Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2023 | 2 | 0 |
| 2024 | 4 | 0 |
| 2025 | 5 | 0 |
| 2026 | 1 | 3 |
| 2027 | 0 | 7 |
| 2028 | 0 | 15 |
| 2029 | 0 | 31 |
| 2030 | 0 | 50 |
| 2031 | 0 | 71 |
| 2032 | 0 | 87 |
| 2033 | 0 | 103 |
| 2034 | 0 | 117 |
| 2035 | 0 | 129 |
| 2036 | 0 | 133 |
| 2037 | 0 | 137 |
| 2038 | 0 | 137 |
| 2039 | 0 | 137 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Starship V3 | LEO | 150,000 kg | Unknown | Unknown | Starlink V3 batch-calibrated Starship capacity assumption |
Starship V2 | LEO | 35,000 kg | Unknown | Unknown | SpaceX Starship - Wikipedia |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Launch 2026-U02 | Starship V3 | May 22, 2026 |
| Launch 2025-U04 | Starship V2 | Oct 13, 2025 |
| Launch 2025-U03 | Starship V2 | Aug 26, 2025 |
| Launch 2025-U02 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Starship V1.0 | Not stated | 6 | Active |
Starship V2 | Not stated | 5 | Retired |
Starship V3 | Not stated | 1 | Active |
| 2040 | 0 | 137 |
| 2041 | 0 | 137 |
5 launch locations represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2026 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2026 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 0 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2026 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2026 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 0 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 0 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2027 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 1 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2027 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 5 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2027 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 1 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2027 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2028 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 2 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2028 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 3 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2028 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2028 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 3 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2028 | Cape Canaveral Space Force Station | SLC-37A | 0 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2029 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 6 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2029 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 8 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2029 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 8 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2029 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 7 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
| 2029 | Cape Canaveral Space Force Station | SLC-37A | 2 | 45% | Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year. |
| 2030 | Space Launch Complex 37B, Cape Canaveral (Cape Canaveral Air Station, Florida) | 12 | 50% | SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment. |
| 2030 | Launch Complex 39A, NASA Kennedy Space Center, Florida (NASA John F. Kennedy Space Center, Florida) | 12 | 65% | LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range c... |
| 2030 | Starship Orbital Pad 1, Boca Chica (Starbase, Boca Chica Beach, Texas) | 9 | 65% | Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing th... |
| 2030 | Starship Orbital Pad 2, Boca Chica (Starbase, Boca Chica Beach, Texas) | 11 | 50% | Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range. |
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Starship V3 | TLI | 21,000 kg | Unknown | Unknown | SpaceX Starship public vehicle page |
Starship V1.0 | LEO | 15,000 kg | Unknown | Unknown | SpaceX Starship public/current block summary |
Starship V2 |
| May 27, 2025 |
| Launch 2025-F03 | Starship V2 | Mar 6, 2025 |
| Launch 2025-F01 | Starship V2 | Jan 16, 2025 |
| Launch 2024-U06 | Starship V1.0 | Nov 19, 2024 |
| Launch 2024-U04 | Starship V1.0 | Oct 13, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
Starbase remains the development and early operational hub. Base ramps slowly from test cadence to routine operations; by 2031 it is one of two pads sharing the 25/year site cap.
Second Starbase pad provides incremental operations after pad commissioning. Mature OLP-A + OLP-B total is capped at 25/year in the base/high range.
Modeled as second SLC-37 Starship pad, lagging SLC-37B by one to two years. Mature split reaches 38/year by 2037, keeping complex total at 76/year.
SLC-37B is modeled as the first high-throughput CCSFS Starship pad. Base reaches half of the SLC-37 complex cap by 2035, not immediately after redevelopment.
LC-39A Starship is expected to ramp after initial Florida infrastructure/testing. Base remains below the 44/year EIS cap even after maturity to reflect range conflicts, tanker ope...
SpaceX’s Starship rocket is designated as the primary launch vehicle for the orbital AI data center initiative.
SpaceX said Starship will soon achieve launch rates of one flight per hour carrying 200 tons of payload.
SpaceX is developing Starship, described as the largest rocket ever built, for missions to the Moon and Mars.
SpaceX is developing the Starship rocket, which is designed to carry future manned missions into space.
SpaceX aims to deploy one million satellites operating as data centers using its Starship rocket.
SpaceX aims to launch up to one million satellites operating as data centers using the Starship rocket and aims to increase launch rates toward one flight per hour carrying 200 tons of payload.
Artemis 2, Long March 10A with Mengzhou, and Starship V3 each have significant implications for lunar ambitions.
Starship V3 is undergoing preparations.
The start of Booster 19 prelaunch test preparations signals continuity of Starship ground test activities in 2026.
The commercial plan for the combined SpaceX–xAI venture depends entirely on the flight rate of Starship.
Starbase in Texas is the SpaceX site where development and testing operations for the Starship program are concentrated.
Starship has conducted 11 test flights since 2023.
SpaceX intends to use Starship both for deploying on-orbit data centre satellites and for expanding Starlink with larger, more capable satellites.
Starship is expected to begin delivering V3 Starlink satellites and dedicated AI satellites later in 2026.
SpaceX’s Starship is designed for full reusability and to carry much more cargo per flight than previous vehicles, enabling potential launch costs below $200 per kilogram.
Booster 19 is a Super Heavy booster prototype that is part of the Starship launch system.
Jared Isaacman identified increasing flight rates of New Glenn and Starship as key for both companies because both plan to use in-space propellant transfer for their landers.
The Super Heavy first stage is designed to provide the thrust necessary for liftoff of the complete Starship vehicle.
SpaceX’s proposal relies on the development of Starship to dramatically reduce launch costs and enable deployment of unprecedented mass to orbit at high frequency.
SpaceX plans to establish permanent bases on the Moon using Starship’s in-space propellant transfer capability.