Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2017 | 1 | 0 |
| 2018 | 1 | 0 |
| 2019 | 1 | 0 |
| 2022 | 1 | 0 |
| 2023 | 2 | 0 |
| 2025 | 2 | 0 |
| 2026 | 0 | 6 |
| 2027 | 0 | 6 |
| 2028 | 0 | 6 |
| 2029 | 0 | 6 |
| 2030 | 0 | 6 |
| 2031 | 0 | 6 |
| 2032 | 0 | 6 |
| 2033 | 0 | 6 |
| 2034 | 0 | 6 |
| 2035 | 0 | 6 |
| 2036 | 0 | 6 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
GSLV Mk III | LEO | 8,000 kg | 600 km | Unknown | ISRO LVM3/GSLV Mk III page |
LVM3 | LEO | 8,000 kg | Unknown | Unknown | ISRO LVM3 page |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| BlueBird-6 | LVM3 | Dec 24, 2025 |
| CMS-03 | LVM3 | Nov 2, 2025 |
| Chandrayaan-3 Mission | LVM3 | Jul 14, 2023 |
| OneWeb India-2 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
GSLV Mk III | Not stated | 1 | Retired |
GSLV Mk III a | Not stated | 1 | Retired |
LVM3 | Not stated | 6 | Active |
| 2037 | 0 | 6 |
| 2038 | 0 | 6 |
| 2039 | 0 | 6 |
| 2040 | 0 | 6 |
| 2041 | 0 | 6 |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2027 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2028 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2029 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2030 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2031 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2032 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2033 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2034 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2035 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2036 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2037 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2038 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2039 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2040 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. |
| 2041 | Satish Dhawan Space Centre | Second Launch Pad | 6 | 20% | Editable low-confidence annual throughput seed. Site-year coverage backfill copied nearest prior site-rate row. |
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
GSLV Mk III |
| Polar |
| 5,796 kg |
| 1,200 km |
| 87.9 deg |
| ISRO LVM3 M2 / OneWeb India-1 mission page |
LVM3 | Polar | 5,796 kg | 1,200 km | 87.9 deg | ISRO LVM3 M2 / OneWeb India-1 mission page |
LVM3 | GTO | 4,000 kg | Unknown | Unknown | ISRO LVM3 page |
GSLV Mk III | GTO | 4,000 kg | Unknown | Unknown | ISRO LVM3/GSLV Mk III page |
LVM3 |
| Mar 26, 2023 |
| OneWeb India-1 | LVM3 | Oct 22, 2022 |
| Chandrayaan-2 Mission | LVM3 | Jul 22, 2019 |
| GSAT-29 Mission | GSLV Mk III | Nov 14, 2018 |
| GSAT-19 | GSLV Mk III a | Jun 5, 2017 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
Editable low-confidence annual throughput seed.
ISRO brings the only successful south pole landing to date, LVM3 launch capability, and Chandrayaan-3 mission cost efficiency to the proposed lunar consortium.
India’s current launch infrastructure requires the LVM3 to launch from the Second Launch Pad at Sriharikota.
India is looking to procure semi-cryogenic engines from Russia for initial LVM3 missions.
India’s planned first space station module explicitly relies on the semi-cryogenic LVM3 to be available.
ISRO plans to upgrade the LVM3 rocket’s core stage with the SE-2000 semi-cryogenic kerolox engine to support Chandrayaan 4.
The LVM3’s lift capacity to geostationary transfer orbit would increase from about 4,400 kilograms to almost 5,000 kilograms with the SE-2000 upgrade.
BlueBird 6 launched on an Indian LVM3 rocket in December.
AST SpaceMobile's predecessor satellite BlueBird 6 launched on an Indian LVM3 rocket in December 2025.
The LVM3 payload capacity upgrade has been delayed by more than 10 years.
BlueBird 6 was the heaviest payload ever launched from an LVM3 vehicle from India.
The First Launch Pad cannot support GSLV Mk II or LVM3 launches because the cryogenic upper stages of those vehicles require increased preparatory infrastructure that predates the FLP.
The PSLV and LVM3 both use the liquid Vikas engine, creating a technological link in propulsion between the two vehicles.
The Second Launch Pad was built in 2005 primarily to launch the heavier GSLV Mk II and LVM3 rockets and can host PSLV launches less frequently.
The third launch pad will be capable of supporting launches of the GSLV Mk II even though ISRO plans to phase out the GSLV Mk II in favor of the LVM3.
The LVM3 has completed eight orbital flights with no failures to date.
The third launch pad will serve as a secondary pad for robotic LVM3 launches and as a standby for human spaceflight contingencies.
After Russia’s 2022 invasion of Ukraine, OneWeb completed deployment of its constellation using SpaceX Falcon 9 and ISRO’s LVM3 rockets.
India is simultaneously developing the large rocket LVM3 and a new launch system.
ISRO launched the BlueBird 6 satellite for AST SpaceMobile on a LVM3 rocket on December 23 at 10:25 p.m. EST.
ISRO stated that BlueBird 6 was the heaviest payload launched from an LVM3 vehicle from India.