AEHF 6

completedLaunch 2020-022
Launched 3/26/2020HEOService CGSat GTO O
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
2 payloads
AEHF SV-6
active
Communications
MEO
AEHF
OrCa
retired
Technology DemonstrationHEO
Launch Details
Launch Date
3/26/2020
Launch ID
2020-022
Launch Profile
Sat GTO O
Service Type
CG
Customer Type
G
Orbit
HEO
Launch Stack
Operator
United Launch Alliance (ULA)
Launch Vehicle
Atlas V 551 C
Launch Site
Space Launch Complex 41, Cape Canaveral (Cape Canaveral Air Station, Florida)US
Payload Summary
Payload Count
2
Constellations
1
Payload Status
active 1 / retired 1
Payload Mission Types
Communications 1 / Technology Demonstration 1
Track
Mentions
25
All verified mentions of this mission in source documents.

Testing for AEHF-6 was conducted from seven locations across the United States and involved nine organizations and more than 100 space professionals.

PlanGeneralValue 3.0Dec 5, 2020Satellite Control Authority Of the AEHF-6 Transferred To USSF’s Space Operations Command

Orbit raising to geosynchronous Earth orbit and performance testing for AEHF-6 were completed in August.

PlanCapabilityGeneralValue 3.5Dec 5, 2020Satellite Control Authority Of the AEHF-6 Transferred To USSF’s Space Operations Command

AEHF-6 military communications satellite launched 2020-03-26.

PlanCapabilityValue 3.5Sep 16, 2020U.S. Space Command to begin testing the last satellite of the AEHF-MILSTAR constellation

AEHF-6 successfully completed on-orbit testing on 2020-08-27.

PlanCapabilityValue 4.0Sep 16, 2020U.S. Space Command to begin testing the last satellite of the AEHF-MILSTAR constellation

The 2020-03-26 national security launch of the AEHF-6 satellite required about 300 government personnel on base.

GeneralValue 3.4Apr 9, 2020Starlink mission scheduled for next week at Kennedy Space Center

The Atlas 5 launched AEHF-6 in the 551 configuration with five side-mounted solid rocket boosters.

PlanCapabilityValue 4.0Mar 26, 2020ULA’s Atlas 5 launches AEHF-6 communications satellite in its first mission for U.S. Space Force

AEHF-6 is a $1,400,000,000 Advanced Extremely High Frequency communications satellite for the U.S. Space Force.

CapabilityFinancialValue 4.0Mar 26, 2020ULA’s Atlas 5 launches AEHF-6 communications satellite in its first mission for U.S. Space Force

AEHF-6 was the 83rd Atlas 5 launch since 2002 and the 11th Atlas 5 mission in the 551 configuration.

PlanGeneralValue 3.0Mar 26, 2020ULA’s Atlas 5 launches AEHF-6 communications satellite in its first mission for U.S. Space Force

A United Launch Alliance Atlas 5 rocket lifted off on 2020-03-26 at 4:18 PM EST from Space Launch Complex-41 at Cape Canaveral Air Force Station carrying the AEHF-6 communications satellite.

PlanGeneralValue 4.5Mar 26, 2020ULA’s Atlas 5 launches AEHF-6 communications satellite in its first mission for U.S. Space Force

The U.S. Space Force classed the AEHF-6 satellite mission as essential because it provides highly secure, nuclear-hardened communications to military forces.

CapabilityGeneralValue 4.0Mar 19, 2020Space should fare better against coronavirus than other industries, report says

A United Launch Alliance Atlas V mission carrying the Advanced Extremely High Frequency AEHF-6 satellite remained scheduled for 2020-03-26 from Cape Canaveral Air Force Station, Florida.

PlanGeneralValue 4.0Mar 19, 2020Space should fare better against coronavirus than other industries, report says

The Advanced Extremely High Frequency AEHF-6 military communications satellite was scheduled to launch on 2020-03-26, from Cape Canaveral, Florida aboard a United Launch Alliance Atlas V rocket.

PlanCapabilityGeneralValue 4.0Mar 18, 2020Space Force, Air Force key tasks not being derailed by coronavirus

After AEHF-6, Parsons’ next launch manifest integration job will be a secondary payload that will ride with Landsat-9, an Earth observation satellite that NASA plans to launch in 2021.

PlanValue 4.0Feb 24, 2020Parsons assembling small satellite to fly on Atlas 5 in upcoming AEHF-6 mission

AEHF-6 is the sixth and final satellite of the Advanced Extremely High Frequency constellation and is scheduled to lift off 2020-03-19 from Cape Canaveral Air Force Station, Florida.

PlanGeneralValue 4.5Feb 24, 2020Parsons assembling small satellite to fly on Atlas 5 in upcoming AEHF-6 mission

AEHF-6 is scheduled to launch in 2020.

PlanValue 3.5Feb 10, 2020Trump seeks $15.4 billion for U.S. Space Force in 2021 budget

The final AEHF satellite, AEHF-6, is in full production and was expected to launch in 2020.

PlanCapabilityValue 3.5Nov 15, 2019Lockheed Martin receives $3.3B contract for work on Air Force classified communications satellites

The 2019-10-01 contract allows the Air Force to launch the AEHF-6, AFSPC-7, and NROL-101 missions on previously ordered Atlas 5 rockets.

RelationshipsPlanValue 4.6Oct 1, 2019Air Force awards $98.5 million ‘completion contract’ to ULA for launch services for three Atlas 5 missions

The AEHF-6 and NROL-101 missions will use the Atlas 5551 configuration with five side-mounted solid rocket boosters.

CapabilityPlanValue 4.0Oct 1, 2019Air Force awards $98.5 million ‘completion contract’ to ULA for launch services for three Atlas 5 missions

The AEHF-6 and NROL-101 missions were awarded to ULA in 2017.

RelationshipsValue 4.0Oct 1, 2019Air Force awards $98.5 million ‘completion contract’ to ULA for launch services for three Atlas 5 missions

The $98,500,000 Atlas 5 completion contract runs through December 2020 and covers infrastructure and support for the AEHF-6, AFSPC-7, and NROL-101 missions.

RelationshipsFinancialPlanValue 4.6Oct 1, 2019Air Force awards $98.5 million ‘completion contract’ to ULA for launch services for three Atlas 5 missions