Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II

retired
Human SpaceflightGEOCOSPAR 2026-069ALaunched 4/1/2026
Admin Edit
Mission & Launch
Launch Mission
Artemis II Mission
Launch Vehicle
SLS Block 1
Launch Date
4/1/2026
Last Contact
4/11/2026
Orbit & Mass
Orbit Class
GEO
Altitude
35,122.5 km
Inclination
28.35 deg
Dry Mass
9,400 kg
Total Mass
25,848 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2026-069A
Track
Mentions
1095
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

The solid rocket boosters will operate as a matched pair for the first crewed mission of the SLS system, Artemis II.

PlanCapabilityValue 4.0Jan 29, 2026Northrop Grumman Boosters Set For First Crewed Lunar Voyage Of Artemis Era
Page44of55

Artemis II will not land on the lunar surface nor enter orbit around Earth.

PlanValue 4.0Jan 29, 2026La tripulación de Artemis II entra en cuarentena antes de su viaje a la Luna

The Launch Abort System abort capability will be fully active for Artemis II to provide an additional safety layer for the four astronaut crew.

CapabilityPlanValue 4.0Jan 29, 2026Northrop Grumman Boosters Set For First Crewed Lunar Voyage Of Artemis Era

The Artemis II crew will reside in rooms inside the Neil A. Armstrong Operations and Checkout Building during quarantine.

GeneralValue 2.0Jan 29, 2026La tripulación de Artemis II entra en cuarentena antes de su viaje a la Luna

Data and experience collected during Artemis II are expected to form a foundation for subsequent lunar landing flights and longer duration crewed expeditions into deep space.

PlanGrowthValue 3.0Jan 29, 2026Northrop Grumman Boosters Set For First Crewed Lunar Voyage Of Artemis Era

Teams at Kennedy Space Center are preparing the Space Launch System (SLS) rocket and the Orion spacecraft for Artemis II.

PlanValue 3.0Jan 29, 2026La tripulación de Artemis II entra en cuarentena antes de su viaje a la Luna

NASA has identified backup launch windows for Artemis II in March: March 6–9 and March 11.

PlanValue 4.0Jan 29, 2026La tripulación de Artemis II entra en cuarentena antes de su viaje a la Luna

NASA has identified backup launch windows for Artemis II in April: April 1, April 3–6, and April 30.

PlanValue 4.0Jan 29, 2026La tripulación de Artemis II entra en cuarentena antes de su viaje a la Luna

The four astronauts on Artemis II will spend about 10 days on a mission around the Moon.

PlanValue 3.0Jan 29, 2026Northrop Grumman Boosters Set For First Crewed Lunar Voyage Of Artemis Era

Artemis II final training activities over the next days will include mission simulations and medical checks.

PlanValue 2.5Jan 29, 2026La tripulación de Artemis II entra en cuarentena antes de su viaje a la Luna

Artemis II is a roughly ten-day crewed mission around the Moon and is the first crewed flight of NASA's Artemis campaign.

PlanGeneralValue 3.0Jan 29, 2026La tripulación de Artemis II entra en cuarentena antes de su viaje a la Luna

During quarantine the Artemis II astronauts will be able to maintain regular contact with friends, family, and colleagues who meet quarantine requirements, will avoid public places, will wear masks, and will practice distancing while continuing final training activities.

PlanCapabilityValue 2.0Jan 29, 2026La tripulación de Artemis II entra en cuarentena antes de su viaje a la Luna

NASA will conduct a fueling rehearsal for the Space Launch System (SLS) as early as January 31 (U.S. time) in preparation for the crewed lunar orbital mission Artemis II.

PlanGeneralValue 4.3Jan 28, 2026NASA、有人月周回「アルテミス2」打ち上げ前の燃料試験を早ければ1月31日に実施へ

Artemis II will be the first crewed test flight to the Moon following the uncrewed Artemis I mission in 2022.

PlanValue 3.2Jan 27, 2026La industria espacial española, una pieza tecnológica clave en la misión Artemis II

Artemis II is scheduled to launch the Orion spacecraft in the first weeks of February on a crewed mission to the Moon.

PlanValue 4.0Jan 27, 2026La industria espacial española, una pieza tecnológica clave en la misión Artemis II

The planned use of SKY Perfect JSAT’s ground station equipment for Artemis II represents the first time those facilities have been used for lunar exploration.

PlanGeneralValue 3.5Jan 27, 2026スカパーJSAT、月探査計画「アルテミス2」の地上局に選定–アジアの民間企業で唯一

Artemis II will carry four astronauts on a ten-day trip to the Moon.

PlanGeneralValue 4.0Jan 27, 2026La industria espacial española, una pieza tecnológica clave en la misión Artemis II

SKY Perfect JSAT is the only Asian commercial company selected as a ground station for the Orion one-way Doppler measurements for Artemis II.

RelationshipsGeneralValue 4.0Jan 27, 2026スカパーJSAT、月探査計画「アルテミス2」の地上局に選定–アジアの民間企業で唯一

The ground station equipment to be used for Artemis II is the same equipment employed in the commercial near-Earth tracking network service JSAT Space Line, which began in September 2025.

PlanGeneralValue 3.7Jan 27, 2026スカパーJSAT、月探査計画「アルテミス2」の地上局に選定–アジアの民間企業で唯一

Artemis II will launch on NASA’s Space Launch System (SLS) carrying the Orion spacecraft and a crew of four astronauts on an approximately 10-day mission to orbit the Moon and return to Earth.

PlanCapabilityGeneralValue 5.0Jan 26, 2026Integrasys y la Universidad de Sevilla, seleccionadas por la NASA para el seguimiento de la misión Artemis II