Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2023 | 2 | 0 |
| 2024 | 4 | 0 |
| 2025 | 5 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 7 |
| 2028 | 0 | 15 |
| 2029 | 0 | 31 |
| 2030 | 0 | 50 |
| 2031 | 0 | 71 |
| 2032 | 0 | 87 |
| 2033 | 0 | 103 |
| 2034 | 0 | 117 |
| 2035 | 0 | 129 |
| 2036 | 0 | 133 |
| 2037 | 0 | 137 |
| 2038 | 0 | 137 |
| 2039 | 0 | 137 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Starship V3 | LEO | 150,000 kg | Unknown | Unknown | Starlink V3 batch-calibrated Starship capacity assumption |
Starship V2 | LEO | 35,000 kg | Unknown | Unknown | SpaceX Starship - Wikipedia |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Launch 2026-U02 | Starship V3 | May 22, 2026 |
| Launch 2025-U04 | Starship V2 | Oct 13, 2025 |
| Launch 2025-U03 | Starship V2 | Aug 26, 2025 |
| Launch 2025-U02 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Starship V1.0 | Not stated | 6 | Active |
Starship V2 | Not stated | 5 | Retired |
Starship V3 | Not stated | 1 | Active |
| 2040 | 0 | 137 |
| 2041 | 0 | 137 |
5 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2026 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2026 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 0 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2026 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2026 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 0 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2027 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 1 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2027 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 5 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2027 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 1 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2028 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 2 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2028 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 3 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2028 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2028 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2028 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2029 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 6 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2029 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 8 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2029 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 8 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2029 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2029 | Cape Canaveral Space Force Station | SLC-37A | 2 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2030 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2030 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 12 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2030 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 9 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2030 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 11 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Starship V3 | TLI | 21,000 kg | Unknown | Unknown | SpaceX Starship public vehicle page |
Starship V1.0 | LEO | 15,000 kg | Unknown | Unknown | SpaceX Starship public/current block summary |
Starship V2 |
| May 27, 2025 |
| Launch 2025-F03 | Starship V2 | Mar 6, 2025 |
| Launch 2025-F01 | Starship V2 | Jan 16, 2025 |
| Launch 2024-U06 | Starship V1.0 | Nov 19, 2024 |
| Launch 2024-U04 | Starship V1.0 | Oct 13, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Declining launch costs enabled by platforms like SpaceX Starship are making orbital solar energy increasingly economically viable for global baseload power.
Pending FCC approval, SpaceX intends to use its Starship launch vehicle to deploy the initial shells of the data center constellation.
SpaceX is developing Starship, which is described as the largest rocket ever built, for missions to the Moon and Mars.
Starship Version 3, scheduled for launch in March, will be about 1.5 meters taller, measuring approximately 124.4 meters.
Starship Version 2 has a total height of approximately 121 meters.
SpaceX conducted the 11th Starship flight test in October 2025.
SpaceX planned to launch most Falcon 9 missions from SLC-40, including all Dragon missions, with LC-39A dedicated to Falcon Heavy and Starship operations.
The 11th launch was the final flight of Starship Version 2.
Elon Musk wrote on X on January 26 (Japan time) that the 12th launch of SpaceX's enhanced Starship is six weeks away.
Starship's propulsion system will be comprehensively revised to accommodate the new Raptor 3 engine.
The 12th Starship launch is expected to occur in March.
Near‑term space programs mentioned as advancing rapidly include NASA Artemis, Chinese crewed and robotic lunar programs, and SpaceX Starship development.
Starship heat shield tiles are designed to withstand the extreme temperatures generated by atmospheric reentry.
Starbase is the SpaceX industrial and testing site used for development of the Starship program.
SpaceX’s Starship had a fully successful test on October 13, 2025.
Heat shield tiles constitute the thermal protection system of the Starship vehicle.
SpaceX plans to launch Starship into orbit after conducting a couple more test flights.
Blue Origin’s New Glenn rocket reached orbit and sent spacecraft on their way to Mars one month after SpaceX’s Starship success.
SpaceX’s development approach for Starship allows components that pass tests to be employed in flight.
SpaceX conducted Starship tile tests during a Falcon 9 launch from Vandenberg on January 25, 2026.