Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2019 | 5 | 0 |
| 2020 | 2 | 0 |
| 2021 | 1 | 0 |
| 2022 | 3 | 0 |
| 2023 | 3 | 0 |
| 2024 | 3 | 0 |
| 2025 | 1 | 0 |
| 2026 | 1 | 8 |
| 2027 | 0 | 8 |
| 2028 | 0 | 8 |
| 2029 | 0 | 8 |
| 2030 | 0 | 8 |
| 2031 | 0 | 8 |
| 2032 | 0 | 8 |
| 2033 | 0 | 8 |
| 2034 | 0 | 8 |
| 2035 | 0 | 8 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
PSLV-XL | LEO | 3,800 kg | 200 km | 30 deg | Gunter Krebs / Skyrocket PSLV-XL profile |
PSLV-DL | LEO | 3,800 kg | Unknown | Unknown | Space Launch Schedule PSLV-DL vehicle page |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Launch 2026-F01 | PSLV-DL | Jan 12, 2026 |
| Launch 2025-F05 | PSLV-XL | May 18, 2025 |
| SPADEX | PSLV CA | Dec 30, 2024 |
| PROBA-3 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
PSLV | Not stated | 3 | Retired |
PSLV C | Not stated | 9 | Retired |
PSLV CA | Not stated | 18 | Active |
PSLV-DL | Not stated | 5 | Active |
| 2036 | 0 | 8 |
| 2037 | 0 | 8 |
| 2038 | 0 | 8 |
| 2039 | 0 | 8 |
| 2040 | 0 | 8 |
| 2041 | 0 | 8 |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2027 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2028 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2029 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2030 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2031 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2032 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2033 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2034 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2035 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2036 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2037 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2038 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2039 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2040 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. |
| 2041 | Satish Dhawan Space Centre | PSLV launch pads | 8 | 25% | Editable low-confidence annual throughput seed. Site-year coverage backfill copied nearest prior site-rate row. |
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
PSLV CA | LEO | 3,800 kg | Unknown | Unknown | Space Launch Now PSLV-CA vehicle page |
PSLV-DL | SSO | 1,750 kg | 600 km | Unknown | ISRO PSLV page and Space Launch Schedule PSLV-DL vehicle page |
PSLV | SSO | 1,750 kg | 600 km | Unknown | ISRO PSLV page |
PSLV-XL | SSO | 1,750 kg | 600 km | Unknown | ISRO PSLV page |
PSLV-XL | GTO | 1,425 kg | Unknown | Unknown | ISRO PSLV page |
PSLV | GTO | 1,425 kg | Unknown | Unknown | ISRO PSLV page |
PSLV-XL | GTO | 1,300 kg | Unknown | Unknown | Gunter Krebs / Skyrocket PSLV-XL profile |
PSLV-DL | GTO | 1,200 kg | Unknown | Unknown | Space Launch Schedule PSLV-DL vehicle page |
PSLV CA | GTO | 1,200 kg | Unknown | Unknown | Space Launch Now PSLV-CA vehicle page |
PSLV CA | SSO | 1,092 kg | 622 km | Unknown | Space Launch Now PSLV-CA vehicle page |
PSLV-XL |
| Dec 5, 2024 |
| XPoSAT Mission | PSLV-DL | Jan 1, 2024 |
| Aditya-L1 Mission | PSLV-XL | Sep 2, 2023 |
| DS-SAR Mission | PSLV CA | Jul 30, 2023 |
| TeLEOS-2 | PSLV CA | Apr 22, 2023 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
PSLV-QL | Not stated | 2 | Retired |
PSLV-XL | Not stated | 27 | Active |
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
A January launch failure grounded India’s PSLV rocket and destroyed 16 unrelated spacecraft.
Open Cosmos attributes the request for more time to force majeure caused by the withdrawal of the PSLV launcher from service.
ISRO's PSLV remained grounded after two successive failures.
Open Cosmos has contracted ISRO's PSLV rocket for ConnectedCosmos launches.
In 2018, the Indian government agreed to fund 30 PSLV launches for Rs 6,131 crore, or around €18.6 million per flight.
A senior official at the Vikram Sarabhai Space Centre said in 2019 that a fully integrated PSLV launch vehicle costs around Rs 200 crore, or approximately €18.1 million.
India’s PSLV rocket is 10 metres taller than Vega C.
India’s PSLV rocket has a payload capacity to low Earth orbit comparable to Vega C.
The 2018 Indian PSLV launch funding included Programme Management and Launch Campaign costs.
The Proba-3 mission’s Coronagraph and Occulter spacecraft were launched aboard an ISRO PSLV-XL rocket in December 2024.
Both PROBA-3 spacecraft were launched aboard an ISRO PSLV-XL rocket in December 2024.
Orbital Paradigm’s KID reentry vehicle survived long enough to transmit valuable data despite ISRO’s PSLV failing during launch.
The PSLV can lift about three times more mass to space at once than Skyroot’s planned Vikram-II upgrade.
The payloads lost in the January 12 PSLV failure included a national hyperspectral satellite, seven private Indian satellites, five Brazilian satellites, one UK satellite, one Nepalese satellite, and one European satellite named KID.
The First Launch Pad was built in the early 1990s for ISRO to launch the PSLV and also supports launches of the smaller SSLV rocket.
The European satellite KID briefly survived the PSLV failure and transmitted some information after experiencing loads up to 30 g.
The January 12 failure was the PSLV’s second consecutive failure following an earlier PSLV failure in May 2025.
The PSLV and LVM3 both use the liquid Vikas engine, creating a technological link in propulsion between the two vehicles.
The Second Launch Pad was built in 2005 primarily to launch the heavier GSLV Mk II and LVM3 rockets and can host PSLV launches less frequently.
Skyroot’s Vikram-I rocket has a lift capacity roughly six to seven times lower than the PSLV for equivalent orbits.