NASA and DARPA partnered on the Demonstration Rocket for Agile Cislunar Operations project in early 2023.
ESA Scout missions are designed as agile, low-cost Earth observation missions that use small satellites developed in three years for no more than €30 million, later increased to €35 million.
The Canadian Space Agency is shifting toward agile procurement.
BWX Technologies was selected to supply the nuclear reactor and fuel for DARPA’s Demonstration Rocket for Agile Cislunar Operations program.
DARPA canceled the Demonstration Rocket for Agile Cislunar Operations program in 2025.
FlexSat can let a satellite capture images of a 400-kilometer-wide swath in a single pass through agile maneuvers.
SSTL’s Carbonite program demonstrated advanced space-based intelligence, surveillance, and reconnaissance capability using adapted ground-based technologies and agile spacecraft engineering.
The Luno initiative includes both Luno A and Luno B contracts and is part of NGA's effort to adopt agile acquisition strategies that leverage commercial geospatial capabilities.
Rocket Lab provides agile pre-launch integration support and precise orbital insertions that have aided BlackSky’s ability to deliver value with each launch.
The window for preferred access to Agile Space Industries is closing for primes, integrators, and constellation operators that have not yet qualified Agile as an approved vendor.
Hispasat is developing a multiorbit solution to provide reliable, agile satellite connectivity capable of adapting to operational challenges.
After the three demo tests, K2 Space will build a fully specified satellite for SES designed to be agile, manoeuvrable, and flexible.
After the three demo tests, K2 Space will build a fully specified satellite for SES that is intended to be agile, manoeuvrable, and flexible.
BlackSky moves Gen-3 units from its agile production line through a rapid deployment process to enable long-term mission capabilities in a short time.
The Canadian government has shifted toward agile procurement that favors companies able to deploy technology quickly and adapt in the field.
The Luno program, composed of Luno A and Luno B, is part of NGA’s agile acquisition strategy to unlock the capacity and innovation of the commercial geospatial industry.
The Maneuverable GEO effort aims to replace fixed geostationary satellites with small, agile commercial satellites that can drift between orbital slots to provide surge coverage or avoid debris.
BlackSky is expanding internationally in response to increased demand for agile, responsive space-based intelligence capabilities.
The NGA’s Luno program is an agile acquisition strategy designed to harness innovation from the commercial geospatial industry for national security.
The merged company aims to deliver agile and resilient systems for the U.S. Space Force, the Missile Defense Agency, and NASA.