Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II

retired
Human SpaceflightGEOCOSPAR 2026-069ALaunched 4/1/2026
Admin Edit
Mission & Launch
Launch Mission
Artemis II Mission
Launch Vehicle
SLS Block 1
Launch Date
4/1/2026
Last Contact
4/11/2026
Orbit & Mass
Orbit Class
GEO
Altitude
35,122.5 km
Inclination
28.35 deg
Dry Mass
9,400 kg
Total Mass
25,848 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2026-069A
Track
Mentions
1094
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Reid Wiseman said the Artemis II crew would have been able to land on the Moon if they had been given the lander keys.

GeneralValue 2.0Apr 17, 2026Jeremy Hansen and Artemis II crew discuss historic lunar mission

NASA's Artemis II test flight has launched.

Plan
Page5of55
Value 4.0
Apr 16, 2026
RT by @GewoonLukas_: On the move! Now that NASA's Artemis II test flight launched, work focuses on Artemis III set to launch next year! The mobile launcher is moving from Launch Pad 39B to the Vehicle Assembly Building for rocket stacking operations for Artemis III. pic.

Moog contributed to the Space Launch System rocket and the Orion crew capsule for Artemis II.

RelationshipsValue 4.0Apr 15, 2026Moog Space SVP Mark Covelli Details Meteor Satellite Bus at Space Symposium

JSC and NASA’s Ames Research Center supported the work that prepared Artemis II for flight.

RelationshipsPlanValue 3.0Apr 14, 2026NASA Administrator Jared Isaacman On Artemis, Budget, And Establishing a Lasting Space Vision

Ensign-Bickford Aerospace & Defense’s hardware managed the separation of Orion’s Launch Abort System, Crew Module, and Service Module during Artemis II.

CapabilityPlanValue 4.0Apr 14, 2026Ensign-Bickford Hardware Supports Successful Artemis II Lunar Mission

The four-person Artemis II crew traveled approximately 1.4 million miles during the mission.

GeneralCapabilityValue 2.8Apr 14, 2026Ensign-Bickford Hardware Supports Successful Artemis II Lunar Mission

Artemis II’s heat shield and thermal protection system were major focus areas after orbit insertion.

CapabilityValue 2.0Apr 14, 2026NASA Administrator Jared Isaacman On Artemis, Budget, And Establishing a Lasting Space Vision

Artemis II was the first crewed flight beyond low Earth orbit in more than 50 years.

GeneralValue 2.8Apr 14, 2026Ensign-Bickford Hardware Supports Successful Artemis II Lunar Mission

Artemis II validated the Space Launch System rocket and the Orion spacecraft.

CapabilityValue 3.5Apr 14, 2026Ensign-Bickford Hardware Supports Successful Artemis II Lunar Mission

Jared Isaacman said the Artemis II heat shield showed discoloration rather than a missing chunk.

CapabilityValue 3.0Apr 14, 2026NASA Administrator Jared Isaacman On Artemis, Budget, And Establishing a Lasting Space Vision

Ensign-Bickford Aerospace & Defense supplied precision energetics and mechanical systems for staging and separation events on the Space Launch System rocket and the Orion spacecraft during Artemis II.

RelationshipsCapabilityValue 4.6Apr 14, 2026Ensign-Bickford Hardware Supports Successful Artemis II Lunar Mission

Ensign-Bickford Aerospace and Defense provided separation systems on the Artemis II crew module.

RelationshipsCapabilityValue 4.0Apr 14, 2026EBAD’s Lisa Brown Talks Supporting Customer Missions at Space Symposium

Ensign-Bickford Aerospace & Defense manufactured Artemis II hardware at its facilities in Simsbury, Connecticut, and Moorpark, California.

CapabilityGrowthValue 4.0Apr 14, 2026Ensign-Bickford Hardware Supports Successful Artemis II Lunar Mission

Artemis II used Orion, which was launched on a fully loaded rocket and underwent crewed ascent, the first 24 hours on orbit, and parachute-assisted splashdown.

CapabilityValue 3.8Apr 14, 2026NASA Administrator Jared Isaacman On Artemis, Budget, And Establishing a Lasting Space Vision

Artemis II successfully concluded on April 10, 2026.

GeneralValue 3.5Apr 14, 2026Oklahoma Positions as Commercial Space Manufacturing Hub at Space Symposium

The Artemis II crew reached a maximum distance of 406,771 kilometers from Earth, the farthest humans have traveled to date.

GeneralValue 4.0Apr 13, 2026El regreso de Artemis II da paso a Artemis III, el siguiente gran ensayo antes de pisar la Luna

The Orion capsule on Artemis II reentered Earth’s atmosphere at nearly 40,000 kilometers per hour.

CapabilityValue 4.5Apr 13, 2026Artemis II astronauts gazed at our Moon with joy, curiosity, and reverence. Through finer robotic orbital views, so can you.

Artemis II was NASA’s first crewed trip around the Moon in more than half a century.

GeneralValue 2.5Apr 13, 2026El regreso de Artemis II da paso a Artemis III, el siguiente gran ensayo antes de pisar la Luna

Artemis II astronauts Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen completed a nearly 10-day mission.

GeneralPlanValue 3.0Apr 13, 2026El regreso de Artemis II da paso a Artemis III, el siguiente gran ensayo antes de pisar la Luna

The Artemis II astronauts viewed the lunar farside, including the 930-kilometer Orientale basin, during their flyby.

CapabilityGeneralValue 4.0Apr 13, 2026Artemis II astronauts gazed at our Moon with joy, curiosity, and reverence. Through finer robotic orbital views, so can you.