

PlanValue 4.0Apr 12, 2022NASA defends decision to proceed with modified SLS countdown test

The SLS wet dress rehearsal will fill the rocket with liquid hydrogen and liquid oxygen propellant and take the countdown to just under T-10 seconds to test fueling and countdown procedures ahead of the Artemis 1 launch this summer.

PlanCapabilityValue 4.0Mar 29, 2022NASA ready for high-stakes, low-profile SLS test

Terran Orbital expects to deliver the LunIR satellite for NASA in 2022 to support surface characterization, remote sensing, and site selection observations of the Moon and to launch on the Artemis I mission.

PlanCapabilityRelationshipsValue 4.0Mar 28, 2022Terran Orbital Begins Trading on the New York Stock Exchange Under Ticker Symbol “LLAP” and Announces Revenue Backlog Now Exceeds $200 million

If the Artemis 1 wet dress rehearsal occurs as planned, the earliest Ax-1 could launch is 2022-04-04 at 12:50 p.m. Eastern.

PlanValue 4.2Mar 25, 2022SLS test could delay Crew Dragon launch

NASA plans to conduct a wet dress rehearsal of the Artemis 1 Space Launch System from Launch Complex 39B on 2022-04-03.

PlanValue 4.0Mar 25, 2022SLS test could delay Crew Dragon launch

Launch teams at one point planned a two-day separation between the Artemis 1 wet dress rehearsal and the Ax-1 launch but worked to shorten that separation to one day.

PlanValue 4.0Mar 25, 2022SLS test could delay Crew Dragon launch

The first Space Launch System rocket rolled out to its launch pad at Kennedy Space Center on 2022-03-17 for a countdown dress rehearsal ahead of the uncrewed Artemis 1 mission.

PlanGeneralValue 4.0Mar 18, 2022SLS rolls out to pad for countdown test

NASA’s Orion spacecraft and Space Launch System rocket rolled out to the launchpad at Kennedy Space Center on 2022-03-17 for a countdown rehearsal ahead of the Artemis 1 uncrewed lunar flyby mission.

PlanGeneralValue 4.0Mar 18, 2022Another startup joins race to provide high-speed lunar communications

The only major non-U.S. component of the Artemis 1 vehicle is the Orion service module provided by the European Space Agency.

CapabilityRelationshipsValue 4.0Feb 25, 2022NASA to roll out SLS in mid-March for launch rehearsal

Rocket Lab planned to deliver CAPSTONE in spring and intended to race Artemis 1 to the pad this spring.

PlanGeneralValue 3.0Feb 22, 2022CAPSTONE lunar cubesat mission to launch this spring

NASA plans to complete a wet dress rehearsal on the pad before setting a launch date for Artemis 1.

PlanValue 4.0Feb 2, 2022NASA delays SLS rollout for launch rehearsal

Zohar will wear an Israeli spacesuit developed by Israeli company StemRad during the Artemis 1 flight.

CapabilityRelationshipsPlanValue 4.0Jan 27, 2022Israel becomes 15th nation to join Artemis Accords
Page10of14