Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Ariane 6

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

ArianeGroupActive
Admin
Variants
4
Canonical variants linked to this family.
Historical missions
8
Missions in the public mission table with actual launch dates.
Peak listed capacity
23,650 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202410
202540
202636
202708
202809
2029010
2030010
2031010
2032010
2033010
2034010
2035010
2036010
2037010
2038010
2039010
2040010

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Ariane 64 Block 2
LEO23,650 kgUnknownUnknownRocketLaunch.org Ariane 64 Block 2
Ariane 64
LEO20,000 kg250 km51.6 degAriane 6 User's Manual

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Amazon LE-03
Ariane 64
Jun 17, 2026
Amazon LE-02
Ariane 64
Apr 30, 2026
Amazon LE-01
Ariane 64
Feb 12, 2026
Galileo FOC FM33/34

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Ariane 62
Not stated5Active
Ariane 62 Block 2
20Development
Ariane 64
Not stated3Active
Ariane 64 Block 2
Not stated0Development
2041010

Forecast Location Split

1 launch location represented.

YearLocationLaunchesConfidenceBasis
2026Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)675%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2027Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)875%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2028Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)975%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2029Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2030Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2031Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2032Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2033Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2034Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2035Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2036Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2037Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2038Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2039Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2040Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2041Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2026 · 75% confidence
6

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2027 · 75% confidence
8

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2028 · 75% confidence
9

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2029 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2030 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ariane 64
SSO15,500 kg500 km97.4 degAriane 6 User's Manual
Ariane 64
Polar15,400 kg900 km90 degAriane 6 User's Manual
Ariane 64
GTO12,950 kgUnknown6 degAriane 6 User's Manual
Ariane 64
GTO11,500 kgUnknown6 degAriane 6 User's Manual
Ariane 64 Block 2
GTO11,500 kgUnknownUnknownArianeGroup Ariane 62/64 key numbers
Ariane 62 Block 2
LEO11,000 kgUnknownUnknownManual estimate: Ariane 62 base LEO capacity (10,000 kg, Ariane 6 User's Manual) scaled by ArianeGroup's published ~10% P160C booster performance gain
Ariane 64
GTO10,700 kgUnknown6 degAriane 6 User's Manual
Ariane 62
LEO10,000 kg250 km51.6 degAriane 6 User's Manual
Ariane 64
TLI8,600 kgUnknown7 degAriane 6 User's Manual
Ariane 64
HEO8,000 kgUnknown6 degAriane 6 User's Manual
Ariane 62
SSO7,200 kg500 km97.4 degAriane 6 User's Manual
Ariane 62
Polar7,000 kg900 km90 degAriane 6 User's Manual
Ariane 64
escape6,900 kgUnknownUnknownAriane 6 User's Manual
Ariane 62
GTO6,000 kgUnknown6 degAriane 6 User's Manual
Ariane 64
GEO5,000 kg35,786 kmUnknownAriane 6 User's Manual
Ariane 62 Block 2
GTO4,500 kgUnknownUnknownArianeGroup Ariane 62/64 key numbers
Ariane 62
GTO4,500 kgUnknown6 degAriane 6 User's Manual
Ariane 62
TLI3,500 kgUnknown6 degAriane 6 User's Manual
Ariane 62
HEO3,300 kgUnknown6 degAriane 6 User's Manual
Ariane 62
escape2,600 kgUnknownUnknownAriane 6 User's Manual
Ariane 62
Dec 17, 2025
Sentinel-1D Mission
Ariane 62
Nov 4, 2025
METOP-SG A1 Mission
Ariane 62
Aug 13, 2025
CSO 3
Ariane 62
Mar 6, 2025
Dummy Payload
Ariane 62
Jul 9, 2024

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track
Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2031 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2032 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2033 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2034 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2035 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2036 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2037 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Mentions
451
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

The launch of Sentinel-1D was successfully completed on an Ariane 6 rocket.

GeneralPlanValue 4.0Nov 6, 2025Sentinel-1D lanciato con successo da Ariane 6 per l’Europa

The satellite Sentinel-1D was successfully launched from the European spaceport in Kourou with the new Ariane 6 rocket.

Page13of23
PlanCapabilityValue 4.0Nov 5, 2025Sentinel-1D completa la costellazione Copernicus e rafforza la leadership europea

Sentinel-1D reached its orbit after being launched successfully by the European Ariane 6 rocket from French Guiana.

GeneralPlanValue 4.2Nov 5, 2025El Sentinel-1D ya orbita la Tierra para monitorizar océanos y glaciares

The Sentinel-1D mission is the third commercial mission of the Ariane 6 rocket.

GeneralValue 2.0Nov 5, 2025El Sentinel-1D ya orbita la Tierra para monitorizar océanos y glaciares

MT Aerospace announced a major contract with ArianeGroup for the delivery of key components for 27 Ariane 6 rockets, covering flights 16 to 42.

RelationshipsValue 5.0Nov 4, 2025OHB Purchases Remaining Stake in MT Aerospace

The Block 2 variant of the Ariane 6 rocket is expected to be introduced in 2026.

PlanValue 4.0Nov 4, 2025OHB Purchases Remaining Stake in MT Aerospace

The Ariane 6 rocket lifted off from the Guiana Space Centre at 22:03 CET on Tuesday in its two-booster configuration.

PlanGeneralValue 3.8Nov 4, 2025Arianespace Launches Sentinel-1D Aboard Ariane 6 Rocket

MT Aerospace is developing carbon-fibre-reinforced plastic tanks for the PHOEBUS initiative, which aims to equip the Block 2 variant of the Ariane 6 rocket with a lighter, more capable upper stage.

CapabilityPlanValue 4.0Nov 4, 2025OHB Purchases Remaining Stake in MT Aerospace

The upper module, which includes the satellite encapsulated within the fairing, has been transferred and is coupled to the launcher, an Ariane 6 rocket.

PlanGeneralValue 3.0Nov 3, 2025Todo listo para el vuelo del Ariane 6 que porta el Sentinel-1D de la constelación Copernicus

Arianespace is preparing to launch the Sentinel-1D satellite using the Ariane 6 launch vehicle.

PlanGeneralValue 4.0Nov 3, 2025Sentinel-1D + Ariane 6 ready for liftoff

Sentinel-1D will launch on November 4 at 18:03 local time from the European spaceport in Kourou, French Guiana aboard an Ariane 6 rocket operated by Arianespace.

PlanGeneralValue 4.2Oct 30, 2025Sentinel-1D, il satellite di monitoraggio ambientale Copernicus pronto per il lancio

Sener has participated in the development of the Sentinel-1D satellite, which is scheduled to launch on November 4 from French Guiana aboard an Ariane 6 rocket.

PlanCapabilityRelationshipsValue 4.0Oct 29, 2025Sener participa en el desarrollo del satélite de observación de la Tierra Sentinel-1D

Germany contributed approximately 800 million euros to the development of the Ariane 6 rocket.

FinancialGeneralValue 4.5Oct 27, 2025Endmontage der Vinci-Triebwerke künftig in Lampoldshausen

The Vinci upper stage engine of the Ariane 6 rocket will be assembled in Lampoldshausen.

CapabilityPlanValue 3.5Oct 27, 2025Endmontage der Vinci-Triebwerke künftig in Lampoldshausen

The Sentinel-1D satellite was encapsulated in the Ariane 6 rocket fairing.

CapabilityPlanValue 3.0Oct 27, 2025RT by @GewoonLukas_: Just over a week to go until launch for @CopernicusEU Sentinel-1D! Late last week, the satellite was encapsulated in the #Ariane6 rocket fairing. Liftoff is set for 22:02 CET (21:02 GMT) on 4 November. 📸ESA - M. Pédoussaut

ArianeGroup Deutschland will manufacture the Vinci engine for the Ariane 6 launch vehicle in Lampoldshausen.

CapabilityPlanValue 4.0Oct 27, 2025Endmontage der Vinci-Triebwerke künftig in Lampoldshausen

An update from the European Space Agency (ESA) in June 2025 reaffirmed the expectation that Ariane 64 would fly in 2025.

PlanValue 3.0Oct 22, 2025Arianespace pospone el primer vuelo del Ariane 64 hasta 2026

At that time, ArianeGroup stated that Ariane 64 rockets would begin flights in 2025.

PlanValue 4.0Oct 22, 2025Arianespace pospone el primer vuelo del Ariane 64 hasta 2026

The first Ariane 64 rocket was expected to launch in late 2025, carrying the first batch of Amazon's Project Kuiper satellites.

PlanRelationshipsValue 4.0Oct 22, 2025Arianespace pospone el primer vuelo del Ariane 64 hasta 2026

IASI-NG was lifted into space by an Ariane 6 launcher from the Guiana Space Centre.

PlanGeneralValue 3.2Oct 22, 20251st data rec’d from Met-Op-SG’s IASI-NG