Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Peregrine

completedLaunch 2024-006
Launched 1/8/2024HEOService CSat EEO O
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
7 payloads
Colmena 1
retired
Science Exploration
HEO
Colmena 2
retired
Science ExplorationHEO
Colmena 3
retired
Science ExplorationHEO
Colmena 4
retired
Science ExplorationHEO
Colmena 5
retired
Science ExplorationHEO
Iris (2024-006)
retired
Science ExplorationHEO
Peregrine Mission One
active
Science Explorationcislunar
Launch Details
Launch Date
1/8/2024
Launch ID
2024-006
Launch Profile
Sat EEO O
Service Type
C
Orbit
HEO
Launch Stack
Operator
United Launch Alliance (ULA)
Launch Vehicle
Vulcan Centaur VC2S
Launch Site
Space Launch Complex 41, Cape Canaveral (Cape Canaveral Air Station, Florida)US
Payload Summary
Payload Count
7
Payload Status
retired 6 / active 1
Payload Mission Types
Science Exploration 7
Track
Mentions
336
All verified mentions of this mission in source documents.

Peregrine is currently about 234,000 miles away from Earth.

GeneralValue 3.6Jan 14, 2024Update #17 for Peregrine Mission One

The Peregrine spacecraft has been operating in space for 5 days and 8 hours and is about 242,0 m from Earth.

CapabilityValue 2.5Jan 13, 2024Update #16 for Peregrine Mission One

Astrobotic provided power to and received data from nine of the 20 payloads on the Peregrine lander as of 2024-01-11.

RelationshipsCapabilityValue 4.0Jan 11, 2024Astrobotic gets payloads working on ailing Peregrine lander

Peregrine successfully received data from all 9 payloads designed to communicate with the lander.

CapabilityGeneralValue 4.0Jan 11, 2024Update #12 for Peregrine Mission One

Astrobotic released the first images taken by its Peregrine lunar lander on 2024-01-08 showing a disturbance in its insulation layer.

CapabilityPlanGeneralValue 4.0Jan 10, 2024Disappointment as Astrobotic’s Peregrine has “no chance of soft landing on the Moon”

Astrobotic's Peregrine lander carried 20 payloads, including five NASA instruments valued at $108 million.

CapabilityFinancialValue 4.0Jan 8, 2024Success and setbacks

The Peregrine Lunar Lander lifted off at 2:18 a.m. ET on 2024-01-08 from Cape Canaveral Space Force Station in Florida.

PlanValue 4.0Jan 8, 2024Astrobotic’s Peregrine Launches to the Moon

The Peregrine lander includes parts manufactured by hundreds of suppliers across the United States, including 184 companies in Pennsylvania.

CapabilityGeneralValue 3.0Jan 8, 2024Astrobotic’s Peregrine Launches to the Moon

United Launch Alliance's Vulcan Centaur rocket launched from Space Launch Complex 41 at Cape Canaveral carrying Astrobotic's Peregrine lunar lander.

GeneralPlanValue 4.0Jan 8, 2024Success and setbacks

Peregrine established communications with Earth and powered on after the successful launch.

CapabilityPlanValue 3.5Jan 8, 2024Success and setbacks

The launch window to place Peregrine on a highly elliptical orbit with an apogee of 360,000 kilometers was 45 minutes.

PlanCapabilityValue 4.0Jan 8, 2024Success and setbacks

NASA is paying $108,000,000 for Peregrine’s payload delivery.

RelationshipsFinancialValue 4.0Jan 8, 2024Vulcan Centaur launches Peregrine lunar lander on inaugural mission

Peregrine’s original mission timeline planned a lunar landing for 2024-02-23.

PlanValue 4.0Jan 8, 2024Peregrine lander suffers anomaly after launch

NASA’s Commercial Lunar Payload Services program awarded Astrobotic $108,000,000 to fly payloads on the Peregrine mission.

RelationshipsFinancialValue 5.0Jan 8, 2024Peregrine lander suffers anomaly after launch

A maneuver was performed to reorient Peregrine's solar panels after a propulsion system failure.

CapabilityValue 3.8Jan 8, 2024Success and setbacks

Astrobotic's goal is to get Peregrine as close to lunar distance as possible before it loses power.

PlanValue 2.8Jan 8, 2024Success and setbacks

Astrobotic stated that the propulsion system failure was causing a critical loss of propellant for Peregrine.

CapabilityValue 3.5Jan 8, 2024Success and setbacks

The Centaur upper stage placed Peregrine on a highly elliptical orbit that will take it to the moon and into lunar orbit in advance of a landing attempt on 2024-02-23.

PlanCapabilityValue 4.0Jan 8, 2024Vulcan Centaur launches Peregrine lunar lander on inaugural mission

Astrobotic reported an anomaly that prevented Peregrine from achieving a stable sun-pointing orientation.

CapabilityGeneralValue 3.0Jan 8, 2024Success and setbacks

The Mexican space agency AEM is flying five micro-rovers on Peregrine.

CapabilityPlanValue 4.0Jan 8, 2024Success and setbacks
Page6of17