Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II

retired
Human SpaceflightGEOCOSPAR 2026-069ALaunched 4/1/2026
Admin Edit
Mission & Launch
Launch Mission
Artemis II Mission
Launch Vehicle
SLS Block 1
Launch Date
4/1/2026
Last Contact
4/11/2026
Orbit & Mass
Orbit Class
GEO
Altitude
35,122.5 km
Inclination
28.35 deg
Dry Mass
9,400 kg
Total Mass
25,848 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2026-069A
Track
Mentions
1095
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

NASA will not decide the Artemis II launch date until system checks are complete.

PlanValue 3.0Jan 22, 2026NASA: decisione sulla data di lancio di Artemis II rinviata

NASA teams are evaluating the rocket, spacecraft, ground systems, and crew in parallel for Artemis II.

Plan
Page46of55
Capability
Value 3.4
Jan 22, 2026
NASA: decisione sulla data di lancio di Artemis II rinviata

Artemis II will use radio communication primarily to talk to Mission Control.

CapabilityGeneralValue 3.0Jan 22, 2026How Artemis 2 will communicate from deep space

Artemis II is the first crewed flight of the Artemis program.

GeneralValue 2.0Jan 22, 2026NASA: decisione sulla data di lancio di Artemis II rinviata

Artemis II will be in the Moon's communications shadow for approximately 45 minutes during each far-side pass.

CapabilityPlanValue 3.2Jan 22, 2026How Artemis 2 will communicate from deep space

Artemis II's upcoming wet dress rehearsal will clarify near-term viability and schedule risk.

PlanGeneralValue 2.8Jan 22, 2026The Architecture We Inherited: Artemis, Commercial Space, and the Long Shadow of 2010

The planned rollout of Artemis II on January 17 represents a significant technical achievement and policy paradox.

PlanValue 2.0Jan 22, 2026The Architecture We Inherited: Artemis, Commercial Space, and the Long Shadow of 2010

Artemis II will be able to send videos and conduct video conferences with people on Earth via its communications links.

CapabilityGeneralValue 3.5Jan 22, 2026How Artemis 2 will communicate from deep space

Successful completion of Artemis II will certify the integrated launch system consisting of SLS, Orion, and the European Service Module for future lunar crewed missions.

CapabilityGeneralValue 4.0Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

Artemis II is a roughly 10-day mission that will travel around the Moon and return to Earth with crew members Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen of the Canadian Space Agency.

PlanGeneralValue 4.0Jan 20, 20261/20宇宙ニュース・インターステラテクノロジズ、総額201億円の資金調達を完了 ほか3件

Artemis II will carry four astronauts inside the Orion spacecraft on a 10-day circumlunar mission with return to Earth.

PlanGeneralValue 4.5Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

Artemis II will undergo wet dress rehearsals including propellant loading and propellant drain rehearsals prior to launch, with an earliest possible launch date of February 6, 2026.

PlanValue 4.0Jan 20, 20261/20宇宙ニュース・インターステラテクノロジズ、総額201億円の資金調達を完了 ほか3件

Airbus Space posted on X on 19 January 2026 an image confirming the SLS rocket on the launch pad and the readiness of the launch system for Artemis II.

PlanCapabilityValue 3.5Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

The SLS configuration used for Artemis II is designed to support crewed flight following the uncrewed Artemis I test.

CapabilityPlanValue 4.0Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

Artemis II is the first crewed flight of the Artemis program.

GeneralValue 1.5Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

The four astronauts aboard Orion on Artemis II will test life support, navigation, and communication systems in operational conditions during a circumlunar flight.

CapabilityPlanValue 4.0Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

The placement of the SLS rocket on the launch pad constitutes one of the final visible phases before the Artemis II launch and precedes final verification and pre-countdown preparations.

PlanGeneralValue 3.0Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

NASA transported the Space Launch System rocket and the Orion spacecraft for Artemis II to Launch Pad 39B at Kennedy Space Center on January 17, 2026.

PlanGeneralValue 4.3Jan 20, 20261/20宇宙ニュース・インターステラテクノロジズ、総額201億円の資金調達を完了 ほか3件

Artemis II is the first crewed flight of the Artemis program planned to fly around the Moon following the uncrewed Artemis I mission.

PlanGeneralValue 3.0Jan 19, 2026Artemis II, incontro tra NASA e creator durante il rollout

Artemis II’s mission profile involves a multi-trans-lunar injection burn that will send the crew on a free-return trajectory extending more than 230,000 miles from Earth.

PlanGeneralValue 4.0Jan 19, 2026The Artemis Campaign: A Brief Cislunar History