Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Dragonfly

retired
Technology DemonstrationLEOCOSPAR 1998-067XHLaunched 8/24/2025
Admin Edit
Mission & Launch
Launch Mission
Zarya
Launch Vehicle
Falcon 9
Launch Date
8/24/2025
Last Contact
12/22/2025
Orbit & Mass
Orbit Class
LEO
Altitude
410.5 km
Inclination
51.63 deg
Dry Mass
2 kg
Total Mass
2 kg
Payload Classification
Mission Type
Technology Demonstration
Payload Category
TECH
Payload Class
A
Organizations
Operator
Kyushu Institute of Technology
Manufacturer
Kyushu Institute of Technology
Registry
COSPAR ID
1998-067XH
Track
Mentions
144
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

A project replan using a revised budget profile set a new Dragonfly launch readiness date of July 2028.

PlanFinancialValue 4.0Nov 28, 2023NASA postpones Dragonfly review, launch date

NASA originally selected Dragonfly in 2019 as part of the New Frontiers program.

Page5of8
PlanValue 3.5Nov 28, 2023NASA postpones Dragonfly review, launch date

The Dragonfly spacecraft will travel roughly 3.6 billion miles to reach Titan.

PlanCapabilityValue 3.6Jul 10, 2023Redwire's Critical Navigation Technology to Support NASA’s Dragonfly Mission

The DRAGONFLY BUS uses a Xenon electric propulsion system with a thrust of 28 mN.

CapabilityValue 4.2Jun 12, 2023Dragonfly Aerospace Unveils New High-Performance Imaging Satellite Bus for Scientific Applications

The DRAGONFLY BUS provides a payload volume greater than 1000 x 1000 x 1 m.

CapabilityGeneralValue 4.0Jun 12, 2023Dragonfly Aerospace Unveils New High-Performance Imaging Satellite Bus for Scientific Applications

The DRAGONFLY BUS AOCS achieves pointing control accuracy of less than 0.02 degrees.

CapabilityValue 4.4Jun 12, 2023Dragonfly Aerospace Unveils New High-Performance Imaging Satellite Bus for Scientific Applications

The DRAGONFLY BUS supports RS-422, RS-485, and CAN interfaces for TMTC.

CapabilityValue 4.0Jun 12, 2023Dragonfly Aerospace Unveils New High-Performance Imaging Satellite Bus for Scientific Applications

The DRAGONFLY BUS AOCS achieves pointing control stability of less than 0.002 degrees/sec (3-sigma).

CapabilityValue 4.2Jun 12, 2023Dragonfly Aerospace Unveils New High-Performance Imaging Satellite Bus for Scientific Applications

The DRAGONFLY BUS uses an S-Band TMTC communication module with a downlink data rate of 400 kbps.

CapabilityValue 4.0Jun 12, 2023Dragonfly Aerospace Unveils New High-Performance Imaging Satellite Bus for Scientific Applications

The DRAGONFLY BUS S-Band TMTC communication module supports an uplink data rate of 150 kbps.

CapabilityValue 4.2Jun 12, 2023Dragonfly Aerospace Unveils New High-Performance Imaging Satellite Bus for Scientific Applications

NASA Administrator Bill Nelson stated that NASA is still planning to launch Dragonfly in 2027 and that the launch plan has not changed.

PlanValue 4.0May 6, 2023Dragonfly mission studying effects of potential budget cut

NASA announced a one-year delay to Dragonfly’s launch in 2020 to cover costs outside the mission itself, including pandemic-related effects on other planetary missions.

PlanFinancialValue 4.5May 6, 2023Dragonfly mission studying effects of potential budget cut

Dragonfly is scheduled to launch in 2027 and land on Titan in 2034.

PlanValue 4.6May 6, 2023Dragonfly mission studying effects of potential budget cut

NASA requested $327,700,000 for the Dragonfly mission in its fiscal year 2024 budget proposal.

FinancialPlanValue 4.0May 6, 2023Dragonfly mission studying effects of potential budget cut

The fiscal year 2024 budget request for Dragonfly represents an 18.1% reduction from the $400,100,000 Dragonfly received in fiscal year 2023.

FinancialValue 4.0May 6, 2023Dragonfly mission studying effects of potential budget cut

The Dragonfly project completed its preliminary design review in early March 2023.

PlanValue 3.0May 6, 2023Dragonfly mission studying effects of potential budget cut

NASA has allocated a single Multi-Mission RTG (MMRTG) and up to 24 RHUs for the Dragonfly mission to Saturn’s moon Titan, launching in 2027.

PlanCapabilityGeneralValue 4.0May 3, 2023Plutonium availability constrains plans for future planetary missions

Dragonfly Aerospace manufactures two satellite bus models named Dragonfly Bus and uDragonfly Bus.

CapabilityValue 3.0Apr 28, 2023Dragonfly Aerospace Missioning Towards Space Exploration With Their Experience in Space Engineering

NASA is planning to launch the Dragonfly mission to Titan in 2027 and has no plan for a cut in fiscal year 2024.

PlanFinancialValue 3.5Apr 21, 2023Nelson supports continuing restrictions on NASA cooperation with China

NASA requested $327,700,000 for the Dragonfly mission in its fiscal year 2024 budget request.

FinancialValue 4.0Apr 19, 2023NASA warns of near-term cost growth on Mars Sample Return