Family-level launch record combining canonical variants, historical missions, public cadence forecasts, and available payload performance specs.
Historical missions are grouped by actual launch year. Forecast cadence uses family-level launch-rate rows.
| Year | Historical missions | Forecast launches |
|---|---|---|
| 2024 | 1 | 0 |
| 2025 | 4 | 0 |
| 2026 | 3 | 6 |
| 2027 | 0 | 8 |
| 2028 | 0 | 9 |
| 2029 | 0 | 10 |
| 2030 | 0 | 10 |
| 2031 | 0 | 10 |
| 2032 | 0 | 10 |
| 2033 | 0 | 10 |
| 2034 | 0 | 10 |
| 2035 | 0 | 10 |
| 2036 | 0 | 10 |
| 2037 | 0 | 10 |
| 2038 | 0 | 10 |
| 2039 | 0 | 10 |
| 2040 | 0 | 10 |
Payload capacity by variant and target orbit when structured capacity rows are available.
| Variant | Orbit | Capacity | Altitude | Inclination | Source |
|---|---|---|---|---|---|
Ariane 64 Block 2 | LEO | 23,650 kg | Unknown | Unknown | RocketLaunch.org Ariane 64 Block 2 |
Ariane 64 | LEO | 20,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Latest launched missions using variants in this family.
| Mission | Variant | Launch |
|---|---|---|
| Amazon LE-03 | Ariane 64 | Jun 17, 2026 |
| Amazon LE-02 | Ariane 64 | Apr 30, 2026 |
| Amazon LE-01 | Ariane 64 | Feb 12, 2026 |
| Galileo FOC FM33/34 |
Canonical variants rolled up into this launch vehicle family.
| Variant | Stages | Missions | Status |
|---|---|---|---|
Ariane 62 | Not stated | 5 | Active |
Ariane 62 Block 2 | 2 | 0 | Development |
Ariane 64 | Not stated | 3 | Active |
Ariane 64 Block 2 | Not stated | 0 | Development |
| 2041 | 0 | 10 |
1 launch location represented.
| Year | Location | Launches | Confidence | Basis |
|---|---|---|---|---|
| 2026 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 6 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2027 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 8 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2028 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 9 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2029 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2030 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2031 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2032 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2033 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2034 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2035 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2036 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2037 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2038 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2039 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2040 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
| 2041 | Ensemble de Lancement Ariane 4, CSG (Centre Spatial Guyanais, Kourou, Guyane Francaise) | 10 | 75% | Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect ear... |
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Ariane 64 | SSO | 15,500 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 64 | Polar | 15,400 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 12,950 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GTO | 11,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 Block 2 | GTO | 11,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 Block 2 | LEO | 11,000 kg | Unknown | Unknown | Manual estimate: Ariane 62 base LEO capacity (10,000 kg, Ariane 6 User's Manual) scaled by ArianeGroup's published ~10% P160C booster performance gain |
Ariane 64 | GTO | 10,700 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | LEO | 10,000 kg | 250 km | 51.6 deg | Ariane 6 User's Manual |
Ariane 64 | TLI | 8,600 kg | Unknown | 7 deg | Ariane 6 User's Manual |
Ariane 64 | HEO | 8,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | SSO | 7,200 kg | 500 km | 97.4 deg | Ariane 6 User's Manual |
Ariane 62 | Polar | 7,000 kg | 900 km | 90 deg | Ariane 6 User's Manual |
Ariane 64 | escape | 6,900 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 | GTO | 6,000 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 64 | GEO | 5,000 kg | 35,786 km | Unknown | Ariane 6 User's Manual |
Ariane 62 Block 2 | GTO | 4,500 kg | Unknown | Unknown | ArianeGroup Ariane 62/64 key numbers |
Ariane 62 | GTO | 4,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | TLI | 3,500 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | HEO | 3,300 kg | Unknown | 6 deg | Ariane 6 User's Manual |
Ariane 62 | escape | 2,600 kg | Unknown | Unknown | Ariane 6 User's Manual |
Ariane 62 |
| Dec 17, 2025 |
| Sentinel-1D Mission | Ariane 62 | Nov 4, 2025 |
| METOP-SG A1 Mission | Ariane 62 | Aug 13, 2025 |
| CSO 3 | Ariane 62 | Mar 6, 2025 |
| Dummy Payload | Ariane 62 | Jul 9, 2024 |
Upcoming mission rows with announced launch timing.
| Mission | Variant | Announced |
|---|---|---|
No forecasted missionsNo upcoming announced mission rows are linked to this vehicle family. | ||
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
Base uses 6 launches in 2026, below the 6-8 target range, then ramps toward 10/year. It stays below ArianeGroup's 11/year production design rate to reflect early production learni...
The Ariane 64 rocket will carry 32 Leo satellites and is scheduled to launch in early 2026 during the first quarter.
The launch vehicle for this mission, designated VA266, was an Ariane 6 rocket equipped with two boosters.
Galileo SAT 33 and SAT 34 are ready for integration onto the Ariane 6 launch vehicle.
Arianespace announced the completion of the encapsulation of Galileo SAT 33 and SAT 34, which are now protected under the fairing of the Ariane 6 launch vehicle.
The Canopée ship has set sail from Bordeaux, transporting the stages of the Ariane 6 launcher to the European spaceport in Kourou.
The payload fairing of the Ariane 6 launch vehicle, which is a carbon fiber composite structure with a 5.4-meter diameter, was manufactured at Beyond Gravity’s facility in Emmen, Switzerland.
The payload fairing protects the payload during the initial ascent through the atmosphere of the Ariane 6 launch vehicle.
The hybrid vessel Canopée will visit several European ports to load Ariane 64 rocket components.
Arianespace has shipped key parts of an Ariane 6 rocket to French Guiana ahead of its first Amazon mission, targeted for early 2026.
The Ariane 64 configuration is designed to deliver over 20 tons to Low-Earth Orbit (LEO).
Preparations for the 1st Amazon Leo launch aboard the 1st Ariane 64 are in full swing.
The first mission, VA267, will be the first for the Ariane 64 configuration with four boosters.
The A62 configuration of the Ariane 6 rocket is equipped with two solid rocket boosters.
The Ariane 6 rocket has enhanced capability to deploy heavier payloads.
The new heavy lift Ariane 6 rocket finally launched last year after repeated delays.
SAT 33 and SAT 34 will be launched on December 17, 2025, aboard an Ariane 6 rocket, specifically the A62 configuration.
Sentinel-1D was launched on 4 November on an Ariane 6 launcher from Europe's Spaceport in French Guiana.
The first batch of Amazon Leo satellites for the inaugural mission aboard Ariane 64 arrived safely in French Guiana.
Missions using Argonaut landers will begin in 2030 with launches on Ariane 6 rockets.
Sentinel-1D was launched on November 4 aboard an Ariane 6 launcher from the European spaceport in French Guiana.