Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Crew Dragon

retired
Human SpaceflightLEOCOSPAR 2019-011ALaunched 3/2/2019
Admin Edit
Mission & Launch
Launch Mission
Crew Dragon DM-1
Launch Vehicle
Falcon 9 FT5
Launch Date
3/2/2019
Last Contact
3/8/2019
Orbit & Mass
Orbit Class
LEO
Altitude
296.5 km
Inclination
51.64 deg
Dry Mass
9,500 kg
Total Mass
13,055 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
B
Organizations
Operator
SpaceX
Manufacturer
SpaceX
Registry
COSPAR ID
2019-011A
UN Registration
ST/SG/SER.E/924
Track
Mentions
510
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

A SpaceX Crew Dragon is scheduled to launch 2020-10-31 with NASA astronauts Michael Hopkins, Victor Glover, Shannon Walker and JAXA astronaut Soichi Noguchi.

PlanGovernanceValue 4.0Sep 28, 2020NASA still searching for source of ISS air leak
Page17of26

The 2020-10-31 Crew Dragon launch will increase the International Space Station crew complement to seven.

PlanGeneralValue 3.0Sep 28, 2020NASA still searching for source of ISS air leak

NASA moved the Crew-1 Crew Dragon launch from 2020-10-23 to 2020-10-31 to deconflict it with Soyuz launch and landing operations and to provide more time to ensure closure of all open work on the ground and aboard the station.

PlanValue 4.0Sep 28, 2020NASA still searching for source of ISS air leak

Axiom Space announced a contract with SpaceX in March for a Crew Dragon mission to the International Space Station no earlier than the second half of 2021.

RelationshipsPlanValue 4.2Sep 18, 2020Reality show latest sign of growing commercial interest in ISS

The CFT mission is expected to arrive at the International Space Station during the SpaceX Crew Dragon Crew-2 mission, which is set to launch in spring 2021 for a six-month stay.

PlanGeneralValue 4.0Aug 28, 2020NASA and Boeing outline schedule of Starliner test flights

SpaceX will refurbish the Demo-2 Crew Dragon spacecraft for use on Crew-2 and will launch it using the same booster that will launch the Crew-1 mission in October 2020.

PlanGeneralValue 4.0Aug 28, 2020NASA and Boeing outline schedule of Starliner test flights

The first operational SpaceX Crew Dragon mission, Crew-1, is scheduled to launch no earlier than 2020-10-23 for a six-month stay on the International Space Station.

PlanValue 4.0Aug 25, 2020NASA astronaut bumped from Soyuz flight added to Starliner mission

The Crew-2 SpaceX Crew Dragon mission is scheduled to launch in the spring of 2021 for a six-month mission.

PlanValue 4.0Aug 25, 2020NASA astronaut bumped from Soyuz flight added to Starliner mission

SpaceX launched astronauts Douglas Hurley and Robert Behnken to the International Space Station for NASA in May using a Crew Dragon spacecraft atop a Falcon 9 rocket.

GeneralCapabilityValue 5.0Aug 18, 2020SpaceX raises $1.9 billion in equity

Crew-1 will use a new Falcon 9 booster and a new Crew Dragon spacecraft.

PlanCapabilityValue 3.8Aug 14, 2020NASA sets late October launch date for first operational Crew Dragon mission

NASA required at least six weeks to complete certification work on the Crew Dragon spacecraft, which pushed the Crew-1 launch into the latter part of September.

PlanCapabilityGeneralValue 4.0Aug 14, 2020NASA sets late October launch date for first operational Crew Dragon mission

SpaceX provided audio from the reentry of the Demo-1 Crew Dragon spacecraft in March 2019.

GeneralCapabilityValue 3.0Aug 5, 2020Demo-2 astronauts praise performance of Crew Dragon spacecraft

Crew Dragon arrived at the International Space Station on 2020-05-31, one day after its launch from Florida.

GeneralPlanValue 3.5Aug 2, 2020Crew Dragon splashes down to end successful test flight

SpaceX received a $2,600,000,000 contract in 2014 for final development and testing of Crew Dragon, which included an uncrewed Demo-1 test flight in March 2019 and up to six operational flights to the station.

RelationshipsFinancialPlanCapabilityValue 5.0Aug 2, 2020Crew Dragon splashes down to end successful test flight

Crew Dragon undocked from the International Space Station on 2020-08-01 at 7:35 p.m. Eastern and performed a series of departure burns to prepare for reentry.

PlanGeneralValue 4.0Aug 2, 2020Crew Dragon splashes down to end successful test flight

Crew Dragon Demo-2 docked with the International Space Station on 2020-05-31.

PlanValue 4.2Aug 1, 2020Crew Dragon undocks from space station

In May 2020, NASA approved SpaceX to begin reusing Crew Dragon spacecraft and Falcon 9 first stages on commercial crew missions starting with Crew-2.

PlanLegalRelationshipsValue 4.0Jul 30, 2020Weather could postpone Crew Dragon return

The certification process leading to formal NASA certification of Crew Dragon for operational flights takes about six weeks.

LegalValue 2.2Jul 30, 2020Weather could postpone Crew Dragon return

The Crew Dragon spacecraft designated for Crew-1 was nearing completion at SpaceX’s Hawthorne, California factory and was scheduled to ship to Florida in early August 2020.

PlanGeneralValue 4.0Jul 30, 2020Weather could postpone Crew Dragon return

Crew Dragon launched on a Falcon 9 rocket on 2020-05-30 and docked with the International Space Station on 2020-05-31.

PlanGeneralValue 4.0Jul 30, 2020Weather could postpone Crew Dragon return