Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II

retired
Human SpaceflightGEOCOSPAR 2026-069ALaunched 4/1/2026
Admin Edit
Mission & Launch
Launch Mission
Artemis II Mission
Launch Vehicle
SLS Block 1
Launch Date
4/1/2026
Last Contact
4/11/2026
Orbit & Mass
Orbit Class
GEO
Altitude
35,122.5 km
Inclination
28.35 deg
Dry Mass
9,400 kg
Total Mass
25,848 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2026-069A
Track
Mentions
1095
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Artemis II will not include descent engines, surface operations, or lunar surface extravehicular activity.

PlanCapabilityValue 4.0Feb 3, 2026The Perception War: How Artemis II Could Win the Race Without Landing
Page41of55

Artemis II will test deep-space life support, communications, Orion's heat shield, and crew operations in the cislunar environment.

CapabilityPlanValue 4.2Feb 3, 2026The Perception War: How Artemis II Could Win the Race Without Landing

If Artemis II succeeds in early 2026, the United States will have reestablished human lunar-class operations years before China flies its first crewed lunar mission.

PlanGeneralValue 2.6Feb 3, 2026The Perception War: How Artemis II Could Win the Race Without Landing

Astronauts Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen are waiting in quarantine in Houston for Artemis II.

PlanGeneralValue 2.0Feb 3, 2026The Perception War: How Artemis II Could Win the Race Without Landing

Teams encountered liquid hydrogen leaks and audio dropouts during the Artemis II wet dress rehearsal.

CapabilityValue 3.8Feb 3, 2026Last night, NASA completed the 1st WDR for Artemis II. Teams ran into several issues such as LH2 leaks and audio dropouts, but were able to count down to T-5:15. To allow time to investigate and complete another WDR, NASA is now targeting March (NET 7th at 01:29 UTC) for launch.

NASA decided to schedule a second full wet dress rehearsal for Artemis II to consolidate results and ensure all parameters fall within expected margins.

PlanGeneralValue 3.2Feb 3, 2026Artemis II: NASA rinvia il lancio dopo il wet dress rehearsal

The Artemis II wet dress rehearsal countdown reached T minus 5 minutes 15 seconds before halting.

PlanValue 4.0Feb 3, 2026Last night, NASA completed the 1st WDR for Artemis II. Teams ran into several issues such as LH2 leaks and audio dropouts, but were able to count down to T-5:15. To allow time to investigate and complete another WDR, NASA is now targeting March (NET 7th at 01:29 UTC) for launch.

The March 2026 launch window provides additional time to verify operational conditions before the crewed Artemis II launch.

PlanGrowthValue 3.0Feb 3, 2026Artemis II: NASA rinvia il lancio dopo il wet dress rehearsal

The Artemis II wet dress rehearsal included propellant loading and simulation of the final countdown phases without proceeding to engine ignition.

PlanValue 3.2Feb 3, 2026Artemis II: NASA rinvia il lancio dopo il wet dress rehearsal

NASA is targeting March 7, 2026 at 01:29 UTC (NET) as the earliest possible launch opportunity for Artemis II.

PlanValue 4.5Feb 3, 2026Last night, NASA completed the 1st WDR for Artemis II. Teams ran into several issues such as LH2 leaks and audio dropouts, but were able to count down to T-5:15. To allow time to investigate and complete another WDR, NASA is now targeting March (NET 7th at 01:29 UTC) for launch.

Artemis II is a 10-day free-return mission that will loop around the lunar far side and return to Earth.

PlanCapabilityValue 4.0Feb 3, 2026The Perception War: How Artemis II Could Win the Race Without Landing

April 2026 is the formal planning backstop for Artemis II if weather or technical issues push the mission later.

PlanValue 3.5Feb 3, 2026The Perception War: How Artemis II Could Win the Race Without Landing

NASA will conduct a second wet dress rehearsal for Artemis II to allow teams time to review data and investigate issues from the first rehearsal.

PlanCapabilityValue 4.0Feb 3, 2026Last night, NASA completed the 1st WDR for Artemis II. Teams ran into several issues such as LH2 leaks and audio dropouts, but were able to count down to T-5:15. To allow time to investigate and complete another WDR, NASA is now targeting March (NET 7th at 01:29 UTC) for launch.

NASA trained Artemis II astronauts to fly Orion in a realistic simulator emulator.

CapabilityValue 3.0Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

NASA’s strategy for elevated radiation events is for the Artemis II crew to increase protection by repositioning items inside Orion.

PlanCapabilityValue 3.2Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

NASA published an article on January 28, 2026 explaining that Artemis II will need to transmit crew voice, images, video, and health data reliably across distances of tens of thousands to hundreds of thousands of kilometers.

CapabilityPlanValue 3.5Feb 2, 20262/2宇宙ニュース・Helios、対話型「地理空間解析プラットフォーム」ベータ版の提供を開始 ほか3件

Radiation particles from strong solar events can reach Artemis II astronauts within hours.

CapabilityGeneralValue 2.0Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

During Artemis II, NASA plans to beam 4K HD videos and pictures via O2O to two suitably located ground stations during minimal cloud coverage.

PlanCapabilityValue 3.6Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

NASA partnered with the German Space Agency (DLR) on an upgrade to Orion’s radiation sensing capabilities for Artemis II.

RelationshipsCapabilityPlanValue 4.2Feb 2, 2026How NASA has planned to keep Artemis II astronauts safe throughout their Moon mission

SKY Perfect JSAT’s ground station in Japan is selected as a facility to receive signals from the Orion spacecraft during Artemis II.

CapabilityPlanValue 4.0Feb 2, 20262/2宇宙ニュース・Helios、対話型「地理空間解析プラットフォーム」ベータ版の提供を開始 ほか3件