Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Peregrine

completedLaunch 2024-006
Launched 1/8/2024HEOService CSat EEO O
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
7 payloads
Colmena 1
retired
Science Exploration
HEO
Colmena 2
retired
Science ExplorationHEO
Colmena 3
retired
Science ExplorationHEO
Colmena 4
retired
Science ExplorationHEO
Colmena 5
retired
Science ExplorationHEO
Iris (2024-006)
retired
Science ExplorationHEO
Peregrine Mission One
active
Science Explorationcislunar
Launch Details
Launch Date
1/8/2024
Launch ID
2024-006
Launch Profile
Sat EEO O
Service Type
C
Orbit
HEO
Launch Stack
Operator
United Launch Alliance (ULA)
Launch Vehicle
Vulcan Centaur VC2S
Launch Site
Space Launch Complex 41, Cape Canaveral (Cape Canaveral Air Station, Florida)US
Payload Summary
Payload Count
7
Payload Status
retired 6 / active 1
Payload Mission Types
Science Exploration 7
Track
Mentions
336
All verified mentions of this mission in source documents.

ULA planned to launch Peregrine on Christmas Eve in 2023 but postponed it due to problems with ground systems during a fueling test.

PlanCapabilityGeneralValue 4.0Jan 2, 2024The year new launch vehicles finally lift off

United Launch Alliance's Vulcan Centaur rocket is scheduled to launch Astrobotic's Peregrine lunar lander from Cape Canaveral on January 8, 2024.

PlanGeneralValue 4.5Jan 2, 2024The year new launch vehicles finally lift off

Cert-1 will deliver the Astrobotic Peregrine commercial lunar lander into a highly elliptical orbit more than 220,0 m (360,0 m) above Earth to intercept the Moon.

PlanCapabilityValue 4.0Jan 1, 2024UPDATE 3: T-minus one week until ULA’s launch of Vulcan rocket

Peregrine carries a shoebox-sized, 2 kg (4.4-pound) rover called Iris that was built by Carnegie Mellon students to take geological images.

CapabilityValue 4.0Jan 1, 2024UPDATE 3: T-minus one week until ULA’s launch of Vulcan rocket

Cert-1 will deliver the Astrobotic Peregrine commercial lunar lander into a highly elliptical orbit more than 220,0 m (360,0 m) above Earth to intercept the Moon.

PlanCapabilityValue 4.6Dec 20, 2023UPDATE 2 ULA’s Vulcan rocket now atop the launch vehicle

Astrobotic’s Peregrine lunar lander completed all integration milestones and was mated with United Launch Alliance’s Vulcan rocket payload adapter on 2023-11-16.

PlanValue 4.0Dec 20, 2023Astrobotic’s Peregrine Lunar Lander Mission Fueled and Ready for Launch

Astrobotic scheduled the Peregrine spacecraft to launch to the Moon on 2024-01-08.

PlanValue 4.5Dec 20, 2023Astrobotic’s Peregrine Lunar Lander Mission Fueled and Ready for Launch

The Peregrine lander carries a shoebox-sized, 2 kg (4.4-pound) rover named Iris built by Carnegie Mellon University students to take geological images.

CapabilityValue 4.5Dec 20, 2023UPDATE 2 ULA’s Vulcan rocket now atop the launch vehicle

About 40 minutes after separation from ULA’s Vulcan rocket, Peregrine’s propulsion system will activate and begin receiving commands from Astrobotic’s Mission Control Center.

PlanCapabilityValue 4.5Dec 20, 2023Astrobotic’s Peregrine Lunar Lander Mission Fueled and Ready for Launch

Peregrine is slated to be the first private American spacecraft launched under NASA’s Commercial Lunar Payload Services (CLPS) initiative to deliver experiments to the lunar surface.

PlanGeneralValue 3.8Dec 20, 2023UPDATE 2 ULA’s Vulcan rocket now atop the launch vehicle

About 40 minutes after separation from ULA’s Vulcan rocket, Peregrine’s propulsion system will activate and begin receiving commands from Astrobotic’s Mission Control Center.

PlanCapabilityValue 4.0Dec 19, 2023Astrobotic Peregrine Fueled & Ready for Lunar Mission

Both Astrobotic’s Peregrine and Intuitive Machines’ IM-1 are carrying commercial payloads and payloads provided by NASA through the Commercial Lunar Payload Services program under awards made in 2019.

GeneralLegalPlanValue 3.0Dec 19, 2023Intuitive Machines delays first lunar lander launch to February

Peregrine is carrying 20 commercial and government payloads, including five provided by NASA as part of the Commercial Lunar Payload Services program.

CapabilityGeneralValue 4.0Dec 19, 2023Peregrine lunar lander ready for January launch

A launch in the window that opens 2023-01-08 would set up Peregrine for a landing on 2023-02-23.

PlanGeneralValue 3.0Dec 19, 2023Peregrine lunar lander ready for January launch

Astrobotic’s Peregrine lunar lander completed all its pre-launch integration activities, including fueling and mating with the payload adapter for United Launch Alliance’s Vulcan Centaur rocket, by 2023-12-19.

PlanCapabilityRelationshipsValue 4.0Dec 19, 2023Peregrine lunar lander ready for January launch

On 2023-12-14, United Launch Alliance completed the wet dress rehearsal and confirmed a 2023-01-08 launch date for Peregrine.

PlanValue 4.0Dec 19, 2023Peregrine lunar lander ready for January launch

Astrobotic’s Peregrine lunar lander completed all integration milestones and was mated with United Launch Alliance’s Vulcan rocket payload adapter on 2023-11-16.

PlanCapabilityValue 4.0Dec 19, 2023Astrobotic Peregrine Fueled & Ready for Lunar Mission

Cert-1 will deliver the Astrobotic Peregrine lander into a highly elliptical orbit more than 220,0 m (360,0 m) above Earth to intercept the Moon.

PlanCapabilityValue 4.0Dec 18, 2023UPDATE Delay for ULA’s Vulcan Centaur launch first certification mission (Cert-1)

Cert-1 will carry Astrobotic’s Peregrine lunar lander, Peregrine Mission One (PM1), as part of NASA’s Commercial Lunar Payload Services initiative to deliver science and technology to the lunar surface.

CapabilityGeneralValue 4.0Dec 18, 2023UPDATE Delay for ULA’s Vulcan Centaur launch first certification mission (Cert-1)

The primary payload for the Vulcan Centaur’s planned 2023-12-24 launch is the Peregrine lunar lander built by Astrobotic.

PlanCapabilityRelationshipsValue 4.0Dec 10, 2023First Vulcan launch likely to slip to January
Page8of17