Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

HANBIT

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

Manufacturer unknownActive
Admin
Variants
1
Canonical variants linked to this family.
Historical missions
1
Missions in the public mission table with actual launch dates.
Peak listed capacity
90 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202510
202601
202701
202801
202901
203001
203101
203201
203301
203401
203501
203601
203701
203801
203901
204001
204101

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
HANBIT-NANO
SSO90 kg500 kmUnknownINNOSPACE HANBIT-Nano official product page

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Launch 2025-F09
HANBIT-NANO
Dec 23, 2025

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
HANBIT-NANO
Not stated1Active

Forecast Location Split

1 launch location represented.

YearLocationLaunchesConfidenceBasis
2026Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2027Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2028Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2029Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2030Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2031Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2032Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2033Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2034Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2035Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2036Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2037Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2038Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2039Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2040Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
2041Alcantara Space Center125%Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.
Alcantara Space Center
2026 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2027 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2028 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2029 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2030 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2031 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Track
Alcantara Space Center
2032 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2033 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2034 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2035 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2036 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Alcantara Space Center
2037 · 25% confidence
1

Catalog-completeness placeholder for active HANBIT family; not used by latest forecast capacity snapshot.

Mentions
132
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

The specific launch date for HANBIT-Nano will depend on vehicle readiness, the local launch campaign, regulatory approval procedures, weather conditions, and flight safety requirements.

PlanLegalGeneralValue 2.0Jul 22, 2026INNOSPACE targets August for SEBIT test flight and November for HANBIT-Nano return-to-flight mission
Page1of7

INNOSPACE’s first commercial HANBIT-Nano launch mission ended early in December 2025.

PlanValue 2.0Jul 22, 2026INNOSPACE targets August for SEBIT test flight and November for HANBIT-Nano return-to-flight mission

The HANBIT-Nano mission will carry InnoSat-0, an internally developed test satellite.

GeneralPlanCapabilityValue 3.5Jul 22, 2026INNOSPACE targets August for SEBIT test flight and November for HANBIT-Nano return-to-flight mission

On-site installation and launch preparations for HANBIT-Nano are underway at Alcântara Space Center.

PlanCapabilityValue 3.0Jul 22, 2026INNOSPACE targets August for SEBIT test flight and November for HANBIT-Nano return-to-flight mission

INNOSPACE plans a return-to-flight mission for its HANBIT-Nano small satellite launch vehicle in November from Brazil’s Alcântara Space Center.

PlanGeneralValue 4.2Jul 22, 2026INNOSPACE targets August for SEBIT test flight and November for HANBIT-Nano return-to-flight mission

The HANBIT-Nano mission is intended to validate design improvements and strengthened quality assurance measures introduced after the early termination of its first commercial launch mission in December 2025.

PlanGovernanceValue 3.0Jul 22, 2026INNOSPACE targets August for SEBIT test flight and November for HANBIT-Nano return-to-flight mission

Launch vehicle components and ground support equipment for HANBIT-Nano began maritime transport in early June.

PlanGeneralValue 2.0Jul 22, 2026INNOSPACE targets August for SEBIT test flight and November for HANBIT-Nano return-to-flight mission

INNOSPACE is preparing the SEBIT and HANBIT-Nano missions in cooperation with ALADA, the Brazilian Air Force, the Brazilian Space Agency, and other authorities.

PlanRelationshipsValue 4.0Jul 22, 2026INNOSPACE targets August for SEBIT test flight and November for HANBIT-Nano return-to-flight mission

INNOSPACE revised HANBIT-Nano’s return-to-flight timeline from the third quarter to November.

PlanValue 4.0Jul 22, 2026INNOSPACE targets August for SEBIT test flight and November for HANBIT-Nano return-to-flight mission

INNOSPACE’s SEBIT program expands the company’s activities beyond the HANBIT orbital launcher family into the suborbital services market.

GrowthValue 3.5Jul 6, 2026Accordo tra INNOSPACE e ALADA: il Centro Spaziale di Alcântara ospiterà il primo volo di prova di SEBIT

INNOSPACE’s launch vehicle lineup includes SEBIT, BLACK BIRD, and the HANBIT series of satellite launch vehicles.

CapabilityGeneralValue 3.5Jul 6, 2026INNOSPACE signs launch site agreement with ALADA for SEBIT test flight in Brazil

Operational data from the HANBIT flight will serve as the baseline architecture for the planned Space Quantum Computing Center.

PlanCapabilityValue 3.0Jun 17, 2026Space-Quantum Convergence: INNOSPACE and Norma Partner for In-Orbit Quantum Computing Demonstrations

Norma will develop a compact quantum computing payload centered around a Quantum Processing Unit for integration into INNOSPACE’s HANBIT launch vehicle family.

CapabilityRelationshipsPlanValue 4.2Jun 17, 2026Space-Quantum Convergence: INNOSPACE and Norma Partner for In-Orbit Quantum Computing Demonstrations

INNOSPACE is undergoing review with the Korea AeroSpace Administration to obtain launch authorisation for a follow-up HANBIT-Nano launch.

LegalPlanValue 4.0Jun 4, 2026INNOSPACE reports 420-second ground firing test for LiMEK-04 methane engine technology

INNOSPACE plans a follow-up HANBIT-Nano launch in the third quarter of this year, subject to final approval.

PlanGeneralValue 3.6Jun 4, 2026INNOSPACE reports 420-second ground firing test for LiMEK-04 methane engine technology

INNOSPACE plans to integrate its 0.4-ton thrust liquid methane engine, LiMEK-04, into the kick stage of its next-generation HANBIT-Micro launch vehicle.

PlanCapabilityRelationshipsValue 4.0Jun 4, 2026INNOSPACE reports 420-second ground firing test for LiMEK-04 methane engine technology

INNOSPACE identified the root cause of the HANBIT-Nano mission failure, upgraded components, and optimized manufacturing processes.

CapabilityPlanGrowthValue 3.4Jun 4, 2026INNOSPACE reports 420-second ground firing test for LiMEK-04 methane engine technology

INNOSPACE is undergoing review with the Korea AeroSpace Administration to obtain launch authorisation for HANBIT-Nano.

LegalValue 4.2Jun 4, 2026INNOSPACE reports 420-second ground firing test for LiMEK-04 methane engine technology

INNOSPACE is continuing development of the HANBIT-Micro combustor with liquid oxygen as a coolant.

CapabilityPlanValue 3.5Jun 4, 2026INNOSPACE reports 420-second ground firing test for LiMEK-04 methane engine technology

INNOSPACE conducted a 237-second ground firing test in May 2024 on the 0.4-ton thrust methane engine combustor for the HANBIT-Micro kick stage.

CapabilityPlanValue 4.0Jun 4, 2026INNOSPACE reports 420-second ground firing test for LiMEK-04 methane engine technology