Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II

retired
Human SpaceflightGEOCOSPAR 2026-069ALaunched 4/1/2026
Admin Edit
Mission & Launch
Launch Mission
Artemis II Mission
Launch Vehicle
SLS Block 1
Launch Date
4/1/2026
Last Contact
4/11/2026
Orbit & Mass
Orbit Class
GEO
Altitude
35,122.5 km
Inclination
28.35 deg
Dry Mass
9,400 kg
Total Mass
25,848 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2026-069A
Track
Mentions
1095
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Artemis II is targeting a second wet dress rehearsal on Thursday, Feb. 19.

PlanValue 3.6Feb 17, 2026Engineers replace faulty filter as NASA clears path for Artemis 2 wet dress rehearsal

The Artemis II crew will not participate in the wet dress rehearsal, but closeout teams will practice sealing the Orion hatch.

Plan
Page38of55
Value 4.0
Feb 17, 2026
Engineers replace faulty filter as NASA clears path for Artemis 2 wet dress rehearsal

Artemis II will have four astronauts on board.

CapabilityValue 3.2Feb 17, 2026Haridopolos Praises Isaacman As ‘Dynamic Leader’ For NASA

Integrasys will monitor trajectory deviations for Artemis II during both launch phases and orbital operations.

CapabilityPlanValue 4.0Feb 17, 2026Á. Sánchez (Integrasys): "La conciencia situacional espacial es clave para la defensa"

NASA could see the Artemis II four-person crew launch as early as March 6 pending test results and data reviews.

PlanValue 3.5Feb 17, 2026Engineers replace faulty filter as NASA clears path for Artemis 2 wet dress rehearsal

NASA relaxed its fueling safety limit for hydrogen leaks by a factor of four between Artemis I and Artemis II.

LegalCapabilityValue 4.0Feb 16, 2026China conducts a multi-element test unlike any other nation in firm march to Luna | Moon Monday #262

Artemis II is scheduled to fly four astronauts around the Moon and back no earlier than March.

PlanGeneralValue 4.0Feb 16, 2026China conducts a multi-element test unlike any other nation in firm march to Luna | Moon Monday #262

Artemis II will not include a lunar surface landing and will provide the first human eyes on the lunar far side since the 20th century.

PlanGeneralValue 4.2Feb 10, 2026First Crewed Moon Flyby In 54 Years: Artemis II

Artemis II will follow a free-return trajectory and carry commander Reid Wiseman, pilot Victor Glover, mission specialist Christina Koch and Canadian astronaut Jeremy Hansen on a ten-day flight around the far side of the Moon in Orion's small capsule.

PlanCapabilityValue 4.3Feb 10, 2026The Race Is On: Artemis, China and Musk Turn the Moon Into the Next Strategic High Ground

As of the article update on February 3, 2026, the next possible Artemis II launch window shifted into March 2026.

PlanValue 2.0Feb 10, 2026First Crewed Moon Flyby In 54 Years: Artemis II

Artemis II astronauts will make geological observations of the lunar far side and can almost instantly interpret and adjust those observations in ways orbital cameras cannot.

CapabilityValue 3.5Feb 10, 2026First Crewed Moon Flyby In 54 Years: Artemis II

Before Artemis II launch, NASA must complete final checks including testing systems while the rocket is fueled and validating the crew emergency exit and propellant handling.

PlanCapabilityValue 3.2Feb 10, 2026First Crewed Moon Flyby In 54 Years: Artemis II

If Artemis II is successful, it will be the first time any person has been back to the Moon since 1972 when Apollo 17 returned to Earth.

PlanGeneralValue 2.5Feb 10, 2026First Crewed Moon Flyby In 54 Years: Artemis II

The propellant discussed for Artemis II operations includes hydrazine, a molecule composed of nitrogen and hydrogen that is highly energy-dense.

CapabilityValue 2.5Feb 10, 2026First Crewed Moon Flyby In 54 Years: Artemis II

Artemis II has no descent stage, no surface operations and will not plant a new flag.

CapabilityGeneralValue 3.6Feb 10, 2026The Race Is On: Artemis, China and Musk Turn the Moon Into the Next Strategic High Ground

The two primary components of Artemis II are the Space Launch System rocket and the Orion crew capsule.

GeneralValue 3.0Feb 10, 2026First Crewed Moon Flyby In 54 Years: Artemis II

The Artemis II crew will consist of four astronauts who will orbit the Moon on a 10-day voyage and return via splashdown in the Pacific Ocean.

PlanGeneralValue 4.0Feb 10, 2026First Crewed Moon Flyby In 54 Years: Artemis II

Artemis II will be the first crewed deep-space mission since Apollo 17 in 1972 if it flies in 2026.

PlanGeneralValue 3.0Feb 10, 2026The Race Is On: Artemis, China and Musk Turn the Moon Into the Next Strategic High Ground

Artemis II's mission goal is to send people to pass by the Moon and test all engineering systems in space before Artemis III.

PlanCapabilityValue 3.5Feb 10, 2026First Crewed Moon Flyby In 54 Years: Artemis II

Artemis II is targeting a launch no earlier than March 6, 2026.

PlanValue 4.2Feb 10, 2026The Race Is On: Artemis, China and Musk Turn the Moon Into the Next Strategic High Ground