Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Artemis I

retired
Human SpaceflightcislunarCOSPAR 2022-156ALaunched 11/16/2022
Admin Edit
Mission & Launch
Launch Mission
Artemis I Mission
Launch Vehicle
SLS Block 1
Launch Date
11/16/2022
Last Contact
12/11/2022
Orbit & Mass
Orbit Class
cislunar
Altitude
188,655 km
Inclination
30.53 deg
Dry Mass
9,400 kg
Total Mass
26,048 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
C
Organizations
Operator
NASA Johnson Space Center
Manufacturer
Lockheed Martin
Registry
COSPAR ID
2022-156A
UN Registration
ST/SG/SER.E/1091
Track
Mentions
87
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

The SLS configuration used for Artemis II is designed to support crewed flight following the uncrewed Artemis I test.

CapabilityPlanValue 4.0Jan 20, 2026Artemis II: SLS sulla rampa per il lancio verso la Luna

Artemis I launched uncrewed from Space Launch Complex 39B on November 16, 2022.

Page3of5
PlanGeneralValue 4.6Jan 19, 2026The Artemis Campaign: A Brief Cislunar History

Data from Artemis I provided the baseline required to certify the SLS and Orion for human occupancy.

CapabilityValue 3.0Jan 19, 2026The Artemis Campaign: A Brief Cislunar History

Artemis I sent the Orion spacecraft into a distant retrograde lunar orbit and tested the capsule’s heat shield during a high-velocity re-entry that reached 5,000 degrees Fahrenheit.

CapabilityGeneralValue 5.0Jan 19, 2026The Artemis Campaign: A Brief Cislunar History

NASA has incorporated lessons learned from Artemis I into the countdown procedures for the launch.

PlanCapabilityValue 2.5Jan 14, 2026La NASA ultima los preparativos para la misión tripulada Artemis II a la Luna

Artemis I was an uncrewed test flight launched in November 2022 to validate NASA's space exploration systems.

PlanGeneralValue 2.5Nov 26, 2025Axiom Space prueba el rendimiento térmico de sus trajes espaciales para Artemis

NASA has identified the root cause of the heat shield damage on Artemis I, involving gas build-up causing cracking.

CapabilityValue 4.0Nov 19, 2025Can America Beat China Back to the Moon?

The first mission, Artemis I, was launched in November 2022.

PlanValue 4.0Oct 22, 2025NASA、「アルテミス2」の宇宙船オリオンをロケットに搭載–半世紀ぶりの月にまた一歩近づく

NASA delayed the Artemis II flight date to investigate the damage to the heat shield of Artemis I.

PlanValue 4.0Sep 25, 2025Artemis II Astronauts Name Their Ride

The solution for Artemis II's heat shield involves a gentler reentry to prevent gas buildup that caused damage in Artemis I.

CapabilityPlanValue 4.0Sep 25, 2025Artemis II Astronauts Name Their Ride

Orion Deputy Program Manager Debbie Korth indicated that a theoretical crew aboard Artemis I would have been fine despite the heat shield damage.

CapabilityGovernanceValue 3.0Sep 25, 2025Artemis II Astronauts Name Their Ride

The previous Orion spacecraft, which journeyed to the Moon during uncrewed Artemis I in 2022, experienced charring and bolt melting on the heat shield.

CapabilityValue 3.5Sep 25, 2025Artemis II Astronauts Name Their Ride

NASA added strakes near booster attachment points to counter vibration levels observed on Artemis I.

CapabilityPlanValue 4.0Sep 23, 2025NASA Prepares Artemis II Rocket with Crew Upgrades for Lunar Flight

Engineers adjusted booster separation mechanics by angling the separation motors 15 degrees and initiating jettison four seconds earlier than in Artemis I.

PlanCapabilityValue 4.0Sep 23, 2025NASA Prepares Artemis II Rocket with Crew Upgrades for Lunar Flight

NASA's evaluation of Artemis I radiation data found that exposure levels vary based on time spent in the capsule and Orion's orientation in space.

CapabilityGeneralValue 3.5Sep 15, 2025Moon Monday #242: Artemis II advances, and so does Long March 10 🔥

The Orion capsule for Artemis II will carry more radiation sensors compared to Artemis I.

CapabilityPlanValue 3.5Sep 15, 2025Moon Monday #242: Artemis II advances, and so does Long March 10 🔥

Mit Artemis I flogen die Messkörper Helga und Zohar zum Mond, um die Strahlenbelastung zu erfassen.

CapabilityValue 3.5Jun 18, 2025Strahlungsmessung auch während kommender Artemis-Mondmission

The Artemis I heat shield experienced unexpected material loss.

CapabilityValue 3.0Dec 9, 2024NASA’s update on Artemis missions, heat shield investigation findings

The adjustments in the Artemis mission plans follow investigations into heat shield performance during the Artemis I uncrewed mission.

PlanCapabilityValue 3.0Dec 9, 2024NASA’s update on Artemis missions, heat shield investigation findings

The Orion Camera System developed by Redwire in partnership with Lockheed Martin launched on Artemis I and captured images from that mission.

GeneralRelationshipsCapabilityValue 4.3Dec 3, 2024Redwire Partners with YouTuber Mark Rober and CrunchLabs to Enable a Unique Selfie-Taking Satellite for STEAM Outreach