Artemis II

retired
Human SpaceflightGEOCOSPAR 2026-069ALaunched 4/1/2026
Admin Edit
Mission & Launch
Launch Mission
Artemis II Mission
Launch Vehicle
SLS Block 1
Launch Date
4/1/2026
Last Contact
4/11/2026
Orbit & Mass
Orbit Class
GEO
Altitude
35,122.5 km
Inclination
28.35 deg
Dry Mass
9,400 kg
Total Mass
25,848 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2026-069A
Track
Mentions
1095
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Preparation for the Capcom role for Artemis II includes hundreds of hours in simulators running nominal and off-nominal scenarios.

CapabilityValue 2.8Mar 4, 2026The voice of mission control: Jenni Gibbons on guiding Artemis 2 to the Moon

Artemis II is being prepared for launch in the weeks ahead as a flight test.

Plan
Page33of55
General
Value 3.2
Mar 4, 2026
NASA Makes Major Changes to Artemis Program

Teams discovered a helium issue on the Interim Cryogenic Propulsion Stage after Artemis II hardware was returned to the Vehicle Assembly Building.

CapabilityGeneralValue 4.0Mar 4, 2026NASA Makes Major Changes to Artemis Program

Teams prepared actions for Artemis II hardware that included replacing batteries in the flight termination system and conducting end-to-end testing for range safety requirements.

PlanValue 4.0Mar 4, 2026NASA Makes Major Changes to Artemis Program

NASA is preparing to roll the Artemis II vehicle out to the launch pad in the coming weeks.

PlanGeneralValue 3.0Mar 3, 2026RT by @GewoonLukas_: Following the discovery of a helium flow issue with the Artemis II rocket, engineers have determined the issue and made repairs. NASA is preparing to roll the vehicle out to the launch pad in the coming weeks ahead of a potential launch in April. pic.

Artemis II was rolled back from the launchpad into the Vehicle Assembly Building at Kennedy Space Center to address helium-related fueling problems on a rocket stage.

PlanValue 4.0Mar 3, 2026Probemission vor der Mondlandung an

A helium flow issue was discovered with the Artemis II rocket.

CapabilityGeneralValue 2.5Mar 3, 2026RT by @GewoonLukas_: Following the discovery of a helium flow issue with the Artemis II rocket, engineers have determined the issue and made repairs. NASA is preparing to roll the vehicle out to the launch pad in the coming weeks ahead of a potential launch in April. pic.

NASA expects a launch of Artemis II to be possible in early April if the fueling problems are resolved.

PlanValue 3.5Mar 3, 2026Probemission vor der Mondlandung an

Engineers determined the helium flow issue on the Artemis II rocket and repaired it.

CapabilityPlanValue 3.0Mar 3, 2026RT by @GewoonLukas_: Following the discovery of a helium flow issue with the Artemis II rocket, engineers have determined the issue and made repairs. NASA is preparing to roll the vehicle out to the launch pad in the coming weeks ahead of a potential launch in April. pic.

NASA is targeting a potential launch of Artemis II in April.

PlanValue 3.0Mar 3, 2026RT by @GewoonLukas_: Following the discovery of a helium flow issue with the Artemis II rocket, engineers have determined the issue and made repairs. NASA is preparing to roll the vehicle out to the launch pad in the coming weeks ahead of a potential launch in April. pic.

NASA will avoid larger planned modifications to the Space Launch System and Orion configurations following Artemis I, the upcoming Artemis II flight test, and a more robust test approach for Artemis III due to remaining development and production risks.

PlanValue 4.0Mar 3, 2026Probemission vor der Mondlandung an

NASA’s crawler-transporter 2 carried the Artemis II Space Launch System rocket with the Orion spacecraft into the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Feb. 25, 2026.

PlanGeneralValue 4.0Mar 2, 2026NASA Adds Mission to Artemis Lunar Program, Updates Architecture

Artemis II, a crewed lunar flyby, was delayed from a planned March launch to no earlier than April due to technical issues.

PlanValue 4.2Mar 2, 2026La NASA modifica el programa Artemis y retrasa el regreso tripulado a la Luna hasta 2028

Once troubleshooting is complete, the Artemis II SLS rocket will roll back to Launch Complex 39B to prepare for the Artemis II test flight.

PlanValue 4.0Mar 2, 2026NASA Adds Mission to Artemis Lunar Program, Updates Architecture

The Artemis II SLS rocket’s upper stage is the interim cryogenic propulsion stage.

CapabilityValue 4.0Mar 2, 2026NASA Adds Mission to Artemis Lunar Program, Updates Architecture

The feasibility of the lunar catapult concept depends heavily on the success of the Artemis II and Artemis III missions scheduled for March 2026 and 2027, respectively.

PlanValue 2.0Mar 2, 2026SpaceX Lunar Manufacturing Proposal Triggers Surge in APT Satellite Shares

Artemis II is a test flight that will launch four astronauts around the Moon and return them to Earth.

PlanGeneralValue 4.0Mar 2, 2026NASA Adds Mission to Artemis Lunar Program, Updates Architecture

Returning the Artemis II stack to the Vehicle Assembly Building is necessary to gain full access to the upper stage hardware.

PlanCapabilityValue 3.2Mar 1, 2026NASA prepares Artemis II rocket for rollback after upper stage issue

The four-person Artemis II crew has been released from launch quarantine and remains in Houston while work proceeds in Florida.

PlanGeneralValue 2.5Mar 1, 2026NASA prepares Artemis II rocket for rollback after upper stage issue

Configuring the vehicle for rollback preserves the option to launch Artemis II during the April launch window.

PlanValue 4.0Mar 1, 2026NASA prepares Artemis II rocket for rollback after upper stage issue