Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Dragonfly

retired
Technology DemonstrationLEOCOSPAR 1998-067XHLaunched 8/24/2025
Admin Edit
Mission & Launch
Launch Mission
Zarya
Launch Vehicle
Falcon 9
Launch Date
8/24/2025
Last Contact
12/22/2025
Orbit & Mass
Orbit Class
LEO
Altitude
410.5 km
Inclination
51.63 deg
Dry Mass
2 kg
Total Mass
2 kg
Payload Classification
Mission Type
Technology Demonstration
Payload Category
TECH
Payload Class
A
Organizations
Operator
Kyushu Institute of Technology
Manufacturer
Kyushu Institute of Technology
Registry
COSPAR ID
1998-067XH
Track
Mentions
144
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

Dragonfly will conduct flights, collect samples with a cryogenic vacuum drill, and recharge its battery for two days between moves during its planned 40-month surface exploration mission.

PlanCapabilityValue 4.0Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission
Page1of8

Johns Hopkins APL is conducting ground vibration tests on Dragonfly in clean rooms in Laurel, Maryland.

CapabilityGeneralValue 3.7Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

Western University planetary scientist Catherine Neish serves as a Dragonfly co-investigator and anchors the Canadian contribution to the mission.

GeneralValue 2.0Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

The Johns Hopkins Applied Physics Laboratory has completed frame qualification testing for NASA's Dragonfly rotorcraft.

CapabilityValue 4.0Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

Dragonfly is being fitted with 850 custom-made foam tiles for thermal insulation.

CapabilityValue 4.0Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

Dragonfly is expected to arrive at Saturn's moon Titan in 2034.

PlanValue 4.0Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

Dragonfly is currently in its integration and test phase after seven years of development.

PlanCapabilityValue 2.5Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

Engineers have validated Dragonfly's lightweight aluminum honeycomb structure for launch and flight loads.

CapabilityValue 4.3Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

NASA's Dragonfly mission is scheduled to launch in July 2028.

PlanValue 4.0Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

Dragonfly will use onboard cameras to scout landing sites and fly autonomously.

CapabilityValue 3.5Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

Dragonfly will undergo environmental testing in a custom vacuum chamber built to simulate Titan's atmospheric pressure and cryogenic temperatures.

CapabilityPlanValue 3.5Jul 17, 2026NASA Dragonfly rotorcraft enters integration phase ahead of Titan mission

The Dragonfly spacecraft planned for Titan will use an MMRTG.

CapabilityPlanValue 4.0Jul 13, 2026Atoms for space: Past US space nuclear power and propulsion programs

The Mars Organic Molecular Analyzer and the Dragonfly Mass Spectrometer will both perform solution-phase chemical analyses with TMAH.

CapabilityValue 4.0Apr 22, 2026Curiosity rileva molecole organiche mai viste su Marte

The Dragonfly mission is planned for Titan.

PlanValue 3.0Apr 22, 2026Lawmakers Promise to Reject Proposed NASA Cuts—Again

The Dragonfly Mass Spectrometer will explore Titan on NASA's Dragonfly mission.

GeneralValue 3.0Apr 22, 2026Curiosity rileva molecole organiche mai viste su Marte

NASA Administrator Jared Isaacman testified that the FY2027 budget request focuses on building a lunar base, supporting commercial work with LEO, and investing in science programs including the Nancy Grace Roman Telescope and the Dragonfly mission to Titan.

FinancialPlanGeneralValue 4.0Apr 22, 2026Lawmakers Promise to Reject Proposed NASA Cuts—Again

The Dragonfly mission to Titan and the NEO Surveyor are expected to remain on schedule despite the current fiscal climate.

PlanGrowthValue 2.5Apr 13, 2026Global Defense Leaders Convene as Space Symposium 41 Addresses Orbital Security

The proposed NASA budget includes $424 million for the Dragonfly mission to explore Saturn’s moon Titan.

FinancialPlanGeneralValue 4.0Apr 7, 2026Advocates Ready For NASA Science Funding Fight, Part II

NASA plans to launch the Dragonfly mission to Titan in 2028.

PlanValue 4.0Apr 7, 2026La Casa Blanca propone un recorte histórico del 23% en el presupuesto de la NASA para 2027 para priorizar la vuelta a la Luna

Dragonfly will launch in 2028 and arrive at Titan in 2034.

PlanValue 4.0Mar 27, 2026NASA Unveils Initiatives to Achieve America’s National Space Policy