Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Swift

active
Science ExplorationLEOCOSPAR 2004-047ALaunched 11/20/2004
Admin Edit
Mission & Launch
Launch Mission
Swift Mission
Launch Vehicle
Delta 7320-10C
Launch Date
11/20/2004
Orbit & Mass
Orbit Class
LEO
Altitude
594 km
Inclination
20.56 deg
Dry Mass
1,470 kg
Total Mass
1,470 kg
Payload Classification
Mission Type
Science Exploration
Payload Category
AST
Payload Class
C
Organizations
Operator
NASA Goddard Space Flight Center
Manufacturer
General Dynamics
Registry
COSPAR ID
2004-047A
UN Registration
ST/SG/SER.E/465
Track
Mentions
178
All verified mentions of this spacecraft in source documents.
0.0-5.0
Actions

LINK was built to rescue NASA’s 2004 Swift telescope, which lacks propulsion of its own.

CapabilityValue 2.5Jul 13, 2026Air Launch Died the Same Week Responsive Space Arrived

Stargazer staged the final Pegasus launch from Kwajalein Atoll to reach Swift’s low-inclination orbit.

Plan
Page1of9
Capability
Value 3.0
Jul 13, 2026
Air Launch Died the Same Week Responsive Space Arrived

Katalyst will perform checkouts and rendezvous with Swift over the next few weeks before observing Swift to characterise it and attempting to dock.

PlanCapabilityValue 3.6Jul 3, 2026And NASA confirmed Pegasus launched and reached orbit! Launch took place at 08:36 UTC. Over the next few weeks, Katalyst will perform checkouts and rendezvous with Swift, after which they will observe Swift to characterise it before attempting to dock. 📸 CYGNSS in 2016

Katalyst will observe Swift to characterize it before attempting to dock.

PlanCapabilityValue 3.5Jul 3, 2026While Northrop now no longer has any manufactured Pegasus rockets, and none on contract, Pegasus isn't officially retired yet. Northrop Grumman said they are open for opportunities, and can make more if needed. However I do think the chance of that happening is small.

Katalyst will perform checkouts and rendezvous with Swift over the next few weeks.

PlanValue 3.2Jul 3, 2026While Northrop now no longer has any manufactured Pegasus rockets, and none on contract, Pegasus isn't officially retired yet. Northrop Grumman said they are open for opportunities, and can make more if needed. However I do think the chance of that happening is small.

Northrop Grumman’s Pegasus XL rocket was carrying LINK, Katalyst Space’s robotic servicing spacecraft for the Swift observatory.

CapabilityGeneralValue 4.0Jul 1, 2026RT by @GewoonLukas_: RT by @GewoonLukas_: Today’s launch of Northrop Grumman’s Pegasus XL rocket carrying LINK, Katalyst Space’s robotic servicing spacecraft to boost our Swift observatory, has been postponed. Next attempt will be no earlier than July 2 at 5:09 a.m. ET. Get updates:

NASA ground controllers implemented a drag-minimization profile for Swift on February 11, 2026.

PlanCapabilityValue 3.0Jun 30, 2026Weather Postpones Launch of NASA’s Swift Telescope Robotic Rescue Mission

LINK will attempt to rendezvous with Swift in low Earth orbit and boost the observatory to a higher altitude.

PlanCapabilityValue 4.0Jun 30, 2026Swift Boost Mission Potentially Launching Today

NASA’s Neil Gehrels Swift Observatory has been gradually losing altitude because increased atmospheric drag from recent solar storms has slowed its orbit.

CapabilityPlanValue 2.2Jun 30, 2026Swift Boost Mission Potentially Launching Today

NASA reduced Swift’s average cross-sectional area by approximately 30% by powering down major science instruments and relaxing solar array orientation rules.

CapabilityPlanValue 2.8Jun 30, 2026Weather Postpones Launch of NASA’s Swift Telescope Robotic Rescue Mission

NASA awarded Katalyst Space the contract in September 2025 to design, build, test, and launch a spacecraft capable of meeting, grabbing, and lifting Swift.

RelationshipsPlanCapabilityValue 4.6Jun 30, 2026Swift Boost Mission Potentially Launching Today

Northrop Grumman’s Pegasus XL rocket was scheduled to carry LINK, Katalyst Space’s robotic servicing spacecraft for NASA’s Swift observatory.

PlanValue 4.0Jun 30, 2026RT by @GewoonLukas_: RT by @GewoonLukas_: Today’s launch of Northrop Grumman’s Pegasus XL rocket carrying LINK, Katalyst Space’s robotic servicing spacecraft to boost our Swift observatory, has been postponed. Next attempt will be no earlier than July 1 at 5:43 a.m. ET. Get updates:

NASA’s Goddard Space Flight Center in Greenbelt, Maryland, and Pennsylvania State University’s Eberly College of Science in University Park made operational changes to keep Swift at least 185 miles above Earth.

CapabilityValue 4.0Jun 30, 2026Swift Boost Mission Potentially Launching Today

NASA chose a reboost mission for Swift to demonstrate a commercial servicing capability and extend the observatory’s scientific lifetime at lower cost than replacing its instruments.

CapabilityPlanFinancialValue 4.2Jun 30, 2026Swift Boost Mission Potentially Launching Today

The drag-minimization profile extended Swift’s point of no return into late October 2026.

PlanCapabilityValue 2.4Jun 30, 2026Weather Postpones Launch of NASA’s Swift Telescope Robotic Rescue Mission

Katalyst Space LINK is ready to launch no earlier than June 30 on a mission to capture and raise NASA’s Neil Gehrels Swift Observatory.

PlanCapabilityGeneralValue 4.0Jun 30, 2026Swift Boost Mission Potentially Launching Today

The next Pegasus-XL launch attempt for the Swift Boost Mission is scheduled for tomorrow at 09:43 UTC.

PlanValue 4.0Jun 30, 2026Unfortunately the Pegasus-XL launch of the Swift Boost Mission was scrubbed due to unfavorable weater conditions. The next launch attempt is tomorrow at 09:43 UTC.

Once on orbit, LINK will rendezvous with Swift over the course of several months and gradually raise its altitude.

PlanValue 3.0Jun 30, 2026Swift Boost Mission Potentially Launching Today

Katalyst planned to repurpose the Link technology demonstration spacecraft to raise Swift’s orbit.

PlanCapabilityValue 4.0Jun 29, 2026A swift effort to boost the prospects for satellite servicing

Link’s commissioning process will take about two weeks, followed by two to three weeks to approach Swift.

PlanValue 3.2Jun 29, 2026A swift effort to boost the prospects for satellite servicing