GOES 17

active
Earth ObservationGEOCOSPAR 2018-022ALaunched 3/1/2018
Admin Edit
Mission & Launch
Launch Mission
GOES S
Launch Vehicle
Atlas V 541 C
Launch Date
3/1/2018
Orbit & Mass
Orbit Class
GEO
Altitude
35,786.5 km
Inclination
0.05 deg
Dry Mass
2,857 kg
Total Mass
5,192 kg
Payload Classification
Mission Type
Earth Observation
Payload Category
MET
Payload Class
C
Organizations
Operator
National Oceanic and Atmospheric Administration (NOAA)
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2018-022A
UN Registration
ST/SG/SER.E/877
Track
Mentions
45
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Engineers developed workarounds that allow GOES-17’s Advanced Baseline Imager to provide more than 97% of its expected data.

CapabilityGeneralValue 4.0Dec 19, 2019NOAA to complete transition to next-generation GOES weather satellites
Page2of3

A report released 2019-08-01 concluded that a problem with an instrument on the GOES-17 weather satellite is likely caused by some kind of blockage in a system used to cool the instrument.

CapabilityValue 3.8Aug 2, 2019GOES-17 instrument problem blamed on blocked heat pipe

NOAA considers GOES-17 to provide faster, more accurate, and more detailed observations than previous generations of geostationary orbit weather satellites.

CapabilityValue 3.0Aug 2, 2019GOES-17 instrument problem blamed on blocked heat pipe

GOES-17 was launched in March 2018 as GOES-S.

PlanValue 2.8Aug 2, 2019GOES-17 instrument problem blamed on blocked heat pipe

NOAA operated the GOES-17 ABI at 60 kelvin and adjusted detector channels to operate as high as the low 80s kelvin to lower cooling requirements.

CapabilityValue 4.2Apr 18, 2019A clearer outlook for NOAA weather satellite programs

GOES-16 and GOES-17 provide two next-generation geostationary satellites with comparable performance for NOAA.

GeneralCapabilityRelationshipsValue 3.2Apr 18, 2019A clearer outlook for NOAA weather satellite programs

NOAA, working with industry and international partners, mitigated problems with GOES-17’s Advanced Baseline Imager and obtained 97 percent of the data originally sought.

CapabilityValue 4.0Apr 18, 2019A clearer outlook for NOAA weather satellite programs

NOAA launched GOES-17 in 2018.

PlanGeneralValue 2.0Apr 18, 2019A clearer outlook for NOAA weather satellite programs

NOAA launched Geostationary Operational Environmental Satellite-17 (GOES-17) in 2018 with four space weather instruments.

CapabilityPlanValue 4.6Mar 6, 2019Are small satellites the solution for space weather monitoring?

GOES-T was slated to launch in 2020 with the same sensors as GOES-16 and GOES-17 before NASA discovered problems with the Advanced Baseline Imager’s cooling system.

PlanCapabilityValue 4.0Mar 6, 2019Are small satellites the solution for space weather monitoring?

Lockheed Martin finished assembling the GOES-T spacecraft in 2019 and was preparing it for environmental testing when NOAA directed the company to halt work due to ABI problems on GOES-17.

PlanCapabilityLegalRelationshipsValue 3.9Jan 9, 2019Lockheed Martin halts work on GOES-T to wait for instrument fix

During on-orbit checkout of GOES-17, NOAA discovered that ABI’s infrared channels were not working as designed because of cooling problems.

CapabilityGeneralValue 4.3Jan 9, 2019Lockheed Martin halts work on GOES-T to wait for instrument fix

The loop heat pipes for GOES-17’s ABI were built by ATK for Exelis, and those loop heat pipes were unable to adequately cool the imager’s infrared and near-infrared channels for approximately 12 hours per day.

CapabilityRelationshipsValue 4.0Jan 9, 2019Lockheed Martin halts work on GOES-T to wait for instrument fix

GOES-17 launched in March 2018.

PlanValue 3.5Jan 9, 2019Lockheed Martin halts work on GOES-T to wait for instrument fix

GOES-17’s ABI is expected to deliver about 97 percent of the data it was built to collect.

CapabilityPlanValue 3.5Jan 9, 2019Lockheed Martin halts work on GOES-T to wait for instrument fix

The modified ABI loop heat pipe design uses ammonia as the coolant rather than the propylene coolant used on GOES-17’s ABI.

CapabilityValue 4.0Jan 9, 2019Lockheed Martin halts work on GOES-T to wait for instrument fix

A cooling problem degraded the performance of GOES-17’s ABI infrared channels, preventing them from operating during parts of each orbit.

CapabilityGeneralValue 4.0Oct 3, 2018NOAA and NASA establish board to investigate GOES-17 instrument problem

NOAA plans to put GOES-17 into operational service late in 2018 at the GOES-West orbital slot at 135 degrees west.

PlanValue 4.0Oct 3, 2018NOAA and NASA establish board to investigate GOES-17 instrument problem

NASA and NOAA established a mishap investigation board to probe an anomaly with the Advanced Baseline Imager instrument on the GOES-17 weather satellite launched in March 2018.

LegalCapabilityValue 3.6Oct 3, 2018NOAA and NASA establish board to investigate GOES-17 instrument problem

NOAA first identified a problem with the Advanced Baseline Imager on GOES-17 on 2018-05-23.

CapabilityValue 3.6Oct 3, 2018NOAA and NASA establish board to investigate GOES-17 instrument problem