Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2024 | 1 | 0 |
| 2025 | 4 | 0 |
| 2026 | 3 | 6 |
| 2027 | 0 | 8 |
| 2028 | 0 | 9 |
| 2029 | 0 | 10 |
| 2030 | 0 | 10 |
| 2031 | 0 | 10 |
| 2032 | 0 | 10 |
| 2033 | 0 | 10 |
| 2034 | 0 | 10 |
| 2035 | 0 | 10 |
| 2036 | 0 | 10 |
| 2037 | 0 | 10 |
| 2038 | 0 | 10 |
| 2039 | 0 | 10 |
| 2040 | 0 | 10 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Ariane 64 Block 2 | LEO | 23,650 kg | Unknown | Unknown | RocketLaunch.org Ariane 64 Block 2 |
Ariane 64 | LEO | 20,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Amazon LE-03 | Ariane 64 | Jun 17, 2026 |
| Amazon LE-02 | Ariane 64 | Apr 30, 2026 |
| Amazon LE-01 | Ariane 64 | Feb 12, 2026 |
| Galileo FOC FM33/34 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Ariane 62 | Not stated | 5 | Active |
Ariane 62 Block 2 | 2 | 0 | Development |
Ariane 64 | Not stated | 3 | Active |
Ariane 64 Block 2 | Not stated | 0 | Development |
| 2041 | 0 | 10 |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 6 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2027 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 8 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2028 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 9 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2029 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2030 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2031 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2032 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2033 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2034 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2035 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2036 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2037 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2038 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2039 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2040 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2041 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Ariane 64 | SSO | 15,500 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 64 | Polar | 15,400 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 12,950 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 11,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 Block 2 | GTO | 11,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 Block 2 | LEO | 11,000 kg | Unknown | Unknown | Manual estimate: Ariane 62 base LEO capacity (10,000 kg, Ariane 6 User's Manual) scaled by ArianeGroup's published ~10% P160C booster performance gain |
Ariane 64 | GTO | 10,700 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | LEO | 10,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Ariane 64 | TLI | 8,600 kg | Unknown | 7 deg | Ariane 6 User's Manual |
Ariane 64 | HEO | 8,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | SSO | 7,200 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 62 | Polar | 7,000 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | escape | 6,900 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 | GTO | 6,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GEO | 5,000 kg | 35,786 km | Unknown | Ariane 6 User's Manual |
Ariane 62 Block 2 | GTO | 4,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 | GTO | 4,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | TLI | 3,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | HEO | 3,300 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | escape | 2,600 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 |
| Dec 17, 2025 |
| Sentinel-1D Mission | Ariane 62 | Nov 4, 2025 |
| METOP-SG A1 Mission | Ariane 62 | Aug 13, 2025 |
| CSO 3 | Ariane 62 | Mar 6, 2025 |
| Dummy Payload | Ariane 62 | Jul 9, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Mission VA268 is cleared for launch on Ariane 64.
Arianespace has confirmed that the Ariane 6 launcher for mission VA268/LE-02 is in the final phase of the launch campaign.
Arianespace is scheduled to launch Plato on an Ariane 6 rocket in January 2027.
MTG-I2 is scheduled to launch in the summer of 2026 on an Ariane 6 rocket.
Ariane 64 with LE-02 is scheduled to launch about 8 hours after the LA-06 launch.
Ariane 64 is also fully expendable.
The baseline operational context for the Crew Launch Abort Demonstrator is an Ariane 6 rocket launched from ELA4 at the Guiana Space Centre.
The EURASTROS study found that an Ariane 64 rocket could be adapted for crew transport at a cost of €4.1 billion, including four certification flights.
The Ariane 64 mission VA268 will carry 32 Amazon Leo satellites under a 20-meter-long fairing into low Earth orbit.
The next batch of Amazon Leo satellites is scheduled to launch on April 28 aboard an Arianespace Ariane 64 rocket.
Mission VA268 uses Ariane 64.
Ariane 64 is the most powerful version of Ariane 6 and is equipped with four solid rocket boosters.
Amazon plans LA-06 and an Ariane 64 mission later in April 2026.
Mission VA268 uses an Ariane 6 rocket.
Amazon plans to lower its target insertion altitude beginning with the fourth Ariane 64 flight.
On 1 April, SpaceX filed a complaint with the FCC accusing Amazon and Arianespace of deploying 32 satellites into a higher orbit than authorised during a February Ariane 64 launch.
Arianespace’s Ariane 6 rocket delivered Amazon Leo’s first of 18 booked launches on February 13, 2026, and the mission added 32 satellites to the constellation.
Nexus-1 will launch to geostationary transfer orbit on an Ariane 6 rocket from the European spaceport in French Guiana.
Arianespace marked the first flight of Ariane 64 in February.
Arianespace is prioritizing Ariane 64 heavy-lift flights and fewer Ariane 62 medium-lift flights based on demand.