Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Ariane 6

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

ArianeGroupActive
Admin
Variants
4
Canonical variants linked to this family.
Historical missions
8
Missions in the public mission table with actual launch dates.
Peak listed capacity
23,650 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202410
202540
202636
202708
202809
2029010
2030010
2031010
2032010
2033010
2034010
2035010
2036010
2037010
2038010
2039010
2040010

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Ariane 64 Block 2
LEO23,650 kgUnknownUnknownRocketLaunch.org Ariane 64 Block 2
Ariane 64
LEO20,000 kg250 km51.6 degAriane 6 User's Manual

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Amazon LE-03
Ariane 64
Jun 17, 2026
Amazon LE-02
Ariane 64
Apr 30, 2026
Amazon LE-01
Ariane 64
Feb 12, 2026
Galileo FOC FM33/34

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Ariane 62
Not stated5Active
Ariane 62 Block 2
20Development
Ariane 64
Not stated3Active
Ariane 64 Block 2
Not stated0Development
2041010

Forecast Location Split

1 launch location represented.

YearLocationLaunchesConfidenceBasis
2026Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)675%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2027Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)875%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2028Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)975%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2029Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2030Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2031Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2032Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2033Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2034Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2035Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2036Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2037Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2038Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2039Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2040Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2041Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2026 · 75% confidence
6

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2027 · 75% confidence
8

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2028 · 75% confidence
9

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2029 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2030 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ariane 64
SSO15,500 kg500 km97.4 degAriane 6 User's Manual
Ariane 64
Polar15,400 kg900 km90 degAriane 6 User's Manual
Ariane 64
GTO12,950 kgUnknown6 degAriane 6 User's Manual
Ariane 64
GTO11,500 kgUnknown6 degAriane 6 User's Manual
Ariane 64 Block 2
GTO11,500 kgUnknownUnknownArianeGroup Ariane 62/64 key numbers
Ariane 62 Block 2
LEO11,000 kgUnknownUnknownManual estimate: Ariane 62 base LEO capacity (10,000 kg, Ariane 6 User's Manual) scaled by ArianeGroup's published ~10% P160C booster performance gain
Ariane 64
GTO10,700 kgUnknown6 degAriane 6 User's Manual
Ariane 62
LEO10,000 kg250 km51.6 degAriane 6 User's Manual
Ariane 64
TLI8,600 kgUnknown7 degAriane 6 User's Manual
Ariane 64
HEO8,000 kgUnknown6 degAriane 6 User's Manual
Ariane 62
SSO7,200 kg500 km97.4 degAriane 6 User's Manual
Ariane 62
Polar7,000 kg900 km90 degAriane 6 User's Manual
Ariane 64
escape6,900 kgUnknownUnknownAriane 6 User's Manual
Ariane 62
GTO6,000 kgUnknown6 degAriane 6 User's Manual
Ariane 64
GEO5,000 kg35,786 kmUnknownAriane 6 User's Manual
Ariane 62 Block 2
GTO4,500 kgUnknownUnknownArianeGroup Ariane 62/64 key numbers
Ariane 62
GTO4,500 kgUnknown6 degAriane 6 User's Manual
Ariane 62
TLI3,500 kgUnknown6 degAriane 6 User's Manual
Ariane 62
HEO3,300 kgUnknown6 degAriane 6 User's Manual
Ariane 62
escape2,600 kgUnknownUnknownAriane 6 User's Manual
Ariane 62
Dec 17, 2025
Sentinel-1D Mission
Ariane 62
Nov 4, 2025
METOP-SG A1 Mission
Ariane 62
Aug 13, 2025
CSO 3
Ariane 62
Mar 6, 2025
Dummy Payload
Ariane 62
Jul 9, 2024

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track
Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2031 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2032 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2033 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2034 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2035 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2036 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2037 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Mentions
451
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

Arianespace requires European governmental organizations to purchase at least four additional Ariane 6 missions for the 2020–2023 time frame before signing a manufacturing contract for the first 14 Ariane 6 rockets.

RelationshipsPlanValue 4.2Jan 18, 2019Arianespace says full Ariane 6 production held up by missing government contracts
Page23of23

Arianespace had planned to sign a manufacturing contract with ArianeGroup in the second half of 2018 to begin production beyond the first Ariane 6 rocket.

RelationshipsPlanValue 4.0Jan 18, 2019Arianespace says full Ariane 6 production held up by missing government contracts

LeoSat’s constellation design can fit eight satellites on a SpaceX Falcon 9 or an Arianespace Ariane 6 rocket under the current configuration.

CapabilityValue 4.2Oct 11, 2018LeoSat and partners put satellites on a diet

ESA is developing an efficient, reliable launcher family consisting of Vega C, Ariane 62, and Ariane 64.

PlanCapabilityValue 3.5Sep 28, 2018ESA’s leader gets extra time for his vision of European space

Eutelsat signed a contract with Arianespace on 2018-09-10 to launch five satellites on the Ariane 6 rocket by 2027.

RelationshipsPlanValue 4.6Sep 10, 2018Eutelsat becomes first Ariane 6 commercial customer with five-satellite launch contract

ArianeGroup leads development and production of the Ariane 5 and Ariane 6 rockets.

CapabilityValue 3.5Sep 4, 2018ArianeGroup supplier GKN to 3D print turbines for reusable Prometheus engines

GKN Aerospace will supply components for the first- and second-stage engines of the expendable Ariane 6 rocket slated to debut in 2020.

RelationshipsPlanValue 4.3Sep 4, 2018ArianeGroup supplier GKN to 3D print turbines for reusable Prometheus engines

Europe planned to sell Ariane 6 rockets for about half of the $178,000,000 Bryce Space and Technology estimates Arianespace charges for Ariane 5 missions.

FinancialPlanValue 3.6Aug 15, 2018Ariane 6 is nearing completion, but Europe’s work is far from over

Arianespace is under contract to launch the first two pairs of Batch 3 Galileo satellites using the Ariane 6 rocket in 2020 and 2021.

RelationshipsPlanValue 4.5Jul 25, 2018Ariane 5 rocket sends next 4 Galileo satellites into orbit

Ariane 6 is expected to lift 11,500 kg to geostationary transfer orbit when equipped with four solid rocket boosters (Ariane 64).

CapabilityPlanValue 4.0Jul 16, 2018European solid rocket passes key test

Germany will produce turbo pumps for the Ariane 6 rocket and redirect its P120 funds toward technology maturation work on a carbon fiber upper stage that could give Ariane 6 an additional 1,000 kg of lift capacity.

CapabilityFinancialPlanValue 4.0May 30, 2018Germany trades P120 booster production for Ariane 6 turbo pumps, upper stage carbon fiber research