Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Crew Dragon

retired
Human SpaceflightLEOCOSPAR 2019-011ALaunched 3/2/2019
Admin Edit
Mission & Launch
Launch Mission
Crew Dragon DM-1
Launch Vehicle
Falcon 9 FT5
Launch Date
3/2/2019
Last Contact
3/8/2019
Orbit & Mass
Orbit Class
LEO
Altitude
296.5 km
Inclination
51.64 deg
Dry Mass
9,500 kg
Total Mass
13,055 kg
Payload Classification
Mission Type
Human Spaceflight
Payload Category
SS
Payload Class
B
Organizations
Operator
SpaceX
Manufacturer
SpaceX
Registry
COSPAR ID
2019-011A
UN Registration
ST/SG/SER.E/924
Track
Mentions
510
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

SpaceX is scheduled to fly its Crew Dragon Crew-2 mission no earlier than 2021-04-20.

PlanValue 4.0Feb 18, 2021Starliner test flight slips to early April

Jared Isaacman purchased a SpaceX Crew Dragon mission slated for launch no earlier than the fourth quarter of 2021.

Relationships
Page16of26
Plan
Value 3.6
Feb 1, 2021
Entrepreneur purchases SpaceX Crew Dragon mission

SpaceX will use revenue from commercial Crew Dragon missions, including Inspiration4, to help fund development of the Starship vehicle.

FinancialCapabilityValue 4.0Feb 1, 2021Entrepreneur purchases SpaceX Crew Dragon mission

The Inspiration4 mission will use the Crew Dragon spacecraft named Resilience that is currently docked to the International Space Station for NASA’s Crew-1 mission.

PlanCapabilityValue 4.0Feb 1, 2021Entrepreneur purchases SpaceX Crew Dragon mission

Crew-2 will replace the Crew-1 astronauts who flew to the station in November 2020 on the first operational Crew Dragon mission.

PlanValue 4.0Jan 30, 2021Next SpaceX commercial crew mission to launch in April

Falcon 9’s first-stage booster used on Transporter-1 previously supported launch of Crew Dragon’s second demonstration mission, the ANASIS-II mission, a Starlink mission, and Dragon’s 21st cargo resupply mission to the International Space Station.

GeneralValue 3.0Jan 24, 2021SpaceX Transporter-1 Mission Is A “Go” + Is Successfully Launched

Falcon 9’s first stage booster previously supported seven other missions: the SXM-7 mission in December 2020, the RADARSAT Constellation Mission launch in June 2019, Crew Dragon’s first demonstration mission in March 2019, and four Starlink missions.

GeneralValue 3.0Jan 20, 2021SpaceX’s Next Starlink Sixty Sent To Space

SpaceX launched an additional Falcon 9 in 2020 for a suborbital in-flight abort test of the Crew Dragon spacecraft.

PlanCapabilityValue 4.2Jan 7, 2021SpaceX launches Turksat 5A

The Falcon 9 first stage booster used on the SXM-7 mission previously supported Crew Dragon’s Demo-1 flight to the International Space Station.

GeneralCapabilityPlanValue 3.5Dec 13, 2020SpaceX Launches The Sirius XM-7 Satellite

SpaceX performed a suborbital Falcon 9 in-flight abort test of the Crew Dragon spacecraft for NASA in January 2020.

CapabilityRelationshipsValue 4.3Dec 13, 2020SpaceX launches SiriusXM satellite

CRS-21 is the first mission under SpaceX’s Commercial Resupply Services 2 contract using a version of the Crew Dragon spacecraft developed for the commercial crew program.

PlanGeneralRelationshipsValue 4.0Dec 6, 2020SpaceX launches first next-generation cargo Dragon spacecraft to ISS

The SpaceX Crew Dragon spacecraft Resilience docked with the International Space Station on 2020-11-16 at 11:01 p.m. Eastern.

PlanValue 4.0Nov 17, 2020Crew Dragon docks to ISS on first operational mission

The Crew Dragon spacecraft Resilience is scheduled to dock autonomously to the forward port of the station’s Harmony module about 11 p.m. on 2020-11-16.

PlanValue 4.0Nov 16, 2020NASA’s SpaceX Crew-1 astronauts headed to International Space Station

NASA completed a flight readiness review on 2020-11-10 and formally certified the Crew Dragon spacecraft at the end of that review.

PlanCapabilityGovernanceValue 3.5Nov 15, 2020SpaceX launches first operational Crew Dragon mission to ISS

A SpaceX Crew Dragon spacecraft named Resilience launched 2020-11-15 carrying four American and Japanese astronauts to the International Space Station.

PlanGeneralValue 4.0Nov 15, 2020SpaceX launches first operational Crew Dragon mission to ISS

A 2020-11-15 Crew-1 launch would have the Crew Dragon capsule docking with the International Space Station around 11 p.m. Eastern on 2020-11-16.

PlanValue 4.0Nov 13, 2020Weather delays Crew-1 launch

A one-day slip of the Crew-1 launch to 2020-11-15 would result in the Crew Dragon taking approximately 27.5 hours to dock with the International Space Station.

PlanValue 4.0Oct 29, 2020SpaceX finds cause of Falcon 9 engine abort

NASA previously delayed the Crew-1 launch from 2020-10-23 to 2020-10-31 to provide more time to complete certification work on the Crew Dragon spacecraft.

PlanCapabilityValue 4.0Oct 10, 2020NASA delays commercial crew mission to study Falcon 9 engine issue

Commercial Crew Dragon missions for non-NASA customers are not included in the seven NASA missions planned through 2021.

PlanGeneralValue 3.0Sep 30, 2020SpaceX has busy manifest of Dragon missions

Crew-1’s Crew Dragon features an improved backshell that increases wind limits for reentry and raises the probability of acceptable winds from one in seven on Demo-2 to one in four for Crew-1.

CapabilityPlanValue 4.0Sep 29, 2020NASA and SpaceX wrapping up certification of Crew Dragon