Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

PSLV

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Indian Space Research Organization (ISRO)Active
Admin
Variants
6
Canonical variants linked to this family.
Historical missions
64
Missions in the public mission table with actual launch dates.
Peak listed capacity
3,800 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
201950
202020
202110
202230
202330
202430
202510
202618
202708
202808
202908
203008
203108
203208
203308
203408
203508

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
PSLV-XL
LEO3,800 kg200 km30 degGunter Krebs / Skyrocket PSLV-XL profile
PSLV-DL
LEO3,800 kgUnknownUnknownSpace Launch Schedule PSLV-DL vehicle page

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Launch 2026-F01
PSLV-DL
Jan 12, 2026
Launch 2025-F05
PSLV-XL
May 18, 2025
SPADEX
PSLV CA
Dec 30, 2024
PROBA-3

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
PSLV
Not stated3Retired
PSLV C
Not stated9Retired
PSLV CA
Not stated18Active
PSLV-DL
Not stated5Active
203608
203708
203808
203908
204008
204108

Forecast Location Split

1 launch location represented.

YearLocationLaunchesConfidenceBasis
2026Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2027Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2028Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2029Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2030Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2031Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2032Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2033Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2034Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2035Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2036Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2037Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2038Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2039Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2040Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed.
2041Satish Dhawan Space Centre | PSLV launch pads825%Editable low-confidence annual throughput seed. Site-year coverage backfill copied nearest prior site-rate row.
Satish Dhawan Space Centre | PSLV launch pads
2026 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2027 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2028 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2029 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2030 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2031 · 25% confidence
8

Editable low-confidence annual throughput seed.

PSLV CA
LEO3,800 kgUnknownUnknownSpace Launch Now PSLV-CA vehicle page
PSLV-DL
SSO1,750 kg600 kmUnknownISRO PSLV page and Space Launch Schedule PSLV-DL vehicle page
PSLV
SSO1,750 kg600 kmUnknownISRO PSLV page
PSLV-XL
SSO1,750 kg600 kmUnknownISRO PSLV page
PSLV-XL
GTO1,425 kgUnknownUnknownISRO PSLV page
PSLV
GTO1,425 kgUnknownUnknownISRO PSLV page
PSLV-XL
GTO1,300 kgUnknownUnknownGunter Krebs / Skyrocket PSLV-XL profile
PSLV-DL
GTO1,200 kgUnknownUnknownSpace Launch Schedule PSLV-DL vehicle page
PSLV CA
GTO1,200 kgUnknownUnknownSpace Launch Now PSLV-CA vehicle page
PSLV CA
SSO1,092 kg622 kmUnknownSpace Launch Now PSLV-CA vehicle page
PSLV-XL
Dec 5, 2024
XPoSAT Mission
PSLV-DL
Jan 1, 2024
Aditya-L1 Mission
PSLV-XL
Sep 2, 2023
DS-SAR Mission
PSLV CA
Jul 30, 2023
TeLEOS-2
PSLV CA
Apr 22, 2023

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

PSLV-QL
Not stated2Retired
PSLV-XL
Not stated27Active
Track
Satish Dhawan Space Centre | PSLV launch pads
2032 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2033 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2034 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2035 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2036 · 25% confidence
8

Editable low-confidence annual throughput seed.

Satish Dhawan Space Centre | PSLV launch pads
2037 · 25% confidence
8

Editable low-confidence annual throughput seed.

Mentions
378
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

A January launch failure grounded India’s PSLV rocket and destroyed 16 unrelated spacecraft.

GeneralValue 4.0Jun 15, 2026Open Cosmos solicita una prórroga a la UIT para su constelación de banda ancha tras problemas con un lanzador

Open Cosmos attributes the request for more time to force majeure caused by the withdrawal of the PSLV launcher from service.

Legal
Page1of19
Plan
Value 3.5
Jun 15, 2026
Open Cosmos solicita una prórroga a la UIT para su constelación de banda ancha tras problemas con un lanzador

ISRO's PSLV remained grounded after two successive failures.

PlanValue 2.0Jun 11, 2026After launching 2 prototypes aboard Electron earlier this year, Open Cosmos is preparing to launch operational satellites for their ConnectedCosmos constellation. They've contracted ISRO's PSLV rocket for launch, however PSLV remains grounded after 2 successive failures.

Open Cosmos has contracted ISRO's PSLV rocket for ConnectedCosmos launches.

RelationshipsValue 4.0Jun 11, 2026After launching 2 prototypes aboard Electron earlier this year, Open Cosmos is preparing to launch operational satellites for their ConnectedCosmos constellation. They've contracted ISRO's PSLV rocket for launch, however PSLV remains grounded after 2 successive failures.

In 2018, the Indian government agreed to fund 30 PSLV launches for Rs 6,131 crore, or around €18.6 million per flight.

FinancialPlanLegalValue 4.4Apr 27, 2026ESA Paid €51.65 Million to Launch Sentinel-1C on Vega-C Return to Flight

A senior official at the Vikram Sarabhai Space Centre said in 2019 that a fully integrated PSLV launch vehicle costs around Rs 200 crore, or approximately €18.1 million.

FinancialGeneralValue 4.0Apr 27, 2026ESA Paid €51.65 Million to Launch Sentinel-1C on Vega-C Return to Flight

India’s PSLV rocket is 10 metres taller than Vega C.

CapabilityGeneralValue 4.0Apr 27, 2026ESA Paid €51.65 Million to Launch Sentinel-1C on Vega-C Return to Flight

India’s PSLV rocket has a payload capacity to low Earth orbit comparable to Vega C.

CapabilityGeneralValue 3.5Apr 27, 2026ESA Paid €51.65 Million to Launch Sentinel-1C on Vega-C Return to Flight

The 2018 Indian PSLV launch funding included Programme Management and Launch Campaign costs.

FinancialGeneralValue 2.3Apr 27, 2026ESA Paid €51.65 Million to Launch Sentinel-1C on Vega-C Return to Flight

The Proba-3 mission’s Coronagraph and Occulter spacecraft were launched aboard an ISRO PSLV-XL rocket in December 2024.

PlanGeneralValue 4.5Mar 22, 2026ESA Regains Contact With Lost Proba-3 Spacecraft

Both PROBA-3 spacecraft were launched aboard an ISRO PSLV-XL rocket in December 2024.

GeneralPlanValue 4.0Mar 6, 2026ESA Has Lost Contact With One of Its PROBA-3 Spacecraft

Orbital Paradigm’s KID reentry vehicle survived long enough to transmit valuable data despite ISRO’s PSLV failing during launch.

CapabilityLegalValue 4.0Feb 12, 2026Vulcan, Ariane 64 Blast Off

The PSLV can lift about three times more mass to space at once than Skyroot’s planned Vikram-II upgrade.

CapabilityPlanValue 3.5Feb 11, 2026When ISRO loses a PSLV rocket, India loses a launchpad in the present and the future

The payloads lost in the January 12 PSLV failure included a national hyperspectral satellite, seven private Indian satellites, five Brazilian satellites, one UK satellite, one Nepalese satellite, and one European satellite named KID.

GeneralCapabilityValue 4.0Feb 11, 2026When ISRO loses a PSLV rocket, India loses a launchpad in the present and the future

The First Launch Pad was built in the early 1990s for ISRO to launch the PSLV and also supports launches of the smaller SSLV rocket.

CapabilityPlanValue 3.5Feb 11, 2026When ISRO loses a PSLV rocket, India loses a launchpad in the present and the future

The European satellite KID briefly survived the PSLV failure and transmitted some information after experiencing loads up to 30 g.

CapabilityGeneralValue 4.0Feb 11, 2026When ISRO loses a PSLV rocket, India loses a launchpad in the present and the future

The January 12 failure was the PSLV’s second consecutive failure following an earlier PSLV failure in May 2025.

GeneralValue 2.0Feb 11, 2026When ISRO loses a PSLV rocket, India loses a launchpad in the present and the future

The PSLV and LVM3 both use the liquid Vikas engine, creating a technological link in propulsion between the two vehicles.

CapabilityRelationshipsValue 3.5Feb 11, 2026When ISRO loses a PSLV rocket, India loses a launchpad in the present and the future

The Second Launch Pad was built in 2005 primarily to launch the heavier GSLV Mk II and LVM3 rockets and can host PSLV launches less frequently.

CapabilityPlanValue 4.0Feb 11, 2026When ISRO loses a PSLV rocket, India loses a launchpad in the present and the future

Skyroot’s Vikram-I rocket has a lift capacity roughly six to seven times lower than the PSLV for equivalent orbits.

CapabilityGeneralValue 3.8Feb 11, 2026When ISRO loses a PSLV rocket, India loses a launchpad in the present and the future