Polaris Intelligence
Polaris
Intelligence
About
Ctrl K
Sign in
© Polaris Intelligence 2026
PrivacyTermsAdmin
Launch Vehicles
Vehicle family profile

Ariane 6

Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.

ArianeGroupActive
Admin
Variants
4
Canonical variants linked to this family.
Historical missions
8
Missions in the public mission table with actual launch dates.
Peak listed capacity
23,650 kg
Maximum payload capacity across listed variants and orbits.

Launch Cadence

Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.

YearHistorical missionsForecast launches
202410
202540
202636
202708
202809
2029010
2030010
2031010
2032010
2033010
2034010
2035010
2036010
2037010
2038010
2039010
2040010

Performance Specs

Payload capacity by variant and target orbit when structured capacity rows are available.

VariantOrbitCapacityAltitudeInclinationSource
Ariane 64 Block 2
LEO23,650 kgUnknownUnknownRocketLaunch.org Ariane 64 Block 2
Ariane 64
LEO20,000 kg250 km51.6 degAriane 6 User's Manual

Recent Missions

Latest launched missions using variants in this family.

MissionVariantLaunch
Amazon LE-03
Ariane 64
Jun 17, 2026
Amazon LE-02
Ariane 64
Apr 30, 2026
Amazon LE-01
Ariane 64
Feb 12, 2026
Galileo FOC FM33/34

Variants

Canonical variants rolled up into this launch vehicle family.

VariantStagesMissionsStatus
Ariane 62
Not stated5Active
Ariane 62 Block 2
20Development
Ariane 64
Not stated3Active
Ariane 64 Block 2
Not stated0Development
2041010

Forecast Location Split

1 launch location represented.

YearLocationLaunchesConfidenceBasis
2026Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)675%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2027Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)875%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2028Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)975%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2029Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2030Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2031Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2032Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2033Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2034Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2035Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2036Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2037Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2038Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2039Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2040Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
2041Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)1075%Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear...
Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2026 · 75% confidence
6

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2027 · 75% confidence
8

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2028 · 75% confidence
9

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2029 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2030 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ariane 64
SSO15,500 kg500 km97.4 degAriane 6 User's Manual
Ariane 64
Polar15,400 kg900 km90 degAriane 6 User's Manual
Ariane 64
GTO12,950 kgUnknown6 degAriane 6 User's Manual
Ariane 64
GTO11,500 kgUnknown6 degAriane 6 User's Manual
Ariane 64 Block 2
GTO11,500 kgUnknownUnknownArianeGroup Ariane 62/64 key numbers
Ariane 62 Block 2
LEO11,000 kgUnknownUnknownManual estimate: Ariane 62 base LEO capacity (10,000 kg, Ariane 6 User's Manual) scaled by ArianeGroup's published ~10% P160C booster performance gain
Ariane 64
GTO10,700 kgUnknown6 degAriane 6 User's Manual
Ariane 62
LEO10,000 kg250 km51.6 degAriane 6 User's Manual
Ariane 64
TLI8,600 kgUnknown7 degAriane 6 User's Manual
Ariane 64
HEO8,000 kgUnknown6 degAriane 6 User's Manual
Ariane 62
SSO7,200 kg500 km97.4 degAriane 6 User's Manual
Ariane 62
Polar7,000 kg900 km90 degAriane 6 User's Manual
Ariane 64
escape6,900 kgUnknownUnknownAriane 6 User's Manual
Ariane 62
GTO6,000 kgUnknown6 degAriane 6 User's Manual
Ariane 64
GEO5,000 kg35,786 kmUnknownAriane 6 User's Manual
Ariane 62 Block 2
GTO4,500 kgUnknownUnknownArianeGroup Ariane 62/64 key numbers
Ariane 62
GTO4,500 kgUnknown6 degAriane 6 User's Manual
Ariane 62
TLI3,500 kgUnknown6 degAriane 6 User's Manual
Ariane 62
HEO3,300 kgUnknown6 degAriane 6 User's Manual
Ariane 62
escape2,600 kgUnknownUnknownAriane 6 User's Manual
Ariane 62
Dec 17, 2025
Sentinel-1D Mission
Ariane 62
Nov 4, 2025
METOP-SG A1 Mission
Ariane 62
Aug 13, 2025
CSO 3
Ariane 62
Mar 6, 2025
Dummy Payload
Ariane 62
Jul 9, 2024

Forecasted Missions

Upcoming mission rows with announced launch timing.

MissionVariantAnnounced

No forecasted missions

No upcoming announced mission rows are linked to this vehicle family.

Track
Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2031 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2032 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2033 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2034 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2035 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2036 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise)
2037 · 75% confidence
10

Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...

Mentions
451
All verified mentions of this launch vehicle family in source documents.
0.0-5.0
Actions

In April 2021, ArianeGroup awarded MT Aerospace a contract to supply components for the first 14 series-production Ariane 6 rockets.

RelationshipsValue 4.6Sep 27, 2025ArianeGroup Awards Contract for Components of 27 Ariane 6 Rockets

ArianeGroup aims to support up to ten launches per year with the Ariane 6 rocket.

Plan
Page16of23
Growth
Capability
Value 4.0
Sep 27, 2025
ArianeGroup Awards Contract for Components of 27 Ariane 6 Rockets

The first flight of the Ariane 64 rocket was initially expected to occur before the end of 2025.

PlanValue 3.5Sep 25, 2025Ariane 6 Selected to Launch German Military Communications Satellites

On 24 September, Arianespace announced that it had been awarded the contract to launch the SATCOMBw-3 satellites aboard two Ariane 6 rockets.

RelationshipsPlanValue 4.6Sep 25, 2025Ariane 6 Selected to Launch German Military Communications Satellites

Arianespace plans to conduct several Ariane 64 flights in 2026.

PlanGeneralValue 3.5Sep 25, 2025Ariane 6 Selected to Launch German Military Communications Satellites

Arianespace has not yet completed a launch of an Ariane 64 rocket.

PlanGeneralValue 1.6Sep 25, 2025Ariane 6 Selected to Launch German Military Communications Satellites

The Ariane 6 launcher family is built by ArianeGroup, a Franco-German company.

CapabilityGeneralValue 3.0Sep 24, 2025Arianespace to launch German defense satellites SATCOMBw Stufe 3 with Ariane 6

Arianespace has been awarded the contract to launch two SATCOMBw Stufe 3 satellites for the German Armed Forces (Bundeswehr) using two Ariane 6 rockets.

RelationshipsPlanValue 4.5Sep 24, 2025Arianespace to launch German defense satellites SATCOMBw Stufe 3 with Ariane 6

Sentinel-1D will be launched by an Ariane 6 rocket from Kourou, French Guiana, in 2025.

PlanGeneralValue 4.5Sep 18, 2025Sentinel-1D begins streamlined simulations training

MetOp-SG-A1 was launched on August 13 aboard an Ariane 6 rocket from the European Spaceport in French Guiana.

PlanGeneralValue 4.0Sep 3, 2025El nuevo satélite meteorológico MetOp-SG-A1 envía los primeros datos

The mission designated VA264 represents the third flight and second commercial flight of the Ariane 6 rocket operated by Arianespace.

PlanGeneralValue 3.0Jul 29, 2025Launch of the third Ariane 6 rocket carrying the Metop-SGA1 satellite (VA264)

Ariane 6 rocket successfully lifted off from the Guiana Space Centre in Kourou.

PlanGeneralValue 3.5Jul 29, 2025Launch of the third Ariane 6 rocket carrying the Metop-SGA1 satellite (VA264)

The Ariane-6 rocket launched from Europe's spaceport in French Guiana on August 13, 2025, at 2:37 AM CEST.

PlanGeneralValue 3.0Jul 14, 2025Erster Wettersatellit der zweiten MetOp-Generation gestartet

The Ariane-6 rocket is designed to launch missions to low Earth orbits and deep space and can weigh nearly 900 tons at launch.

CapabilityGeneralValue 4.0Jul 14, 2025Erster Wettersatellit der zweiten MetOp-Generation gestartet

The Ariane-6 rocket has a modular design and is over 60 meters tall.

CapabilityValue 4.0Jul 14, 2025Erster Wettersatellit der zweiten MetOp-Generation gestartet

The first satellite of the second generation of MetOp satellites, MetOp-SG-A1, was launched aboard an Ariane-6 rocket.

GeneralPlanValue 4.0Jul 14, 2025Erster Wettersatellit der zweiten MetOp-Generation gestartet

The 2025 Arianespace manifest includes the first flight of the Ariane 64, the Ariane 6 variant with four strap-on solid rocket boosters.

PlanCapabilityValue 4.0Jul 7, 2025The long recovery from a launcher crisis

Amazon has booked 18 Ariane 64 flights to deploy part of its Project Kuiper broadband constellation.

RelationshipsPlanValue 4.5Jul 7, 2025The long recovery from a launcher crisis

The 2025 manifest includes the first flight of the Ariane 64, the four-strapped-booster version of Ariane 6.

PlanGeneralValue 4.0Jul 7, 2025The long recovery from a launcher crisis

Amazon has booked 18 flights of the Ariane 64 to deploy part of its Project Kuiper broadband constellation.

PlanGeneralValue 4.5Jul 7, 2025The long recovery from a launcher crisis