Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Starship

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

SpaceXActive
Admin
Variants
3
Canonical variants linked to this family.
Historical missions
12
Missions in the public mission table with actual launch dates.
Peak listed capacity
150,000 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202320
202440
202550
202613
202707
2028015
2029031
2030050
2031071
2032087
20330103
20340117
20350129
20360133
20370137
20380137
20390137

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Starship V3
LEO150,000 kgUnknownUnknownStarlink V3 batch-calibrated Starship capacity assumption
Starship V2
LEO35,000 kgUnknownUnknownSpaceX Starship - Wikipedia

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Launch 2026-U02
Starship V3
May 22, 2026
Launch 2025-U04
Starship V2
Oct 13, 2025
Launch 2025-U03
Starship V2
Aug 26, 2025
Launch 2025-U02

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Starship V1.0
Not stated6Active
Starship V2
Not stated5Retired
Starship V3
Not stated1Active
20400137
20410137

Forecast Location Split

5 launch locations represented.

YearLocationLaunchesConfidenceBasis
2026Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)050%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2026Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2026Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)065%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2026Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)365%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2026Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)050%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2027Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)050%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2027Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)165%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2027Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)565%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2027Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)150%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2027Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2028Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)250%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2028Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)365%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2028Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)765%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2028Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)350%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2028Cape Canaveral Space Force Station | SLC-37A045%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2029Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)650%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2029Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)865%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2029Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)865%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2029Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)750%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
2029Cape Canaveral Space Force Station | SLC-37A245%Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
2030Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)1250%SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
2030Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)1265%LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c...
2030Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)965%Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th...
2030Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)1150%Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2026 · 50% confidence
0

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Cape Canaveral Space Force Station | SLC-37A
2026 · 45% confidence
0

Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2026 · 65% confidence
0

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)
2026 · 65% confidence
3

Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.

Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)
2026 · 50% confidence
0

Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.

Starship V3
TLI21,000 kgUnknownUnknownSpaceX Starship public vehicle page
Starship V1.0
LEO15,000 kgUnknownUnknownSpaceX Starship public/current block summary
Starship V2
May 27, 2025
Launch 2025-F03
Starship V2
Mar 6, 2025
Launch 2025-F01
Starship V2
Jan 16, 2025
Launch 2024-U06
Starship V1.0
Nov 19, 2024
Launch 2024-U04
Starship V1.0
Oct 13, 2024

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track
Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2027 · 50% confidence
0

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2027 · 65% confidence
1

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas)
2027 · 65% confidence
5

Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.

Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas)
2027 · 50% confidence
1

Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.

Cape Canaveral Space Force Station | SLC-37A
2027 · 45% confidence
0

Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.

Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida)
2028 · 50% confidence
2

SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.

Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida)
2028 · 65% confidence
3

LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...

Mentions
1556
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

Artemis III requires Orion to rendezvous with a separately launched Starship HLS in lunar orbit.

PlanCapabilityGeneralValue 4.0Jan 22, 2026The Architecture We Inherited: Artemis, Commercial Space, and the Long Shadow of 2010
Page26of78

SpaceX Starship will provide significantly more payload volume including a 9-meter fairing when it enters commercial service.

PlanCapabilityValue 3.5Jan 21, 2026Blue Origin unveils TeraWave communication constellation for the enterprise

SpaceX’s planned near-term Starship activity includes a high-risk in-orbit propellant transfer and development of a larger Starship variant.

PlanCapabilityValue 3.6Jan 20, 2026The Key Questions for a Potential SpaceX IPO in 2026: Analyst Roundtable

Starlab is designed as a single-launch station optimized for rapid deployment using Starship.

CapabilityPlanValue 4.0Jan 20, 2026Congressional Budget Victory Cements NASA’s Commercial-First Strategy

SpaceX’s Starship vehicle is entering a cycle of high-cadence orbital testing and is positioned as a primary engine for orbital infrastructure density.

PlanCapabilityValue 3.0Jan 20, 2026SpaceX IPO Speculation Peaks as Analysts Weigh 2026 Valuation and Strategic Consolidation

Elon Musk has historically tied SpaceX’s access to public markets to the stability of the Starship program.

GeneralValue 1.6Jan 20, 2026SpaceX IPO Speculation Peaks as Analysts Weigh 2026 Valuation and Strategic Consolidation

A full SpaceX IPO would allow Starlink cash flows to absorb Starship program risk within a single public entity.

FinancialGeneralValue 2.5Jan 20, 2026The Key Questions for a Potential SpaceX IPO in 2026: Analyst Roundtable

Starship’s target operational launch cost is under $100 million per launch at operational cadence.

FinancialCapabilityValue 4.0Jan 20, 2026Congressional Budget Victory Cements NASA’s Commercial-First Strategy

SpaceX’s Starship targets 100–150 metric tons to low Earth orbit in a fully reusable configuration and over 200 metric tons in expendable configuration.

CapabilityGeneralValue 4.5Jan 20, 2026Congressional Budget Victory Cements NASA’s Commercial-First Strategy

SpaceX is developing the Starship rocket with critical NASA deadlines approaching.

PlanGeneralValue 3.0Jan 20, 2026The Key Questions for a Potential SpaceX IPO in 2026: Analyst Roundtable

An IPO would allow SpaceX to raise large-scale capital to fund Starlink V3, Starship expansion, and broader space exploration plans.

FinancialGrowthPlanValue 3.5Jan 20, 2026The Key Questions for a Potential SpaceX IPO in 2026: Analyst Roundtable

Artemis 3 is currently scheduled for 2027 and is expected to be pushed back because SpaceX is behind on delivering the Starship megarocket needed for the mission.

PlanGeneralValue 4.0Jan 19, 2026NASA moves moon rocket to launch pad ahead of Artemis 2 mission

SpaceX also utilizes a Methalox engine, known as the Raptor, for its Starship program.

CapabilityValue 4.0Jan 16, 2026Canada Rocket Company enters the ‘Launch the North’ sweepstakes and raises $6.2M in seed round

Larger rockets, such as Starship and New Glenn, allow for building space telescopes without the complexity of origami-like folding.

CapabilityGeneralValue 2.2Jan 16, 2026Superheavy-lift rockets like SpaceX's Starship could transform astronomy by making space telescopes cheaper

SpaceX's Starship is a fully reusable launch system that supports the company's ambitions for high-capacity space transport.

CapabilityGrowthValue 3.2Jan 14, 2026Starship: nuove immagini alimentano il dibattito online

The first Starship mission to Mars is named 'Heart of Gold'.

PlanValue 3.0Jan 14, 2026Musk: il primo Starship diretto su Marte si chiamerà Heart of Gold

Elon Musk announced the name 'Heart of Gold' for the first Starship to Mars.

GeneralValue 2.0Jan 14, 2026Musk: il primo Starship diretto su Marte si chiamerà Heart of Gold

Starship is a fully reusable launch system developed by SpaceX for missions in terrestrial, lunar, and interplanetary orbits.

CapabilityValue 3.0Jan 14, 2026Musk: il primo Starship diretto su Marte si chiamerà Heart of Gold

SpaceX continues to make rapid progress on its Starship program infrastructure.

CapabilityGrowthValue 1.5Jan 13, 2026RT by @Cosmic_Penguin: SpaceX continues to make rapid progress on its Starship program infrastructure, with significant developments at LC-39A on the Space Coast, preparations for a new launch site at SLC-37, and upgrades nearing completion at Starbase in Texas.

Upgrades at Starbase in Texas for the Starship program are nearing completion.

PlanGeneralValue 2.2Jan 13, 2026RT by @Cosmic_Penguin: SpaceX continues to make rapid progress on its Starship program infrastructure, with significant developments at LC-39A on the Space Coast, preparations for a new launch site at SLC-37, and upgrades nearing completion at Starbase in Texas.