The Northrop Grumman-built LDPE-1 launched aboard the STP-3 mission in December 2021.
Northrop Grumman built LDPE-1, which launched aboard the STP-3 mission in December 2021.
The Northrop Grumman-built LDPE-1 launched aboard the STP-3 mission in December 2021.
LDPE-1 was launched aboard the STP-3 mission in December 2021.
LDPE-1 launched aboard the Space Test Program mission on 2021-12-07.
LDPE-1 launched aboard the STP-3 mission on 2021-12-07.
LDPE-1 hosted six U.S. Space Force experiments focused on space weather and situational awareness on the STP-3 mission.
Both the STPSat-6 and LDPE-1 spacecraft were built by Northrop Grumman.
The secondary payload was the Long Duration Propulsive ESPA (LDPE-1), a small-satellite adapter ring designed to deploy military experiments.
Space Systems Command’s Rapid Prototyping Division manages the LDPE program with a matrixed LDPE-1 team composed of Los Angeles Air Force Base and Kirtland Air Force Base personnel.
LDPE-1 is scheduled to launch in 2021 with the Space Test Program 3 mission.