Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Peregrine Mission One

active
Science ExplorationcislunarCOSPAR 2024-006ALaunched 1/8/2024
Admin Edit
Mission & Launch
Launch Mission
Peregrine
Launch Vehicle
Vulcan Centaur VC2S
Launch Date
1/8/2024
Orbit & Mass
Orbit Class
cislunar
Altitude
191,057.5 km
Inclination
30.11 deg
Dry Mass
833 kg
Total Mass
1,283 kg
Payload Classification
Mission Type
Science Exploration
Payload Category
PLAN
Payload Class
B
Organizations
Operator
Astrobotic
Manufacturer
Astrobotic
Registry
COSPAR ID
2024-006A
UN Registration
ST/SG/SER.E/1195
Track
Mentions
16
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Astrobotic’s Peregrine Mission One launched in January 2024 but suffered a propellant leak that prevented landing and led to reentry into Earth’s atmosphere.

GeneralValue 3.8Jun 19, 2026Cislunar Business Models 2026: Voyager, Firefly, Astrobotic Compared

Astrobotic’s Peregrine Mission One launched in January 2024 and suffered a propellant leak that prevented landing.

Plan
General
Value 3.8
Jun 19, 2026
Cislunar Business Models 2026: Voyager, Firefly, Astrobotic Compared

Astrobotic’s Peregrine Mission One operated in cislunar space for 10 days earlier in the same year.

CapabilityValue 3.5Oct 1, 2024Griffin Mission One Ground Testing with NASA’s Deep Space Network a Success

The DSN antennas in Canberra, Madrid, and Goldstone are the same suite used to communicate with Astrobotic’s Peregrine Mission One during its 10-day cislunar mission.

CapabilityPlanValue 4.3Oct 1, 2024Griffin Mission One Ground Testing with NASA’s Deep Space Network a Success

Astrobotic's Peregrine Mission One spent 10 days and 13 hours in space before making a controlled re-entry over open water in the South Pacific at approximately 4:04 p.m. EST on 2024-01-18.

GeneralValue 4.0Jan 22, 2024Astrobotic's Peregrine Mission One, Part of NASA's CLPS Concludes

The Cert-1 mission for Vulcan included Astrobotic's Peregrine Mission One lunar lander as part of NASA's Commercial Lunar Payload Services initiative to deliver science and technology to the lunar surface.

RelationshipsGeneralValue 4.0Jan 9, 2024United Launch Alliance's Next Generation Vulcan Rocket Successfully Launched

The Cert-1 mission will deliver Astrobotic’s Peregrine commercial lunar lander (Peregrine Mission One, PM1) into a highly elliptical orbit more than 220,0 m (360,0 m) above Earth to intercept the Moon.

PlanCapabilityGeneralValue 4.0Jan 7, 2024LIFTOFF as ULA’s Vulcan launches America’s new rocket

Cert-1 will carry Astrobotic’s Peregrine lunar lander, Peregrine Mission One (PM1), as part of NASA’s Commercial Lunar Payload Services initiative to deliver science and technology to the lunar surface.

CapabilityGeneralValue 4.0Dec 18, 2023UPDATE Delay for ULA’s Vulcan Centaur launch first certification mission (Cert-1)

The Cert-1 mission includes Peregrine Mission One (PM1), the first Peregrine lunar lander for Astrobotic as part of NASA’s Commercial Lunar Payload Services (CLPS) initiative to deliver science and technology to the lunar service.

PlanGeneralValue 4.2Nov 7, 2023United Launch Alliance’s New Vulcan Rocket Set for Debut Launch

Peregrine Mission One's flight acceptance campaign was completed on schedule and exceeded expectations.

PlanGeneralValue 2.0Jan 25, 2023Astrobotic completes Peregrine testing

Peregrine Mission One will be launched on ULA’s Vulcan Centaur rocket.

PlanGeneralValue 4.0Dec 8, 2022Peregrine Aces Vibration, Acoustics Testing for Upcoming Lunar Journey

The German Aerospace Center (DLR) is participating in Astrobotic’s Peregrine Mission One to land a German-built instrument on the Moon in 2021.

PlanRelationshipsValue 4.0Apr 20, 2021DLR to Land Radiation Instrument on the Moon with Astrobotic

Astrobotic’s Peregrine Mission One patch will be available to the general public through Astrobotic’s new online store anticipated to launch in early April 2021.

GeneralPlanValue 2.3Mar 10, 2021Mission Patch Revealed for Astrobotic’s Peregrine Mission One

Astrobotic’s Peregrine Mission One (PM1) is set to launch later 2021.

PlanValue 3.5Mar 10, 2021Mission Patch Revealed for Astrobotic’s Peregrine Mission One

Sarah Huth is Astrobotic’s graphic designer and designed the Peregrine Mission One patch to reference previous historic missions using Peregrine bird imagery as a nod to NASA’s Apollo 11 patch.

GeneralValue 1.2Mar 10, 2021Astrobotic Debuts Their Peregrine Lunar Lander Patch

Astrobotic’s Peregrine Mission One program passed structural qualification testing ahead of its planned maiden voyage and lunar landing in 2021.

CapabilityPlanValue 4.0Sep 8, 2020Astrobotic Successfully Completes Peregrine Lunar Lander Structural Model Testing