Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin

Mars 2020

completedLaunch 2020-052
Launched 7/30/2020HEOService CGSat EEO E
Admin Edit
Payloads
Assets deployed on this mission, enriched from spacecraft records.
2 payloads
Ingenuity
retired
Science Exploration
interplanetary
Perseverance
active
Science Explorationinterplanetary
Launch Details
Launch Date
7/30/2020
Launch ID
2020-052
Launch Profile
Sat EEO E
Service Type
CG
Customer Type
G
Orbit
HEO
Launch Stack
Operator
United Launch Alliance (ULA)
Launch Vehicle
Atlas V 541 C
Launch Site
Space Launch Complex 41, Cape Canaveral (Cape Canaveral Air Station, Florida)US
Payload Summary
Payload Count
2
Payload Status
retired 1 / active 1
Payload Mission Types
Science Exploration 2
Track
Mentions
134
All verified mentions of this mission in source documents.

Mars 2020 experienced cost overruns that Lori Glaze, acting director of NASA’s planetary science division, said fell below a 15 percent threshold that would require a formal replan.

FinancialGovernanceValue 4.0Mar 26, 2019NASA’s $21 billion budget proposal takes aim at the status quo

NASA estimated Mars 2020’s cost at $2,100,000,000 plus $300,000,000 for its first Martian year of operations at Key Decision Point C in 2016.

FinancialValue 4.0Mar 19, 2019NASA dealing with cost growth on planetary science flagship missions

NASA considered small decreases in other operating Mars missions and cost savings from the end of the Opportunity mission as potential sources of funding to address Mars 2020 cost growth.

FinancialPlanValue 3.0Mar 19, 2019NASA dealing with cost growth on planetary science flagship missions

NASA planned to seek economies within the Mars 2020 project and look to the Mars program to cover some cost growth in order to minimize impacts to the overall planetary portfolio.

FinancialPlanGeneralValue 3.0Mar 19, 2019NASA dealing with cost growth on planetary science flagship missions

NASA indicated it was unlikely to remove an instrument from Mars 2020 because most hardware was already built, integrated, and being tested and removing an instrument would offer limited savings at a late development stage.

PlanValue 3.0Mar 19, 2019NASA dealing with cost growth on planetary science flagship missions

NASA indicated that Mars 2020’s cost growth was less than 15 percent over the agreed-upon cost for the mission.

FinancialGeneralValue 4.0Mar 19, 2019NASA dealing with cost growth on planetary science flagship missions

The fiscal year 2020 budget includes funding for a Mars sample return mission that would collect the sample cached by the Mars 2020 rover and return it to Earth, with a planned launch as soon as 2026.

PlanFinancialValue 4.3Mar 11, 2019NASA budget proposal targets SLS

The lean sample return concept proposes one mission that would land near the Mars 2020 site, use a rover to collect samples, and load them into a small rocket that would launch them into Martian orbit.

PlanCapabilityValue 3.5Feb 26, 2019NASA unlikely to return Mars samples in the 2020s

NASA unveiled a 2017 concept called 'lean sample return' intended to simplify and lower the cost of missions to retrieve and return samples collected by Mars 2020.

PlanFinancialValue 3.5Feb 26, 2019NASA unlikely to return Mars samples in the 2020s

NASA’s fiscal year 2019 budget requested $50,000,000 to support work on future missions after the Mars 2020 rover with an emphasis on planning for missions that will collect and return samples cached by Mars 2020.

FinancialPlanCapabilityValue 4.0Feb 26, 2019NASA unlikely to return Mars samples in the 2020s

NASA has not committed to a MarCO-like relay mission for the Mars 2020 rover, but MarCO’s success opened the possibility of using smallsats on future deep space missions.

PlanGeneralValue 2.0Nov 26, 2018MarCO success vindicates use of cubesats on deep space missions

More than 60 potential Mars 2020 landing sites were considered at the first landing site workshop in 2014.

PlanGeneralValue 2.0Nov 19, 2018NASA selects landing site for Mars 2020 rover

Mars 2020 has an estimated total cost of a little less than $2,500,000,000.

FinancialValue 4.0Nov 19, 2018NASA selects landing site for Mars 2020 rover

Mars 2020 is based on the Curiosity rover design and will use the same skycrane landing system.

CapabilityValue 4.0Nov 19, 2018NASA selects landing site for Mars 2020 rover

Mars 2020 is scheduled to launch in July 2020 on an Atlas V rocket and to land in Jezero Crater in February 2021.

PlanGeneralValue 4.0Nov 19, 2018NASA selects landing site for Mars 2020 rover

Jezero Crater was chosen as the Mars 2020 landing site in part because of the prospects of finding biosignatures of past life there.

GeneralValue 3.3Nov 19, 2018NASA selects landing site for Mars 2020 rover

The Mars Sample Fetch Rover would use a robotic arm to gather samples cached by NASA’s Mars 2020 rover mission.

CapabilityPlanValue 3.5Jul 8, 2018ESA awards Mars sample return study contracts as international cooperation plans take shape

Mars 2020 is the first mission required to deal with samples returned from Mars and thus moves NASA into a new planetary protection regime.

LegalGeneralValue 3.0Jul 2, 2018Report recommends NASA revise its planetary protection policies

The committee concluded that missions like Mars 2020 and Europa Clipper require a reconsideration of how NASA handles planetary protection policy development.

LegalGeneralValue 1.8Jul 2, 2018Report recommends NASA revise its planetary protection policies

The Mars Helicopter will be included on the Mars 2020 rover mission to perform a series of test flights over the course of a month.

PlanCapabilityValue 4.0May 11, 2018NASA agrees to fly helicopter demo on Mars 2020
Page6of7