Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II

retired
Human SpaceflightGEOCOSPAR 2026-069ALaunched 4/1/2026
Admin Edit
Mission & Launch
Launch Mission
Artemis II Mission
Launch Vehicle
SLS Block 1
Launch Date
4/1/2026
Last Contact
4/11/2026
Orbit & Mass
Orbit Class
GEO
Altitude
35,122.5 km
Inclination
28.35 deg
Dry Mass
9,400 kg
Total Mass
25,848 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2026-069A
Track
Mentions
1095
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Artemis II astronauts remain in quarantine before launch to reduce exposure to pathogens.

GeneralValue 2.0Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

Some biomedical experiment packages on Artemis II will report metrics in real time while others will be analyzed post-flight.

Capability
Page42of55
Plan
Value 3.0
Feb 2, 2026
How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

The earliest possible Artemis II launch dates are February 8, February 10, and February 11, each with five-hour windows.

PlanValue 4.0Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

Many Artemis II experiment packages are miniaturized versions of instruments previously flown on the International Space Station.

CapabilityGeneralValue 2.8Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

A successful wet dress rehearsal would clear NASA to launch Artemis II to fly four astronauts around the Moon and back.

PlanValue 4.0Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

If the wet dress rehearsal identifies issues that require fixes, the next available Artemis II launch dates are in March and April.

PlanValue 3.0Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

Artemis II astronauts have been trained to stabilize the Orion capsule after splashdown, exit it, board a raft, and use the OCSS survival kit if necessary.

CapabilityGeneralValue 3.0Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

NASA changed Orion’s reentry profile for Artemis II to manage heat buildup during reentry.

PlanCapabilityValue 3.5Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

NASA is conducting a wet dress rehearsal with cryogenic propellants to verify launch procedures for Artemis II.

PlanCapabilityValue 4.0Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

Artemis II will include a wristband and multiple miniaturized experiment packages for astronauts to monitor physiological patterns.

CapabilityPlanValue 3.5Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

Orion on Artemis II will carry more radiation sensors than were carried on Artemis I.

CapabilityPlanValue 3.5Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

NASA rescheduled the wet dress rehearsal, the prelaunch test for the crewed lunar flyby mission Artemis II.

PlanGeneralValue 3.5Feb 1, 2026「アルテミス2」、打ち上げは2月8日以降に–寒波の影響でリハーサルを延期

Fueling and countdown simulations for Artemis II at Kennedy Space Center in Florida were moved from January 31 to February 2 due to an unusual cold snap at the launch site.

PlanValue 3.5Feb 1, 2026「アルテミス2」、打ち上げは2月8日以降に–寒波の影響でリハーサルを延期

The four crewmembers assigned to Artemis II entered quarantine in Houston and are undergoing health monitoring and predeparture preparations.

GeneralValue 3.0Feb 1, 2026「アルテミス2」、打ち上げは2月8日以降に–寒波の影響でリハーサルを延期

The rescheduling eliminated the February 6 and 7 launch opportunities for Artemis II and pushed the next viable launch date to February 8 or later.

PlanValue 4.0Feb 1, 2026「アルテミス2」、打ち上げは2月8日以降に–寒波の影響でリハーサルを延期

The Artemis II wet dress rehearsal will load more than approximately 2.65 million liters of liquid hydrogen and liquid oxygen into the rocket.

PlanCapabilityValue 4.4Feb 1, 2026「アルテミス2」、打ち上げは2月8日以降に–寒波の影響でリハーサルを延期

The Artemis II wet dress rehearsal will simulate the final 10-minute countdown multiple times, including planned holds and restarts, to verify rocket and ground team procedures.

PlanCapabilityValue 4.0Feb 1, 2026「アルテミス2」、打ち上げは2月8日以降に–寒波の影響でリハーサルを延期

Network planners intend for Artemis II to demonstrate interoperability between traditional radio systems and new optical links.

PlanCapabilityValue 3.5Jan 31, 2026Networks ready to keep Artemis II crew connected around the Moon

A possible sequence of major near-term lunar milestones is: 2026 crewed lunar flyby (Artemis II), 2027–2029 U.S. crewed lunar landing attempts (Artemis III), and 2030 China crewed lunar landing.

PlanValue 3.0Jan 31, 2026The Perception War: How Artemis II Could Win the Race Without Landing

The slip in Artemis II's schedule narrowed available launch opportunities in February to three days.

PlanValue 3.5Jan 31, 2026The Perception War: How Artemis II Could Win the Race Without Landing