Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

GOES T

completedLaunch 2022-021
Launched 3/1/2022HEOService CGSat GTO O
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
1 payload
GOES 18
active
Earth Observation
GEO
Launch Details
Launch Date
3/1/2022
Launch ID
2022-021
Launch Profile
Sat GTO O
Service Type
CG
Customer Type
G
Orbit
HEO
Launch Stack
Operator
United Launch Alliance (ULA)
Launch Vehicle
Atlas V 541 G
Launch Site
Space Launch Complex 41, Cape Canaveral (Cape Canaveral Air Station, Florida)US
Payload Summary
Payload Count
1
Payload Status
active 1
Payload Mission Types
Earth Observation 1
Track
Mentions
47
All verified mentions of this mission in source documents.

NASA awarded a $165,700,000 contract to United Launch Alliance to launch GOES-T on an Atlas V.

RelationshipsFinancialPlanValue 5.0Dec 19, 2019NOAA to complete transition to next-generation GOES weather satellites

GOES-T was slated to launch in 2020 with the same sensors as GOES-16 and GOES-17 before NASA discovered problems with the Advanced Baseline Imager’s cooling system.

PlanCapabilityValue 4.0Mar 6, 2019Are small satellites the solution for space weather monitoring?

Lockheed Martin finished assembling the GOES-T spacecraft in 2019 and was preparing it for environmental testing when NOAA directed the company to halt work due to ABI problems on GOES-17.

PlanCapabilityLegalRelationshipsValue 3.9Jan 9, 2019

NOAA will not launch GOES-T in May 2020.

PlanValue 2.5Jan 9, 2019Lockheed Martin halts work on GOES-T to wait for instrument fix

Lockheed Martin removed the ABI from GOES-T and shipped it to Harris in October 2019.

RelationshipsValue 4.0Jan 9, 2019Lockheed Martin halts work on GOES-T to wait for instrument fix

Lockheed Martin plans to make changes to the GOES-T spacecraft to accommodate the modified ABI, including adding additional sensors and increasing available power.

CapabilityPlanValue 4.0Jan 9, 2019Lockheed Martin halts work on GOES-T to wait for instrument fix

The GOES-17 cooling system problem could delay the planned 2020 launch of the next satellite in the series, GOES-T, pending decisions on instrument modifications and additional testing.

PlanCapabilityValue 4.0Jul 24, 2018NOAA still grappling with instrument problem on new weather satellite
Page3of3
Lockheed Martin halts work on GOES-T to wait for instrument fix