Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Dragonfly

retired
Technology DemonstrationLEOCOSPAR 1998-067XHLaunched 8/24/2025
Admin Edit
Mission & Launch
Launch Mission
Zarya
Launch Vehicle
Falcon 9
Launch Date
8/24/2025
Last Contact
12/22/2025
Orbit & Mass
Orbit Class
LEO
Altitude
410.5 km
Inclination
51.63 deg
Dry Mass
2 kg
Total Mass
2 kg
Payload Classification
Mission Type
Technology Demonstration
Payload Category
TECH
Payload Class
A
Organizations
Operator
Kyushu Institute of Technology
Manufacturer
Kyushu Institute of Technology
Registry
COSPAR ID
1998-067XH
Track
Mentions
144
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Structural and thermal trials confirmed that the 3-inch-thick foam insulation layer will protect Dragonfly's instruments and systems.

CapabilityValue 4.0Sep 23, 2025NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages

Dragonfly is scheduled to launch aboard a SpaceX Falcon Heavy rocket from NASA's Kennedy Space Center in Florida.

Plan
Page3of8
Value 4.0
Sep 23, 2025
NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages

Dragonfly is a nuclear-powered, car-sized rotorcraft built at Johns Hopkins Applied Physics Laboratory (APL) that will explore Saturn's moon Titan over a three-year mission.

CapabilityPlanValue 5.0Sep 23, 2025NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages

NASA Langley's Transonic Dynamics Tunnel conducted rotor performance tests to study stresses, vibrations, and aeromechanics under Titan-like atmospheric conditions for Dragonfly.

CapabilityGeneralValue 4.0Sep 23, 2025NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages

NASA Goddard scientists completed the Ion Trap Mass Spectrometer, a core element of the Dragonfly Mass Spectrometer (DraMS) designed to identify Titan's chemical composition.

CapabilityPlanValue 4.2Sep 23, 2025NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages

Data from rotor performance tests will inform Dragonfly's navigation and flight software.

CapabilityGeneralValue 3.0Sep 23, 2025NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages

Dragonfly will embark on a six-year cruise to reach Titan, where it will fly between diverse landing sites to analyze Titan's habitability and search for chemical precursors of life.

PlanCapabilityGeneralValue 4.0Sep 23, 2025NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages

The two CubeSats scheduled for release at 5:25 PM to 6:00 PM are 'GHS-01' and 'DRAGONFLY,' both measuring 2U.

PlanCapabilityValue 4.0Sep 19, 2025高校生や大学生が作った衛星、ISS「きぼう」から放出–田村淳さんも参加

DRAGONFLY will host a digital communication competition utilizing the Automatic Packet Reporting System (APRS) for amateur radio operators to share real-time position information, weather data, and messages.

GeneralValue 3.0Sep 19, 2025高校生や大学生が作った衛星、ISS「きぼう」から放出–田村淳さんも参加

DRAGONFLY will also demonstrate volcanic activity monitoring using APRS.

CapabilityValue 3.2Sep 19, 2025高校生や大学生が作った衛星、ISS「きぼう」から放出–田村淳さんも参加

DRAGONFLY was designed and manufactured by Kyushu Institute of Technology.

CapabilityValue 2.5Sep 19, 2025高校生や大学生が作った衛星、ISS「きぼう」から放出–田村淳さんも参加

NASA awarded a contract to SpaceX on 2024-11-25 valued at $256,600,000 for the Falcon Heavy launch and related services for Dragonfly during a launch window running from 2024-07-05 to 2028-07-25.

RelationshipsFinancialPlanValue 5.0Nov 26, 2024NASA selects Falcon Heavy to launch Dragonfly mission

NASA selected SpaceX’s Falcon Heavy to launch the Dragonfly mission to Titan in 2028.

PlanRelationshipsValue 4.5Nov 26, 2024NASA selects Falcon Heavy to launch Dragonfly mission

NASA attributed Dragonfly’s cost increases to budget restrictions that stretched out early development phases and delayed the launch from 2026 to 2028.

PlanFinancialValue 4.0Nov 26, 2024NASA selects Falcon Heavy to launch Dragonfly mission

The New Frontiers program had set a cost cap of $850,000,000 at the time of Dragonfly’s selection in 2019, excluding launch and operations.

FinancialPlanValue 4.0Nov 26, 2024NASA selects Falcon Heavy to launch Dragonfly mission

NASA selected SpaceX to provide launch services for the Dragonfly mission under NASA’s New Frontiers Program.

RelationshipsPlanValue 4.5Nov 25, 2024NASA awards launch services contract for Dragonfly mission

For fiscal years 2025 through 2028, NASA is projecting spending $1,680,000,000 on Dragonfly, which is double the projection for the same period in its 2024 proposal.

FinancialPlanValue 4.0Apr 22, 2024NASA confirms Dragonfly mission despite doubled costs

When NASA selected Dragonfly in June 2019 as a New Frontiers mission, the mission had a Phase A–D cost cap of $850 million, excluding launch and post-launch operations.

FinancialPlanValue 4.5Apr 22, 2024NASA confirms Dragonfly mission despite doubled costs

NASA will procure a heavy-lift launch vehicle for Dragonfly later 2024 to enable arrival at Titan in 2034.

RelationshipsPlanValue 4.0Apr 22, 2024NASA confirms Dragonfly mission despite doubled costs

The 2034 Titan arrival date for Dragonfly matches the date planned when NASA selected the mission in 2019 despite a two-year slip in launch timing since selection.

PlanGovernanceValue 3.0Apr 22, 2024NASA confirms Dragonfly mission despite doubled costs