Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2024 | 1 | 0 |
| 2025 | 4 | 0 |
| 2026 | 3 | 6 |
| 2027 | 0 | 8 |
| 2028 | 0 | 9 |
| 2029 | 0 | 10 |
| 2030 | 0 | 10 |
| 2031 | 0 | 10 |
| 2032 | 0 | 10 |
| 2033 | 0 | 10 |
| 2034 | 0 | 10 |
| 2035 | 0 | 10 |
| 2036 | 0 | 10 |
| 2037 | 0 | 10 |
| 2038 | 0 | 10 |
| 2039 | 0 | 10 |
| 2040 | 0 | 10 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Ariane 64 Block 2 | LEO | 23,650 kg | Unknown | Unknown | RocketLaunch.org Ariane 64 Block 2 |
Ariane 64 | LEO | 20,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Amazon LE-03 | Ariane 64 | Jun 17, 2026 |
| Amazon LE-02 | Ariane 64 | Apr 30, 2026 |
| Amazon LE-01 | Ariane 64 | Feb 12, 2026 |
| Galileo FOC FM33/34 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Ariane 62 | Not stated | 5 | Active |
Ariane 62 Block 2 | 2 | 0 | Development |
Ariane 64 | Not stated | 3 | Active |
Ariane 64 Block 2 | Not stated | 0 | Development |
| 2041 | 0 | 10 |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 6 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2027 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 8 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2028 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 9 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2029 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2030 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2031 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2032 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2033 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2034 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2035 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2036 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2037 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2038 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2039 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2040 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2041 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Ariane 64 | SSO | 15,500 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 64 | Polar | 15,400 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 12,950 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 11,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 Block 2 | GTO | 11,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 Block 2 | LEO | 11,000 kg | Unknown | Unknown | Manual estimate: Ariane 62 base LEO capacity (10,000 kg, Ariane 6 User's Manual) scaled by ArianeGroup's published ~10% P160C booster performance gain |
Ariane 64 | GTO | 10,700 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | LEO | 10,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Ariane 64 | TLI | 8,600 kg | Unknown | 7 deg | Ariane 6 User's Manual |
Ariane 64 | HEO | 8,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | SSO | 7,200 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 62 | Polar | 7,000 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | escape | 6,900 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 | GTO | 6,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GEO | 5,000 kg | 35,786 km | Unknown | Ariane 6 User's Manual |
Ariane 62 Block 2 | GTO | 4,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 | GTO | 4,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | TLI | 3,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | HEO | 3,300 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | escape | 2,600 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 |
| Dec 17, 2025 |
| Sentinel-1D Mission | Ariane 62 | Nov 4, 2025 |
| METOP-SG A1 Mission | Ariane 62 | Aug 13, 2025 |
| CSO 3 | Ariane 62 | Mar 6, 2025 |
| Dummy Payload | Ariane 62 | Jul 9, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
The Optus-11 launch will use the Ariane 64 configuration of the Ariane 6 launcher with four solid boosters.
Arianespace will deliver Skyloom’s Node-1 on the Ariane 64 as part of a new rideshare mission product.
Skyloom selected the Ariane 64 operated by Arianespace to deploy the company’s first geostationary laser communications relay node, Node-1.
Kongsberg Defence & Aerospace has signed two contracts with ArianeGroup to deliver technology for the Ariane 6 launcher.
CNES is conducting a study examining how to launch crewed spacecraft from French Guiana using the Ariane 6 rocket.
ESA, working with prime contractor ArianeGroup and the French space agency CNES, has established an independent assessment of the schedule for the Ariane 6 launch vehicle.
Solar Orbiter will launch no earlier than 2031 on an Ariane 6 rocket.
MTG-S1 will launch on an Ariane 64, the Ariane 6 configuration equipped with four solid rocket boosters.
MTG-S1, a sounding satellite that previously had a firm Ariane 5 launch contract, is scheduled to launch in 2023 on an Ariane 6 rocket.
MTG-I2, which had an Ariane 5 contract option, is scheduled to launch on an Ariane 6 rocket in 2025.
The European Space Agency confirmed on 2020-07-09 that the Ariane 6 rocket will not launch before the second half of 2021, representing a delay of at least six months.
ESA is financing 89% of the Ariane 6 rocket’s 3.6-billion-euro development, with ArianeGroup and its industry partners providing the remaining 11%.
At least half of ArianeGroup’s transition batch of 14 Ariane 6 rockets are dedicated to European government customers, including six for the European Commission’s Galileo satellites and one for the French military’s Composante Spatiale Optique-3 imaging satellite.
ArianeGroup is building 15 Ariane 6 rockets: one for the rocket’s maiden flight and 14 in bulk to cover the 2020 to 2023 transition away from the Ariane 5.
One hundred million euros of the funding will be provided as a loan to ArianeGroup to help pay for its share of the costs of developing the Ariane 6 rocket.
The loan to ArianeGroup will help finance facilities in France and Germany that will be used to produce and launch the Ariane 6 rocket.
ESA selected Arianespace to launch the JUpiter ICy moon Explorer (JUICE) aboard the Ariane 64, the inaugural flight of the Ariane 6.
The maiden flight of the Ariane 64 configuration with four strap-on boosters is expected by the end of 2021 and will carry a ViaSat-3 geostationary satellite.
OHB supplies structural components and tanks for the Ariane 5 and upcoming Ariane 6 rockets.
ArianeGroup manufactures the heavy-lift Ariane 5 rocket and is developing the upcoming Ariane 6 rocket.