Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2025 | 2 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 5 |
| 2028 | 0 | 8 |
| 2029 | 0 | 11 |
| 2030 | 0 | 14 |
| 2031 | 0 | 18 |
| 2032 | 0 | 22 |
| 2033 | 0 | 24 |
| 2034 | 0 | 24 |
| 2035 | 0 | 24 |
| 2036 | 0 | 24 |
| 2037 | 0 | 24 |
| 2038 | 0 | 24 |
| 2039 | 0 | 24 |
| 2040 | 0 | 24 |
| 2041 | 0 | 24 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
New Glenn 7x2 | LEO | 45,000 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
New Glenn 7x2 | GTO | 13,600 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| SpaceMobile-007 Mission | New Glenn 7x2 | Apr 19, 2026 |
| ESCAPADE | New Glenn 7x2 | Nov 13, 2025 |
| Blue Ring Pathfinder Mission | New Glenn 7x2 | Jan 16, 2025 |
Upcoming mission rows with announced launch timing.
| Mission | Variant |
|---|
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
New Glenn 7x2 | Not stated | 3 | Active |
2 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 3 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2026 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2027 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 5 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2027 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2028 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 8 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2028 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2029 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 10 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2029 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 1 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2030 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2030 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 2 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2031 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 14 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2031 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 4 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2032 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2032 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 6 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2033 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2033 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2034 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2034 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2035 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2035 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2036 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2036 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2037 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2037 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn 7x2 |
| TLI |
| 7,000 kg |
| Unknown |
| Unknown |
| Wikipedia New Glenn (citing Blue Origin official specs) |
| Announced |
|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
Blue Origin is developing its first orbital launch vehicle, New Glenn, to transition customers from competitors' rockets.
Blue Origin’s BE-4 engines burn methane and are being developed to power the New Glenn orbital rocket.
mu Space, a Thai company that ordered a launch of Blue Origin’s New Glenn orbital rocket in 2017, included a package with several experiments from universities and organizations in Thailand on this New Shepard flight.
New Glenn is designed to carry 13 metric tons to geosynchronous transfer orbit (GTO).
New Glenn’s dual-launch arrangement will allow two satellites to launch together without coordinating mass differences as is required on Arianespace’s Ariane 5.
New Glenn is designed from the start to feature a reusable first stage.
Sky Perfect JSAT signed a launch contract with Blue Origin for a yet-to-be-procured satellite to support the business case for the New Glenn launch vehicle.
mu Space released a request for proposal on 2018-06-25 for construction of the satellite it will launch in 2021 on Blue Origin’s New Glenn rocket.
Blue Origin’s New Glenn orbital launch vehicle has a first stage designed to be reused and will launch from Cape Canaveral Air Force Station.
Blue Origin plans to use frequent New Shepard test flights to build experience for the BE-3 engine, which will also be used on the upper stage of the New Glenn orbital launch vehicle.
The BE-4 engine is being developed for Blue Origin’s New Glenn and is a competitor to serve as the first-stage engine for United Launch Alliance’s Vulcan rocket.