Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis II

retired
Human SpaceflightGEOCOSPAR 2026-069ALaunched 4/1/2026
Admin Edit
Mission & Launch
Launch Mission
Artemis II Mission
Launch Vehicle
SLS Block 1
Launch Date
4/1/2026
Last Contact
4/11/2026
Orbit & Mass
Orbit Class
GEO
Altitude
35,122.5 km
Inclination
28.35 deg
Dry Mass
9,400 kg
Total Mass
25,848 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2026-069A
Track
Mentions
1095
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Artemis II is expected to lose communications when the spacecraft passes behind the Moon at around 6:44 p.m. EDT on Monday.

PlanCapabilityValue 4.0Apr 6, 2026Artemis II Crew Travels Farther from Earth Than Apollo 13 in a New Record
Page18of55

Apollo 8 and Apollo 13 astronaut Jim Lovell recorded a special message for the Artemis II astronauts before his death in 2025.

GeneralValue 2.0Apr 6, 2026Artemis II Crew Travels Farther from Earth Than Apollo 13 in a New Record

Artemis II surpassed the previous human distance record set by Apollo 13 in 1970 by about 4,102 miles.

CapabilityValue 3.2Apr 6, 2026RT by @AJ_FI: A new milestone for humankind: The crew of Artemis II are now the farthest any human has ever travelled, reaching a maximum distance of 252,752 miles from Earth. This surpasses the previous record set by Apollo 13 in 1970 by about 4,102 miles. pic.

Artemis II is the first crewed mission to the Moon since Apollo 17 in 1972.

PlanGeneralValue 3.0Apr 6, 2026Las imágenes clave de la misión Artemis II, que hoy sobrevuela la Luna

Artemis II uses a free-return eight-shaped trajectory that would bring Orion back to Earth even if propulsion failed.

CapabilityGeneralValue 4.0Apr 6, 2026La misión Artemis II acomete el desafío tecnológico de sobrevolar la Luna

Artemis II has entered the Moon's sphere of influence.

GeneralValue 1.2Apr 6, 2026Las imágenes clave de la misión Artemis II, que hoy sobrevuela la Luna

Artemis II set the record for the farthest distance traveled from Earth by a crewed mission, surpassing Apollo 13's 248,655-mile record set in 1970.

CapabilityGeneralValue 3.5Apr 6, 2026La tripulación de la Orion, los cuatro humanos que más lejos han viajado al espacio hasta ahora

Orion will rely on its propulsion system and the European service module for Artemis II's lunar flyby.

CapabilityPlanValue 3.0Apr 6, 2026La misión Artemis II acomete el desafío tecnológico de sobrevolar la Luna

During the lunar flyby, the Artemis II crew will be able to observe the solar corona with the naked eye.

CapabilityPlanValue 3.0Apr 5, 2026Earth

NASA’s Artemis II crew captured a new image showing the Orientale basin on the right edge of the lunar disk.

CapabilityGeneralValue 3.0Apr 5, 2026TIL there were large swaths of the lunar far side even near the equator that no humans have directly seen before (non-illuminated parts on the left side of the map):

The four Artemis II astronauts were scheduled to reach their closest approach to the Moon on April 6, 2026.

PlanGeneralValue 4.0Apr 5, 2026RT by @AJ_FI: One last look at Earth before we reach the Moon. This view of the Earth was captured on April 5, the fourth day of the Artemis II mission, from inside the Orion spacecraft. The four astronauts will reach their closest approach of the Moon tomorrow, April 6. pic.

During the lunar flyby, the Artemis II crew will witness a solar eclipse from space as the Moon passes between the spacecraft and the Sun.

PlanValue 3.5Apr 5, 2026Earth

Artemis II was expected to cross into the Moon’s sphere of influence just after midnight in the early hours of Monday, April 6, 2026.

PlanValue 3.5Apr 5, 2026Earth

Artemis II will fly about 4,000 miles above the Moon, far above the 70-mile orbits of the Apollo era.

CapabilityGeneralValue 3.5Apr 5, 2026Earth

The Artemis II crew was over 200,000 miles from Earth and approaching the Moon’s sphere of influence.

GeneralValue 4.0Apr 5, 2026Earth

On Sunday, April 5, 2026, Artemis II was in Flight Day 5.

PlanGeneralValue 2.5Apr 5, 2026Earth

The Artemis II crew will set a new record for the farthest distance humans have traveled from Earth.

GeneralValue 2.2Apr 5, 2026Earth

The Artemis II crew was relying on contingency collection bags because of a malfunction in Orion’s waste management system.

CapabilityValue 3.5Apr 5, 2026Earth

Artemis II is a crewed lunar flyby mission.

GeneralValue 3.0Apr 5, 2026RT by @AJ_FI: NASA finalizes science plans for Artemis 2 lunar flyby pic.

The Artemis II astronauts were conducting final checks on their Orion Crew Survival Suits.

PlanCapabilityValue 3.0Apr 5, 2026Earth