Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Mars 2020

completedLaunch 2020-052
Launched 7/30/2020HEOService CGSat EEO E
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
2 payloads
Ingenuity
retired
Science Exploration
interplanetary
Perseverance
active
Science Explorationinterplanetary
Launch Details
Launch Date
7/30/2020
Launch ID
2020-052
Launch Profile
Sat EEO E
Service Type
CG
Customer Type
G
Orbit
HEO
Launch Stack
Operator
United Launch Alliance (ULA)
Launch Vehicle
Atlas V 541 C
Launch Site
Space Launch Complex 41, Cape Canaveral (Cape Canaveral Air Station, Florida)US
Payload Summary
Payload Count
2
Payload Status
retired 1 / active 1
Payload Mission Types
Science Exploration 2
Track
Mentions
134
All verified mentions of this mission in source documents.

NASA’s Mars 2020 mission includes a radioisotope thermoelectric generator power source using plutonium provided by the Department of Energy.

RelationshipsCapabilityValue 4.0Oct 21, 2020NASA and Energy Department sign cooperative agreement

Radioisotope thermoelectric generators have powered missions such as NASA’s Mars 2020 mission through DOE–NASA cooperation on space nuclear power.

RelationshipsGeneralValue 3.0Sep 17, 2020NASA and Energy Department step up cooperation

NASA elevated Mars 2020 to one of the agency’s overall top priorities alongside the Demo-2 commercial crew mission because missing the Mars 2020 launch window could cause up to a two-year delay and up to $500,000,000 in additional costs.

PlanFinancialValue 4.0Aug 19, 2020NASA’s planetary science program shifts priority to asteroid missions

Mars 2020 cost $2,400,000,000 to build plus $300,000,000 for its first Martian year of operations.

FinancialValue 4.5Aug 18, 2020NASA to perform independent review of Mars sample return plans

The Perseverance rover that Mars 2020 will deliver to the surface of Mars next February will cache samples of Martian rocks.

PlanCapabilityValue 4.0Aug 18, 2020NASA to perform independent review of Mars sample return plans

The Jet Propulsion Laboratory serves as the control center for the Mars 2020 mission.

CapabilityGeneralValue 3.5Jul 30, 2020Atlas 5 launches Mars 2020 mission

NASA's fiscal year 2021 budget proposal included a first-guess cost of $2.5–3 billion for future Mars sample return missions beyond Mars 2020.

FinancialValue 4.0Jul 29, 2020NASA and ESA outline cost of Mars sample return

Mars 2020 will deliver the rover Perseverance to the surface of Mars.

PlanValue 4.0Jul 29, 2020NASA and ESA outline cost of Mars sample return

Mars 2020 cost $2,400,000,000 to develop.

FinancialGeneralValue 4.0Jul 29, 2020NASA and ESA outline cost of Mars sample return

NASA has budgeted $300,000,000 for Mars 2020's first Martian year of operations, defined as 687 Earth days.

FinancialPlanValue 4.0Jul 29, 2020NASA and ESA outline cost of Mars sample return

The Mars 2020 rover Perseverance is based on the Curiosity rover and carries about 50% more surface payload than Curiosity.

CapabilityValue 4.2Jul 28, 2020Mars 2020 ready for launch

The Mars 2020 mission cost NASA $2.4 billion, with an additional $300,000,000 budgeted for the rover’s first Martian year of operations.

FinancialValue 5.0Jul 28, 2020Mars 2020 ready for launch

NASA launch director Omar Baez worked from home during preparations for the Mars 2020 launch.

GovernanceValue 1.2Jul 28, 2020Mars 2020 ready for launch

Mars 2020 will carry the Mars Oxygen In-Situ Resource Utilization Experiment (MOXIE) to demonstrate producing oxygen from Martian atmospheric carbon dioxide.

CapabilityGeneralValue 4.0Jul 26, 2020For Mars sample return, Perseverance is required

Mars 2020’s mission budget is $2.4 billion, plus $300,000,000 for its first Martian year of operations.

FinancialValue 4.0Jul 26, 2020For Mars sample return, Perseverance is required

Processing issues with the Atlas V rocket delayed the Mars 2020 launch from its initial window.

PlanCapabilityValue 3.0Jul 26, 2020For Mars sample return, Perseverance is required

Mars 2020 leverages the design and the skycrane landing system developed for Curiosity.

CapabilityValue 3.5Jul 26, 2020For Mars sample return, Perseverance is required

Mars 2020’s Planetary Instrument for X-ray Lithochemistry (PIXL) is used to analyze rocks on the surface of Mars.

CapabilityValue 4.0Jul 24, 2020NASA’s blueprint for the Red Planet

More than 1,000 people were involved with the Mars 2020 mission, with about 100 people at Cape Canaveral and several hundred more working at the Jet Propulsion Laboratory.

GrowthGeneralValue 3.0Jul 21, 2020NASA still grappling with effects of coronavirus pandemic

Hope was the first of three Mars missions scheduled to launch in late July 2020, with China’s Tianwen-1 and NASA’s Mars 2020 following.

PlanValue 4.0Jul 19, 2020UAE’s Hope mission on its way to Mars
Page3of7