Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II

retired
Human SpaceflightGEOCOSPAR 2026-069ALaunched 4/1/2026
Admin Edit
Mission & Launch
Launch Mission
Artemis II Mission
Launch Vehicle
SLS Block 1
Launch Date
4/1/2026
Last Contact
4/11/2026
Orbit & Mass
Orbit Class
GEO
Altitude
35,122.5 km
Inclination
28.35 deg
Dry Mass
9,400 kg
Total Mass
25,848 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2026-069A
Track
Mentions
1095
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

NASA plans to begin coverage of Artemis II tanking operations at 7:45 a.m. on April 1.

PlanValue 3.5Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

The Artemis II countdown schedule calls for all non-essential personnel to leave Launch Complex 39B from L-15H30M to L-14H.

Plan
Page27of55
General
Value 4.0
Mar 31, 2026
Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

NASA said weather conditions were 80% favorable for launch across the two-hour Artemis II window.

PlanGeneralValue 3.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

Artemis II is the first crewed mission to the Moon in more than 50 years.

GeneralValue 2.0Mar 31, 2026Artemis II, Orion integra ESM-2 per missione con equipaggio

The Artemis II countdown schedule ends with booster ignition, umbilical separation, and liftoff at T-0.

PlanGeneralValue 3.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

The Artemis II countdown includes planned holds before launch and can still be halted after terminal count begins at T-10 minutes.

PlanValue 3.5Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

Artemis II is an early step toward a permanent lunar presence.

PlanGeneralValue 2.0Mar 31, 2026Top Space Lawmaker on Moon Base, Artemis Plans

Artemis II is set to launch Wednesday night from Cape Canaveral.

PlanValue 4.0Mar 31, 2026Top Space Lawmaker on Moon Base, Artemis Plans

Artemis II is expected to break the Apollo 13 distance record for the farthest point from Earth reached by humans.

PlanValue 3.0Mar 31, 2026Artemis II, Orion integra ESM-2 per missione con equipaggio

The Artemis II crew is scheduled to walk out to the launch pad bus from the Kennedy Space Center quarantine facility at 1:56 p.m. on April 1.

PlanValue 4.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

Artemis II will fly between 6,400 and 9,000 kilometers above the lunar surface, depending on the launch window.

PlanCapabilityValue 4.0Mar 31, 2026Artemis II, Orion integra ESM-2 per missione con equipaggio

The Artemis II countdown schedule includes Orion communications system activation from L-6H40M to L-6H10M.

PlanValue 4.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

Jeremy Hansen is making his first mission off Earth on Artemis II after 17 years of space training, policy work, and management.

PlanGovernanceValue 3.3Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

Artemis II remains scheduled to launch at 6:24 p.m. on Wednesday, April 1, from Kennedy Space Center.

PlanValue 4.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

Artemis II tanking operations are scheduled to start around 7:30 a.m. on April 1.

PlanValue 3.5Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

The Artemis II countdown schedule includes launch abort system hatch closure from L-1H40M to L1H30M.

PlanValue 4.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

If an Artemis II countdown stop requires more than 3 minutes of hold time, the count recycles back to T-10.

PlanValue 3.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

An X-class solar flare that erupted on March 31 is not expected to create a radiation concern for Earth or the Artemis II launch.

GeneralPlanValue 3.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

The Artemis II quartet was publicly named to the crew on April 3, 2023.

PlanGeneralValue 2.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt

SpaceX lost communications with a Starlink satellite on March 31, and the loss is not expected to threaten the Artemis II launch.

GeneralPlanValue 3.0Mar 31, 2026Canadian astronaut Jeremy Hansen’s Moon mission in final hours before launch attempt