Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Mars 2020

completedLaunch 2020-052
Launched 7/30/2020HEOService CGSat EEO E
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
2 payloads
Ingenuity
retired
Science Exploration
interplanetary
Perseverance
active
Science Explorationinterplanetary
Launch Details
Launch Date
7/30/2020
Launch ID
2020-052
Launch Profile
Sat EEO E
Service Type
CG
Customer Type
G
Orbit
HEO
Launch Stack
Operator
United Launch Alliance (ULA)
Launch Vehicle
Atlas V 541 C
Launch Site
Space Launch Complex 41, Cape Canaveral (Cape Canaveral Air Station, Florida)US
Payload Summary
Payload Count
2
Payload Status
retired 1 / active 1
Payload Mission Types
Science Exploration 2
Track
Mentions
134
All verified mentions of this mission in source documents.

Mars 2020 is the beginning of a Mars Sample Return campaign that will include two missions launching in 2026 to collect cached samples, launch them into Martian orbit, and return them to Earth.

PlanGeneralValue 4.5Jun 30, 2020Mars 2020 launch slips again

The Mars 2020 mission is designed to last at least one Martian year, or 687 Earth days.

PlanValue 4.0Jun 30, 2020Mars 2020 launch slips again

The Mars 2020 Perseverance mission is part of NASA’s robotic exploration of Mars that leads toward sending humans to Mars.

GeneralValue 2.0Jun 18, 2020Webinar Replay | Mars Exploration: Blueprint for the Red Planet

The rover name "Perseverance" was selected through a student competition and serves as the name of the Mars 2020 rover.

GeneralValue 2.0Jun 17, 2020NASA confident Mars 2020 will launch on schedule

The Perseverance rover carries a small commemorative plate measuring 8 by 0.13 m that features a version of the Rod of Asclepius and an image of the Earth showing the Mars 2020 launch trajectory.

CapabilityValue 4.0Jun 17, 2020NASA confident Mars 2020 will launch on schedule

If Mars 2020 misses its current launch window, the next Mars launch window opens in 26 months.

PlanGeneralValue 2.5Jun 17, 2020NASA confident Mars 2020 will launch on schedule

United Launch Alliance is providing the Atlas V rocket to launch Mars 2020.

RelationshipsValue 4.0Jun 11, 2020Mars 2020 launch slips three days

NASA used agency aircraft to ferry personnel and equipment to Kennedy Space Center to reduce risks of coronavirus exposure from commercial flights during Mars 2020 pre-launch preparations.

PlanValue 3.6Jun 11, 2020Mars 2020 launch slips three days

Mars 2020 is closely modeled on the Mars Science Laboratory mission and its Curiosity rover and will land in a similar fashion while incorporating added landing system features for more precise targeting of the landing site.

PlanCapabilityValue 4.0Jun 11, 2020Mars 2020 launch slips three days

On-site personnel at JPL include staff making final preparations for the Mars 2020 mission launching in July, personnel working on a few other critical projects, and employees involved in the safety and security of the lab.

PlanGeneralValue 2.0May 17, 2020NASA’s Michoud Assembly Facility to partially reopen

NASA raised the Mars 2020 mission to the highest priority because its rover Perseverance has a narrow launch window between mid-July and early August 2020.

PlanValue 4.0May 1, 2020Pandemic perseverance: How NASA has adapted to the coronavirus

The Mars 2020 rover mission experienced technical problems that increased its cost by $360,000,000.

FinancialGeneralValue 4.0Apr 30, 2020GAO warns of continued cost growth on NASA exploration programs

Mars 2020’s cost growth required austerity across the portfolio of other Mars missions to accommodate the overruns.

FinancialPlanValue 3.2Apr 30, 2020GAO warns of continued cost growth on NASA exploration programs

The Tianwen-1 mission will launch in the July–August Mars 2020 launch window alongside NASA’s Perseverance Mars 2020 rover and the United Arab Emirates’ Hope Mars orbiter.

PlanValue 4.5Apr 24, 2020China’s Mars mission named Tianwen-1, appears on track for July launch

About 80 people were working on the Mars 2020 spacecraft at Kennedy Space Center in April 2020.

CapabilityGeneralPlanValue 2.0Apr 15, 2020Mars 2020 remains on track for July launch

NASA secured the use of its research aircraft to shuttle Mars 2020 personnel between Kennedy Space Center and California to reduce their exposure to public airlines.

RelationshipsCapabilityValue 3.0Apr 15, 2020Mars 2020 remains on track for July launch

Work on Mars 2020 at Kennedy Space Center has included installing the Mars Helicopter and fueling the spacecraft’s descent stage.

PlanCapabilityValue 3.5Apr 15, 2020Mars 2020 remains on track for July launch

NASA’s Mars 2020 rover mission has a $2,400,000,000 development cost.

FinancialValue 4.0Apr 15, 2020Mars 2020 remains on track for July launch

NASA requires much of its available PPE for its own activities, including launch preparations for the Mars 2020 mission.

LegalValue 1.6Mar 25, 2020NASA looking to play greater role in coronavirus pandemic response

NASA is moving ahead with the Mars 2020 mission and its Perseverance rover because of a narrow launch window that opens in mid-July.

PlanValue 3.7Mar 20, 2020Coronavirus pauses work on JWST
Page4of7