Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2024 | 1 | 0 |
| 2025 | 4 | 0 |
| 2026 | 3 | 6 |
| 2027 | 0 | 8 |
| 2028 | 0 | 9 |
| 2029 | 0 | 10 |
| 2030 | 0 | 10 |
| 2031 | 0 | 10 |
| 2032 | 0 | 10 |
| 2033 | 0 | 10 |
| 2034 | 0 | 10 |
| 2035 | 0 | 10 |
| 2036 | 0 | 10 |
| 2037 | 0 | 10 |
| 2038 | 0 | 10 |
| 2039 | 0 | 10 |
| 2040 | 0 | 10 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Ariane 64 Block 2 | LEO | 23,650 kg | Unknown | Unknown | RocketLaunch.org Ariane 64 Block 2 |
Ariane 64 | LEO | 20,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Amazon LE-03 | Ariane 64 | Jun 17, 2026 |
| Amazon LE-02 | Ariane 64 | Apr 30, 2026 |
| Amazon LE-01 | Ariane 64 | Feb 12, 2026 |
| Galileo FOC FM33/34 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Ariane 62 | Not stated | 5 | Active |
Ariane 62 Block 2 | 2 | 0 | Development |
Ariane 64 | Not stated | 3 | Active |
Ariane 64 Block 2 | Not stated | 0 | Development |
| 2041 | 0 | 10 |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 6 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2027 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 8 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2028 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 9 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2029 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2030 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2031 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2032 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2033 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2034 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2035 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2036 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2037 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2038 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2039 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2040 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2041 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Ariane 64 | SSO | 15,500 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 64 | Polar | 15,400 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 12,950 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 11,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 Block 2 | GTO | 11,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 Block 2 | LEO | 11,000 kg | Unknown | Unknown | Manual estimate: Ariane 62 base LEO capacity (10,000 kg, Ariane 6 User's Manual) scaled by ArianeGroup's published ~10% P160C booster performance gain |
Ariane 64 | GTO | 10,700 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | LEO | 10,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Ariane 64 | TLI | 8,600 kg | Unknown | 7 deg | Ariane 6 User's Manual |
Ariane 64 | HEO | 8,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | SSO | 7,200 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 62 | Polar | 7,000 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | escape | 6,900 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 | GTO | 6,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GEO | 5,000 kg | 35,786 km | Unknown | Ariane 6 User's Manual |
Ariane 62 Block 2 | GTO | 4,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 | GTO | 4,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | TLI | 3,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | HEO | 3,300 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | escape | 2,600 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 |
| Dec 17, 2025 |
| Sentinel-1D Mission | Ariane 62 | Nov 4, 2025 |
| METOP-SG A1 Mission | Ariane 62 | Aug 13, 2025 |
| CSO 3 | Ariane 62 | Mar 6, 2025 |
| Dummy Payload | Ariane 62 | Jul 9, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Two heavy-lift rockets, Ariane 64 and ULA Vulcan, launched on the same Thursday.
ArianeGroup was entrusted by the European Space Agency to design and integrate the Ariane 6 launcher.
The first flight of the Ariane 64 four-booster variant launched from French Guiana.
Arianespace inaugurated a new configuration of the Ariane 6 rocket by placing 32 Amazon Leo satellites into Low Earth Orbit.
Arianespace’s Ariane 64 rocket conducted its first launch from French Guiana at 8:45am carrying 32 Amazon low-Earth-orbit satellites.
Arianespace demonstrated Ariane 6 in its full-power Ariane 64 configuration to support large-scale constellation deployments.
The LE-01 flight designation was used by Amazon for the Ariane 64 mission.
Amazon is deploying its Project Kuiper constellation with more than thirty satellites scheduled to be launched aboard an Ariane 64.
Arianespace conducted a successful first launch using the Ariane 64 rocket on February 12, 2026 to deploy the Leo satellites.
The Ariane 64 four-booster variant can deliver more than twice the LEO payload of the Ariane 62 two-booster variant.
Arianespace is working to clear a backlog in order to ensure availability of Ariane 6 rockets for Europe’s IRIS2 secure communications constellation.
VA267 was the first Ariane 6 launch in the Ariane 64 configuration, which is equipped with four boosters.
The flight was the first mission for Arianespace’s Ariane 64 launcher, a configuration of the Ariane 6 platform that uses four boosters.
Ariane 64’s four boosters increase payload mass to orbit to more than double that of the baseline Ariane 6.
The payload on the Ariane 64 mission was the heaviest payload Arianespace had placed into orbit.
Arianespace is responsible for commercial operations of the Ariane 6 launcher.
The VA267 mission used the first Ariane 64, the most powerful version of Ariane 6 equipped with four boosters.
The Feb. 12 mission was the first flight of the Ariane 64 variant of the Ariane 6 rocket.
The Ariane 6 version with four boosters is designated Ariane 64.
The Ariane 64 and United Launch Alliance’s Vulcan rockets both completed their recent missions successfully.