Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2025 | 2 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 5 |
| 2028 | 0 | 8 |
| 2029 | 0 | 11 |
| 2030 | 0 | 14 |
| 2031 | 0 | 18 |
| 2032 | 0 | 22 |
| 2033 | 0 | 24 |
| 2034 | 0 | 24 |
| 2035 | 0 | 24 |
| 2036 | 0 | 24 |
| 2037 | 0 | 24 |
| 2038 | 0 | 24 |
| 2039 | 0 | 24 |
| 2040 | 0 | 24 |
| 2041 | 0 | 24 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
New Glenn 7x2 | LEO | 45,000 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
New Glenn 7x2 | GTO | 13,600 kg | Unknown | Unknown | Blue Origin New Glenn vehicle page |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| SpaceMobile-007 Mission | New Glenn 7x2 | Apr 19, 2026 |
| ESCAPADE | New Glenn 7x2 | Nov 13, 2025 |
| Blue Ring Pathfinder Mission | New Glenn 7x2 | Jan 16, 2025 |
Upcoming mission rows with announced launch timing.
| Mission | Variant |
|---|
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
New Glenn 7x2 | Not stated | 3 | Active |
2 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 3 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2026 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2027 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 5 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2027 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2028 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 8 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2028 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 0 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2029 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 10 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2029 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 1 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2030 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2030 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 2 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2031 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 14 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2031 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 4 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2032 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2032 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 6 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2033 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2033 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2034 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2034 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2035 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2035 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2036 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2036 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
| 2037 | Space Launch Complex 36, Cape Canaveral (Cape Canaveral Air Station, Florida) | 16 | 50% | New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, fa... |
| 2037 | Space Launch Complex 14, Vandenberg Space Force Base (South Vandenberg AFB, California) | 8 | 45% | Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a... |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn 7x2 |
| TLI |
| 7,000 kg |
| Unknown |
| Unknown |
| Wikipedia New Glenn (citing Blue Origin official specs) |
| Announced |
|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. |
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
New Glenn has reached multiple flights by 2026 but is still in early ramp. Base discounts 8-12/year aspiration and reaches 16/year only after booster reuse, factory flow, and cust...
Vandenberg SLC-14 is included because Space Force selected Blue Origin to continue final lease process, but greenfield heavy/super-heavy construction creates a multi-year ramp.
Development of New Glenn remained on schedule to support a first launch in 2021.
The total cost of the New Glenn program is north of $2.5 billion, including $1,000,000,000 for facilities in Florida where the rocket will be assembled and launched.
New Glenn features a seven-meter-diameter payload fairing and a lift capacity of 45 metric tons to LEO and 13 metric tons to geostationary transfer orbit.
Jeff Bezos estimated Blue Origin would spend about $1,000,000,000 on the manufacturing and launch facilities for New Glenn.
Exploration Park hosts a Blue Origin factory for producing the New Glenn rocket and a OneWeb Satellites factory where OneWeb and Airbus will build satellites for OneWeb’s broadband constellation.
Blue Origin is redeveloping Launch Complex 36 for New Glenn launches with a first launch scheduled for 2021.
Development of Blue Origin’s BE-4 engine was scheduled to be completed later in 2019 and the engine will be produced at a new factory in Huntsville, Alabama for use on United Launch Alliance’s Vulcan and Blue Origin’s New Glenn.
New Glenn’s 7-meter fairing provides large mass and volume capabilities intended to match Telesat’s constellation plans and reduce launch costs per satellite.
New Glenn will have the opportunity to demonstrate heavy-lift and large-volume capabilities to civil, commercial, and national security customers when it begins launching in 2021.
Telesat is the fifth customer to sign up to use Blue Origin’s reusable New Glenn launcher.
New Glenn is scheduled to begin launching in 2021.
The United States Air Force selected both Blue Origin’s New Glenn launch vehicle and ULA’s Vulcan rocket in October 2018 under its Launch Services Agreement contract.
The Huntsville factory will build dozens of BE-4 engines per year for both ULA’s Vulcan and Blue Origin’s New Glenn vehicles.
Blue Origin will use the Huntsville factory to produce the BE-3U engine, a liquid-hydrogen/liquid-oxygen version of the BE-3 modified for New Glenn’s second stage.
Blue Origin had previously planned to introduce its New Glenn orbital vehicle in 2020 but is now likely to enter service in 2021.
On 2018-10-10, the Air Force Space and Missile Systems Center allocated up to $500,000,000 to Blue Origin for the two-stage version of the reusable New Glenn rocket.
Space Florida will own and operate an 850,000-square-foot building where Blue Origin will manufacture the New Glenn launch vehicle.
The Air Force awarded Blue Origin $500,000,000 in LSA funding to develop the New Glenn rocket.
Harris Corporation will work with Blue Origin to develop satellite antennas optimized for the New Glenn rocket.
Blue Origin is supporting The Moon Race initiative alongside the European Space Agency and Airbus to foster the next generation of lunar exploration using Blue Moon and New Glenn.