Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Peregrine

completedLaunch 2024-006
Launched 1/8/2024HEOService CSat EEO O
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
7 payloads
Colmena 1
retired
Science Exploration
HEO
Colmena 2
retired
Science ExplorationHEO
Colmena 3
retired
Science ExplorationHEO
Colmena 4
retired
Science ExplorationHEO
Colmena 5
retired
Science ExplorationHEO
Iris (2024-006)
retired
Science ExplorationHEO
Peregrine Mission One
active
Science Explorationcislunar
Launch Details
Launch Date
1/8/2024
Launch ID
2024-006
Launch Profile
Sat EEO O
Service Type
C
Orbit
HEO
Launch Stack
Operator
United Launch Alliance (ULA)
Launch Vehicle
Vulcan Centaur VC2S
Launch Site
Space Launch Complex 41, Cape Canaveral (Cape Canaveral Air Station, Florida)US
Payload Summary
Payload Count
7
Payload Status
retired 6 / active 1
Payload Mission Types
Science Exploration 7
Track
Mentions
336
All verified mentions of this mission in source documents.

Astrobotic’s Peregrine lander is slated to launch on the inaugural Vulcan Centaur on 2023-12-24.

PlanValue 4.0Nov 14, 2023Intuitive Machines planning up to three lunar lander missions in 2024

The Cert-1 mission includes Peregrine Mission One (PM1), the first Peregrine lunar lander for Astrobotic as part of NASA’s Commercial Lunar Payload Services (CLPS) initiative to deliver science and technology to the lunar service.

PlanGeneralValue 4.2Nov 7, 2023United Launch Alliance’s New Vulcan Rocket Set for Debut Launch

The Peregrine lunar lander will attempt a soft landing at the Gruithuisen Domes.

PlanValue 3.5Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

Astrobotic's Mission Control Center (AMCC) will take control of the Peregrine lunar lander after it separates from the ULA rocket.

PlanValue 4.0Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

The Peregrine lunar lander is scheduled for launch on December 24, 2023.

PlanValue 4.0Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

Astrobotic's Peregrine lunar lander arrived safely in Cape Canaveral, Florida.

PlanGeneralValue 4.0Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

Astrobotic's Peregrine lunar lander will separate from the Vulcan Centaur after launch.

PlanValue 3.0Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

The Peregrine lunar lander will support lunar surface payload operations for approximately 10 days.

CapabilityPlanValue 3.5Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

Astrobotic's Peregrine lunar lander will attempt one of the first successful landings of an American spacecraft on the Moon since Apollo.

PlanValue 3.0Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

Peregrine is carrying 21 payloads from governments, companies, universities, and NASA’s Commercial Lunar Payload Services program.

GeneralRelationshipsValue 3.5Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

The Peregrine lunar lander was unloaded at Astrotech facilities for integration with United Launch Alliance's (ULA) Vulcan.

RelationshipsPlanValue 4.2Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

Astrobotic completed a battery of industry-standard acceptance testing for the Peregrine lunar lander.

CapabilityValue 3.6Nov 1, 2023Astrobotic's Peregrine Lunar Lander Arrives in Florida for Launch Preparations

Astrobotic's Peregrine lunar lander has arrived safely in Cape Canaveral, Florida.

GeneralValue 4.0Oct 31, 2023Astrobotic’s Peregrine lunar lander arrives in Florida for launch prep

After launch, Peregrine will establish power and communications with the spacecraft to guide it to the Moon.

PlanCapabilityValue 3.6Oct 31, 2023Astrobotic’s Peregrine lunar lander arrives in Florida for launch prep

Peregrine is carrying 21 payloads from governments, companies, universities, and NASA’s Commercial Lunar Payload Services program.

GeneralValue 3.5Oct 31, 2023Peregrine Arrives in Florida for Launch Preparations

Astrobotic's Mission Control Center will take control of Peregrine once it separates from the ULA rocket.

PlanValue 3.5Oct 31, 2023Astrobotic’s Peregrine lunar lander arrives in Florida for launch prep

Peregrine will attempt one of the first successful landings of an American spacecraft on the Moon since Apollo.

PlanValue 3.0Oct 31, 2023Peregrine Arrives in Florida for Launch Preparations

Peregrine was unloaded at Astrotech facilities where it will be integrated with United Launch Alliance's Vulcan for launch on December 24, 2023.

PlanGeneralCapabilityValue 4.0Oct 31, 2023Astrobotic’s Peregrine lunar lander arrives in Florida for launch prep

Astrobotic’s Peregrine lander arrived at a payload processing facility at Cape Canaveral operated by Astrotech on 2023-10-31.

RelationshipsPlanValue 4.0Oct 31, 2023Astrobotic lander arrives at launch site

Astrobotic's Mission Control Center will take control of Peregrine after its separation from the ULA rocket.

PlanValue 4.0Oct 31, 2023Peregrine Arrives in Florida for Launch Preparations
Page9of17