Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2024 | 1 | 0 |
| 2025 | 4 | 0 |
| 2026 | 3 | 6 |
| 2027 | 0 | 8 |
| 2028 | 0 | 9 |
| 2029 | 0 | 10 |
| 2030 | 0 | 10 |
| 2031 | 0 | 10 |
| 2032 | 0 | 10 |
| 2033 | 0 | 10 |
| 2034 | 0 | 10 |
| 2035 | 0 | 10 |
| 2036 | 0 | 10 |
| 2037 | 0 | 10 |
| 2038 | 0 | 10 |
| 2039 | 0 | 10 |
| 2040 | 0 | 10 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Ariane 64 Block 2 | LEO | 23,650 kg | Unknown | Unknown | RocketLaunch.org Ariane 64 Block 2 |
Ariane 64 | LEO | 20,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Amazon LE-03 | Ariane 64 | Jun 17, 2026 |
| Amazon LE-02 | Ariane 64 | Apr 30, 2026 |
| Amazon LE-01 | Ariane 64 | Feb 12, 2026 |
| Galileo FOC FM33/34 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Ariane 62 | Not stated | 5 | Active |
Ariane 62 Block 2 | 2 | 0 | Development |
Ariane 64 | Not stated | 3 | Active |
Ariane 64 Block 2 | Not stated | 0 | Development |
| 2041 | 0 | 10 |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 6 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2027 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 8 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2028 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 9 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2029 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2030 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2031 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2032 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2033 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2034 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2035 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2036 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2037 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2038 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2039 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2040 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2041 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Ariane 64 | SSO | 15,500 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 64 | Polar | 15,400 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 12,950 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 11,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 Block 2 | GTO | 11,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 Block 2 | LEO | 11,000 kg | Unknown | Unknown | Manual estimate: Ariane 62 base LEO capacity (10,000 kg, Ariane 6 User's Manual) scaled by ArianeGroup's published ~10% P160C booster performance gain |
Ariane 64 | GTO | 10,700 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | LEO | 10,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Ariane 64 | TLI | 8,600 kg | Unknown | 7 deg | Ariane 6 User's Manual |
Ariane 64 | HEO | 8,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | SSO | 7,200 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 62 | Polar | 7,000 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | escape | 6,900 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 | GTO | 6,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GEO | 5,000 kg | 35,786 km | Unknown | Ariane 6 User's Manual |
Ariane 62 Block 2 | GTO | 4,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 | GTO | 4,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | TLI | 3,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | HEO | 3,300 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | escape | 2,600 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 |
| Dec 17, 2025 |
| Sentinel-1D Mission | Ariane 62 | Nov 4, 2025 |
| METOP-SG A1 Mission | Ariane 62 | Aug 13, 2025 |
| CSO 3 | Ariane 62 | Mar 6, 2025 |
| Dummy Payload | Ariane 62 | Jul 9, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
On October 16, Arianespace announced that the inaugural flight of the Ariane 64 will be its first launch of 2026.
Arianespace confirmed that the first flight of the Ariane 6 rocket's most powerful variant, with four boosters, will not launch until 2026.
Arianespace will delay the launch of the Ariane 64.
The first Ariane 64 will carry a batch of Amazon’s Project Kuiper satellites.
Arianespace will announce a new launch date for the Ariane 64 about one month ahead of the launch.
The Ariane 62 has two solid rocket boosters, while the Ariane 64 has four.
Amazon has contracted 18 missions with Arianespace, with 16 to be launched on the upgraded Ariane 64 vehicle.
Arianespace did not disclose the reasons for the delay of the Ariane 64 first flight.
Arianespace announced that its Ariane 64 rocket will have its first flight pushed back until 2026.
A European Space Agency update from June 2025 reaffirmed the expectation that the Ariane 64 would fly in 2025.
Arianespace confirmed that the first flight of the Ariane 64 rocket will not be launched until 2026.
ArianeGroup initially stated that Ariane 64 rockets would begin flying in 2025.
The inaugural flight of the Ariane 64 rocket will be the first launch of 2026.
The final flight will be launched aboard an Ariane 62, the two-booster variant of the Ariane 6 rocket.
The first Ariane 64 rocket was initially expected to launch in late 2025, carrying the first batch of Amazon’s Project Kuiper satellites.
Arianespace CEO David Cavaillolès did not confirm whether the Ariane 64 variant would fly in 2025.
Two Ariane 6 rockets have been launched in 2024, with two additional flights expected before the end of the year.
The more powerful variant of Ariane 6, the Ariane 64, is capable of delivering over 21 tonnes to low Earth orbit.
The Sentinel-1D satellite will be launched aboard an Ariane 6 rocket from Europe’s Spaceport in French Guiana.
Ariane 6 is an operational launch system offered in two variants: Ariane 62 and Ariane 64.